Follow the LastPass Datadog App Integration setup and configuration docs to use LastPass as your SAML IdP.

Note: NoPassword was acquired by LogMeIn, the creator of LastPass. The NoPassword Datadog SAML integration is no longer available. Follow the LastPass integration instructions above.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers