Agent 5 Log Files

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Overview

This page covers Agent 5 log files. Datadog recommends installing or upgrading to Agent 7 for the latest features. For information on installing the latest version of the Agent, follow the Agent 7 Installation Instructions. For information on upgrading to Agent 7 from an earlier version, see Upgrade to Datadog Agent v7.

The Datadog Agent does a logs rollover every 10MB by default. When a rollover occurs, one backup (agent.log.1) is kept. If a previous backup exists, it is overwritten during the rollover. To set the maximum size of one log file and the maximum number of backup files to keep, use log_file_max_size(default: 10485760 bytes) and log_file_max_rolls(default: 1) in the Agent configuration file.

Agent log directory

PlatformCommand
Linux/var/log/datadog/
macOS/var/log/datadog/
Windows Server 2008, Vista and newerC:\ProgramData\Datadog\logs\
Windows Server 2003, XP or olderC:\Documents and Settings\All Users\Application Data\Datadog\logs\
SmartOS/opt/local/datadog/logs/supervisord/
Source build~/.datadog-agent/supervisord/logs/

Note: For Windows Server 2008, Vista, and newer systems, the Agent logs are located in C:\ProgramData\Datadog\logs. ProgramData is a hidden folder.

Agent log files

  • collector.log
  • dogstatsd.log
  • forwarder.log
  • supervisord.log

Agent installation log files

PlatformLocation and file name
Linux$(pwd)/ddagent-install.log
macOS/tmp/dd_agent.log
Windows%TEMP%\MSI*.LOG
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers