Sensitive Data Scanner

Create, update, delete, and retrieve sensitive data scanner groups and rules. See the Sensitive Data Scanner page for more information.

GET https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/confighttps://api.datadoghq.eu/api/v2/sensitive-data-scanner/confighttps://api.ddog-gov.com/api/v2/sensitive-data-scanner/confighttps://api.datadoghq.com/api/v2/sensitive-data-scanner/confighttps://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/confighttps://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config

Información general

List all the Scanning groups in your organization. This endpoint requires the data_scanner_read permission.

Respuesta

OK

Get all groups response.

Expand All

Campo

Tipo

Descripción

data

object

Response data related to the scanning groups.

attributes

object

Attributes of the Sensitive Data configuration.

id

string

ID of the configuration.

relationships

object

Relationships of the configuration.

groups

object

List of groups, ordered.

data

[object]

List of groups. The order is important.

id

string

ID of the group.

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

type

enum

Sensitive Data Scanner configuration type. Allowed enum values: sensitive_data_scanner_configuration

default: sensitive_data_scanner_configuration

included

[ <oneOf>]

Included objects from relationships.

Option 1

object

A Scanning Rule included item.

attributes

object

Attributes of the Sensitive Data Scanner rule.

description

string

Description of the rule.

excluded_namespaces

[string]

Attributes excluded from the scan. If namespaces is provided, it has to be a sub-path of the namespaces array.

included_keyword_configuration

object

Object defining a set of keywords and a number of characters that help reduce noise. You can provide a list of keywords you would like to check within a defined proximity of the matching pattern. If any of the keywords are found within the proximity check, the match is kept. If none are found, the match is discarded.

character_count [required]

int64

The number of characters behind a match detected by Sensitive Data Scanner to look for the keywords defined. character_count should be greater than the maximum length of a keyword defined for a rule.

keywords [required]

[string]

Keyword list that will be checked during scanning in order to validate a match. The number of keywords in the list must be less than or equal to 30.

use_recommended_keywords

boolean

Should the rule use the underlying standard pattern keyword configuration. If set to true, the rule must be tied to a standard pattern. If set to false, the specified keywords and character_count are applied.

is_enabled

boolean

Whether or not the rule is enabled.

name

string

Name of the rule.

namespaces

[string]

Attributes included in the scan. If namespaces is empty or missing, all attributes except excluded_namespaces are scanned. If both are missing the whole event is scanned.

pattern

string

Not included if there is a relationship to a standard pattern.

priority

int64

Integer from 1 (high) to 5 (low) indicating rule issue severity.

tags

[string]

List of tags.

text_replacement

object

Object describing how the scanned event will be replaced.

number_of_chars

int64

Required if type == 'partial_replacement_from_beginning' or 'partial_replacement_from_end'. It must be > 0.

replacement_string

string

Required if type == 'replacement_string'.

type

enum

Type of the replacement text. None means no replacement. hash means the data will be stubbed. replacement_string means that one can chose a text to replace the data. partial_replacement_from_beginning allows a user to partially replace the data from the beginning, and partial_replacement_from_end on the other hand, allows to replace data from the end. Allowed enum values: none,hash,replacement_string,partial_replacement_from_beginning,partial_replacement_from_end

default: none

id

string

ID of the rule.

relationships

object

Relationships of a scanning rule.

group

object

A scanning group data.

data

object

A scanning group.

id

string

ID of the group.

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

standard_pattern

object

A standard pattern.

data

object

Data containing the standard pattern id.

id

string

ID of the standard pattern.

type

enum

Sensitive Data Scanner standard pattern type. Allowed enum values: sensitive_data_scanner_standard_pattern

default: sensitive_data_scanner_standard_pattern

type

enum

Sensitive Data Scanner rule type. Allowed enum values: sensitive_data_scanner_rule

default: sensitive_data_scanner_rule

Option 2

object

A Scanning Group included item.

attributes

object

Attributes of the Sensitive Data Scanner group.

description

string

Description of the group.

filter

object

Filter for the Scanning Group.

query

string

Query to filter the events.

is_enabled

boolean

Whether or not the group is enabled.

name

string

Name of the group.

product_list

[string]

List of products the scanning group applies.

id

string

ID of the group.

relationships

object

Relationships of the group.

configuration

object

A Sensitive Data Scanner configuration data.

data

object

A Sensitive Data Scanner configuration.

id

string

ID of the configuration.

type

enum

Sensitive Data Scanner configuration type. Allowed enum values: sensitive_data_scanner_configuration

default: sensitive_data_scanner_configuration

rules

object

Rules included in the group.

data

[object]

Rules included in the group. The order is important.

id

string

ID of the rule.

type

enum

Sensitive Data Scanner rule type. Allowed enum values: sensitive_data_scanner_rule

default: sensitive_data_scanner_rule

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

meta

object

Meta response containing information about the API.

count_limit

int64

Maximum number of scanning rules allowed for the org.

group_count_limit

int64

Maximum number of scanning groups allowed for the org.

has_highlight_enabled

boolean

DEPRECATED: (Deprecated) Whether or not scanned events are highlighted in Logs or RUM for the org.

default: true

has_multi_pass_enabled

boolean

DEPRECATED: (Deprecated) Whether or not scanned events have multi-pass enabled.

is_pci_compliant

boolean

Whether or not the org is compliant to the payment card industry standard.

version

int64

Version of the API.

{
  "data": {
    "attributes": {},
    "id": "string",
    "relationships": {
      "groups": {
        "data": [
          {
            "id": "string",
            "type": "sensitive_data_scanner_group"
          }
        ]
      }
    },
    "type": "sensitive_data_scanner_configuration"
  },
  "included": [
    {
      "attributes": {
        "description": "string",
        "excluded_namespaces": [
          "admin.name"
        ],
        "included_keyword_configuration": {
          "character_count": 30,
          "keywords": [
            "credit card",
            "cc"
          ],
          "use_recommended_keywords": false
        },
        "is_enabled": false,
        "name": "string",
        "namespaces": [
          "admin"
        ],
        "pattern": "string",
        "priority": "integer",
        "tags": [],
        "text_replacement": {
          "number_of_chars": "integer",
          "replacement_string": "string",
          "type": "string"
        }
      },
      "id": "string",
      "relationships": {
        "group": {
          "data": {
            "id": "string",
            "type": "sensitive_data_scanner_group"
          }
        },
        "standard_pattern": {
          "data": {
            "id": "string",
            "type": "sensitive_data_scanner_standard_pattern"
          }
        }
      },
      "type": "sensitive_data_scanner_rule"
    }
  ],
  "meta": {
    "count_limit": "integer",
    "group_count_limit": "integer",
    "has_highlight_enabled": false,
    "has_multi_pass_enabled": false,
    "is_pci_compliant": false,
    "version": 0
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
List Scanning Groups returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.list_scanning_groups()

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# List Scanning Groups returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new
p api_instance.list_scanning_groups()

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// List Scanning Groups returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.ListScanningGroups(ctx)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.ListScanningGroups`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.ListScanningGroups`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// List Scanning Groups returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerGetConfigResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    try {
      SensitiveDataScannerGetConfigResponse result = apiInstance.listScanningGroups();
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#listScanningGroups");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// List Scanning Groups returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.list_scanning_groups().await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * List Scanning Groups returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

apiInstance
  .listScanningGroups()
  .then((data: v2.SensitiveDataScannerGetConfigResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PATCH https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/confighttps://api.datadoghq.eu/api/v2/sensitive-data-scanner/confighttps://api.ddog-gov.com/api/v2/sensitive-data-scanner/confighttps://api.datadoghq.com/api/v2/sensitive-data-scanner/confighttps://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/confighttps://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config

Información general

Reorder the list of groups. This endpoint requires the data_scanner_write permission.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

data [required]

object

Data related to the reordering of scanning groups.

id

string

ID of the configuration.

relationships

object

Relationships of the configuration.

groups

object

List of groups, ordered.

data

[object]

List of groups. The order is important.

id

string

ID of the group.

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

type

enum

Sensitive Data Scanner configuration type. Allowed enum values: sensitive_data_scanner_configuration

default: sensitive_data_scanner_configuration

meta [required]

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "data": {
    "relationships": {
      "groups": {
        "data": [
          {
            "type": "sensitive_data_scanner_group",
            "id": "string"
          }
        ]
      }
    },
    "type": "sensitive_data_scanner_configuration",
    "id": "55482444-d71c-c45c-7d1f-31984f64e6d2"
  },
  "meta": {}
}

Respuesta

OK

Group reorder response.

Expand All

Campo

Tipo

Descripción

meta

object

Meta response containing information about the API.

count_limit

int64

Maximum number of scanning rules allowed for the org.

group_count_limit

int64

Maximum number of scanning groups allowed for the org.

has_highlight_enabled

boolean

DEPRECATED: (Deprecated) Whether or not scanned events are highlighted in Logs or RUM for the org.

default: true

has_multi_pass_enabled

boolean

DEPRECATED: (Deprecated) Whether or not scanned events have multi-pass enabled.

is_pci_compliant

boolean

Whether or not the org is compliant to the payment card industry standard.

version

int64

Version of the API.

{
  "meta": {
    "count_limit": "integer",
    "group_count_limit": "integer",
    "has_highlight_enabled": false,
    "has_multi_pass_enabled": false,
    "is_pci_compliant": false,
    "version": 0
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Curl command
curl -X PATCH "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "data": { "relationships": { "groups": { "data": [ { "type": "sensitive_data_scanner_group", "id": "string" } ] } }, "type": "sensitive_data_scanner_configuration", "id": "55482444-d71c-c45c-7d1f-31984f64e6d2" }, "meta": {} } EOF
// Reorder Groups returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "scanning_group" in the system
	GroupDataID := os.Getenv("GROUP_DATA_ID")

	// a valid "configuration" in the system
	ConfigurationDataID := os.Getenv("CONFIGURATION_DATA_ID")

	body := datadogV2.SensitiveDataScannerConfigRequest{
		Data: datadogV2.SensitiveDataScannerReorderConfig{
			Relationships: &datadogV2.SensitiveDataScannerConfigurationRelationships{
				Groups: &datadogV2.SensitiveDataScannerGroupList{
					Data: []datadogV2.SensitiveDataScannerGroupItem{
						{
							Type: datadogV2.SENSITIVEDATASCANNERGROUPTYPE_SENSITIVE_DATA_SCANNER_GROUP.Ptr(),
							Id:   datadog.PtrString(GroupDataID),
						},
					},
				},
			},
			Type: datadogV2.SENSITIVEDATASCANNERCONFIGURATIONTYPE_SENSITIVE_DATA_SCANNER_CONFIGURATIONS.Ptr(),
			Id:   datadog.PtrString(ConfigurationDataID),
		},
		Meta: datadogV2.SensitiveDataScannerMetaVersionOnly{},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.ReorderScanningGroups(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.ReorderScanningGroups`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.ReorderScanningGroups`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Reorder Groups returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfigRequest;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfigurationRelationships;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfigurationType;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupItem;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupList;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupType;
import com.datadog.api.client.v2.model.SensitiveDataScannerMetaVersionOnly;
import com.datadog.api.client.v2.model.SensitiveDataScannerReorderConfig;
import com.datadog.api.client.v2.model.SensitiveDataScannerReorderGroupsResponse;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    // there is a valid "scanning_group" in the system
    String GROUP_DATA_ID = System.getenv("GROUP_DATA_ID");

    // a valid "configuration" in the system
    String CONFIGURATION_DATA_ID = System.getenv("CONFIGURATION_DATA_ID");

    SensitiveDataScannerConfigRequest body =
        new SensitiveDataScannerConfigRequest()
            .data(
                new SensitiveDataScannerReorderConfig()
                    .relationships(
                        new SensitiveDataScannerConfigurationRelationships()
                            .groups(
                                new SensitiveDataScannerGroupList()
                                    .data(
                                        Collections.singletonList(
                                            new SensitiveDataScannerGroupItem()
                                                .type(
                                                    SensitiveDataScannerGroupType
                                                        .SENSITIVE_DATA_SCANNER_GROUP)
                                                .id(GROUP_DATA_ID)))))
                    .type(
                        SensitiveDataScannerConfigurationType.SENSITIVE_DATA_SCANNER_CONFIGURATIONS)
                    .id(CONFIGURATION_DATA_ID))
            .meta(new SensitiveDataScannerMetaVersionOnly());

    try {
      SensitiveDataScannerReorderGroupsResponse result = apiInstance.reorderScanningGroups(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#reorderScanningGroups");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Reorder Groups returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi
from datadog_api_client.v2.model.sensitive_data_scanner_config_request import SensitiveDataScannerConfigRequest
from datadog_api_client.v2.model.sensitive_data_scanner_configuration_relationships import (
    SensitiveDataScannerConfigurationRelationships,
)
from datadog_api_client.v2.model.sensitive_data_scanner_configuration_type import SensitiveDataScannerConfigurationType
from datadog_api_client.v2.model.sensitive_data_scanner_group_item import SensitiveDataScannerGroupItem
from datadog_api_client.v2.model.sensitive_data_scanner_group_list import SensitiveDataScannerGroupList
from datadog_api_client.v2.model.sensitive_data_scanner_group_type import SensitiveDataScannerGroupType
from datadog_api_client.v2.model.sensitive_data_scanner_meta_version_only import SensitiveDataScannerMetaVersionOnly
from datadog_api_client.v2.model.sensitive_data_scanner_reorder_config import SensitiveDataScannerReorderConfig

# there is a valid "scanning_group" in the system
GROUP_DATA_ID = environ["GROUP_DATA_ID"]

# a valid "configuration" in the system
CONFIGURATION_DATA_ID = environ["CONFIGURATION_DATA_ID"]

body = SensitiveDataScannerConfigRequest(
    data=SensitiveDataScannerReorderConfig(
        relationships=SensitiveDataScannerConfigurationRelationships(
            groups=SensitiveDataScannerGroupList(
                data=[
                    SensitiveDataScannerGroupItem(
                        type=SensitiveDataScannerGroupType.SENSITIVE_DATA_SCANNER_GROUP,
                        id=GROUP_DATA_ID,
                    ),
                ],
            ),
        ),
        type=SensitiveDataScannerConfigurationType.SENSITIVE_DATA_SCANNER_CONFIGURATIONS,
        id=CONFIGURATION_DATA_ID,
    ),
    meta=SensitiveDataScannerMetaVersionOnly(),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.reorder_scanning_groups(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Reorder Groups returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new

# there is a valid "scanning_group" in the system
GROUP_DATA_ID = ENV["GROUP_DATA_ID"]

# a valid "configuration" in the system
CONFIGURATION_DATA_ID = ENV["CONFIGURATION_DATA_ID"]

body = DatadogAPIClient::V2::SensitiveDataScannerConfigRequest.new({
  data: DatadogAPIClient::V2::SensitiveDataScannerReorderConfig.new({
    relationships: DatadogAPIClient::V2::SensitiveDataScannerConfigurationRelationships.new({
      groups: DatadogAPIClient::V2::SensitiveDataScannerGroupList.new({
        data: [
          DatadogAPIClient::V2::SensitiveDataScannerGroupItem.new({
            type: DatadogAPIClient::V2::SensitiveDataScannerGroupType::SENSITIVE_DATA_SCANNER_GROUP,
            id: GROUP_DATA_ID,
          }),
        ],
      }),
    }),
    type: DatadogAPIClient::V2::SensitiveDataScannerConfigurationType::SENSITIVE_DATA_SCANNER_CONFIGURATIONS,
    id: CONFIGURATION_DATA_ID,
  }),
  meta: DatadogAPIClient::V2::SensitiveDataScannerMetaVersionOnly.new({}),
})
p api_instance.reorder_scanning_groups(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Reorder Groups returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfigRequest;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfigurationRelationships;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfigurationType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupItem;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupList;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerMetaVersionOnly;
use datadog_api_client::datadogV2::model::SensitiveDataScannerReorderConfig;

#[tokio::main]
async fn main() {
    // there is a valid "scanning_group" in the system
    let group_data_id = std::env::var("GROUP_DATA_ID").unwrap();

    // a valid "configuration" in the system
    let configuration_data_id = std::env::var("CONFIGURATION_DATA_ID").unwrap();
    let body = SensitiveDataScannerConfigRequest::new(
        SensitiveDataScannerReorderConfig::new()
            .id(configuration_data_id.clone())
            .relationships(
                SensitiveDataScannerConfigurationRelationships::new().groups(
                    SensitiveDataScannerGroupList::new().data(vec![
                        SensitiveDataScannerGroupItem::new()
                            .id(group_data_id.clone())
                            .type_(SensitiveDataScannerGroupType::SENSITIVE_DATA_SCANNER_GROUP),
                    ]),
                ),
            )
            .type_(SensitiveDataScannerConfigurationType::SENSITIVE_DATA_SCANNER_CONFIGURATIONS),
        SensitiveDataScannerMetaVersionOnly::new(),
    );
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.reorder_scanning_groups(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Reorder Groups returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

// there is a valid "scanning_group" in the system
const GROUP_DATA_ID = process.env.GROUP_DATA_ID as string;

// a valid "configuration" in the system
const CONFIGURATION_DATA_ID = process.env.CONFIGURATION_DATA_ID as string;

const params: v2.SensitiveDataScannerApiReorderScanningGroupsRequest = {
  body: {
    data: {
      relationships: {
        groups: {
          data: [
            {
              type: "sensitive_data_scanner_group",
              id: GROUP_DATA_ID,
            },
          ],
        },
      },
      type: "sensitive_data_scanner_configuration",
      id: CONFIGURATION_DATA_ID,
    },
    meta: {},
  },
};

apiInstance
  .reorderScanningGroups(params)
  .then((data: v2.SensitiveDataScannerReorderGroupsResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/config/standard-patternshttps://api.datadoghq.eu/api/v2/sensitive-data-scanner/config/standard-patternshttps://api.ddog-gov.com/api/v2/sensitive-data-scanner/config/standard-patternshttps://api.datadoghq.com/api/v2/sensitive-data-scanner/config/standard-patternshttps://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/config/standard-patternshttps://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/standard-patterns

Información general

Returns all standard patterns. This endpoint requires the data_scanner_read permission.

Respuesta

OK

List Standard patterns response data.

Expand All

Campo

Tipo

Descripción

data

[object]

List Standard patterns response.

attributes

object

Attributes of the Sensitive Data Scanner standard pattern.

description

string

Description of the standard pattern.

included_keywords

[string]

List of included keywords.

name

string

Name of the standard pattern.

pattern

string

DEPRECATED: (Deprecated) Regex to match, optionally documented for older standard rules. Refer to the description field to understand what the rule does.

priority

int64

Integer from 1 (high) to 5 (low) indicating standard pattern issue severity.

tags

[string]

List of tags.

id

string

ID of the standard pattern.

type

enum

Sensitive Data Scanner standard pattern type. Allowed enum values: sensitive_data_scanner_standard_pattern

default: sensitive_data_scanner_standard_pattern

{
  "data": [
    {
      "attributes": {
        "description": "string",
        "included_keywords": [],
        "name": "string",
        "pattern": "string",
        "priority": "integer",
        "tags": []
      },
      "id": "string",
      "type": "sensitive_data_scanner_standard_pattern"
    }
  ]
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/standard-patterns" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
List standard patterns returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.list_standard_patterns()

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# List standard patterns returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new
p api_instance.list_standard_patterns()

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// List standard patterns returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.ListStandardPatterns(ctx)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.ListStandardPatterns`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.ListStandardPatterns`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// List standard patterns returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerStandardPatternsResponseData;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    try {
      SensitiveDataScannerStandardPatternsResponseData result = apiInstance.listStandardPatterns();
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#listStandardPatterns");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// List standard patterns returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.list_standard_patterns().await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * List standard patterns returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

apiInstance
  .listStandardPatterns()
  .then((data: v2.SensitiveDataScannerStandardPatternsResponseData) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

POST https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/config/groupshttps://api.datadoghq.eu/api/v2/sensitive-data-scanner/config/groupshttps://api.ddog-gov.com/api/v2/sensitive-data-scanner/config/groupshttps://api.datadoghq.com/api/v2/sensitive-data-scanner/config/groupshttps://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/config/groupshttps://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/groups

Información general

Create a scanning group. The request MAY include a configuration relationship. A rules relationship can be omitted entirely, but if it is included it MUST be null or an empty array (rules cannot be created at the same time). The new group will be ordered last within the configuration. This endpoint requires the data_scanner_write permission.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

data

object

Data related to the creation of a group.

attributes [required]

object

Attributes of the Sensitive Data Scanner group.

description

string

Description of the group.

filter

object

Filter for the Scanning Group.

query

string

Query to filter the events.

is_enabled

boolean

Whether or not the group is enabled.

name

string

Name of the group.

product_list

[string]

List of products the scanning group applies.

relationships

object

Relationships of the group.

configuration

object

A Sensitive Data Scanner configuration data.

data

object

A Sensitive Data Scanner configuration.

id

string

ID of the configuration.

type

enum

Sensitive Data Scanner configuration type. Allowed enum values: sensitive_data_scanner_configuration

default: sensitive_data_scanner_configuration

rules

object

Rules included in the group.

data

[object]

Rules included in the group. The order is important.

id

string

ID of the rule.

type

enum

Sensitive Data Scanner rule type. Allowed enum values: sensitive_data_scanner_rule

default: sensitive_data_scanner_rule

type [required]

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

meta

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {},
  "data": {
    "type": "sensitive_data_scanner_group",
    "attributes": {
      "name": "Example-Sensitive-Data-Scanner",
      "is_enabled": false,
      "product_list": [
        "logs"
      ],
      "filter": {
        "query": "*"
      }
    },
    "relationships": {
      "configuration": {
        "data": {
          "type": "sensitive_data_scanner_configuration",
          "id": "string"
        }
      },
      "rules": {
        "data": []
      }
    }
  }
}

Respuesta

OK

Create group response.

Expand All

Campo

Tipo

Descripción

data

object

Response data related to the creation of a group.

attributes

object

Attributes of the Sensitive Data Scanner group.

description

string

Description of the group.

filter

object

Filter for the Scanning Group.

query

string

Query to filter the events.

is_enabled

boolean

Whether or not the group is enabled.

name

string

Name of the group.

product_list

[string]

List of products the scanning group applies.

id

string

ID of the group.

relationships

object

Relationships of the group.

configuration

object

A Sensitive Data Scanner configuration data.

data

object

A Sensitive Data Scanner configuration.

id

string

ID of the configuration.

type

enum

Sensitive Data Scanner configuration type. Allowed enum values: sensitive_data_scanner_configuration

default: sensitive_data_scanner_configuration

rules

object

Rules included in the group.

data

[object]

Rules included in the group. The order is important.

id

string

ID of the rule.

type

enum

Sensitive Data Scanner rule type. Allowed enum values: sensitive_data_scanner_rule

default: sensitive_data_scanner_rule

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

meta

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "data": {
    "attributes": {
      "description": "string",
      "filter": {
        "query": "string"
      },
      "is_enabled": false,
      "name": "string",
      "product_list": []
    },
    "id": "string",
    "relationships": {
      "configuration": {
        "data": {
          "id": "string",
          "type": "sensitive_data_scanner_configuration"
        }
      },
      "rules": {
        "data": [
          {
            "id": "string",
            "type": "sensitive_data_scanner_rule"
          }
        ]
      }
    },
    "type": "sensitive_data_scanner_group"
  },
  "meta": {
    "version": 0
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/groups" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "meta": {}, "data": { "type": "sensitive_data_scanner_group", "attributes": { "name": "Example-Sensitive-Data-Scanner", "is_enabled": false, "product_list": [ "logs" ], "filter": { "query": "*" } }, "relationships": { "configuration": { "data": { "type": "sensitive_data_scanner_configuration", "id": "string" } }, "rules": { "data": [] } } } } EOF
// Create Scanning Group returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// a valid "configuration" in the system
	ConfigurationDataID := os.Getenv("CONFIGURATION_DATA_ID")

	body := datadogV2.SensitiveDataScannerGroupCreateRequest{
		Meta: &datadogV2.SensitiveDataScannerMetaVersionOnly{},
		Data: &datadogV2.SensitiveDataScannerGroupCreate{
			Type: datadogV2.SENSITIVEDATASCANNERGROUPTYPE_SENSITIVE_DATA_SCANNER_GROUP,
			Attributes: datadogV2.SensitiveDataScannerGroupAttributes{
				Name:      datadog.PtrString("Example-Sensitive-Data-Scanner"),
				IsEnabled: datadog.PtrBool(false),
				ProductList: []datadogV2.SensitiveDataScannerProduct{
					datadogV2.SENSITIVEDATASCANNERPRODUCT_LOGS,
				},
				Filter: &datadogV2.SensitiveDataScannerFilter{
					Query: datadog.PtrString("*"),
				},
			},
			Relationships: &datadogV2.SensitiveDataScannerGroupRelationships{
				Configuration: &datadogV2.SensitiveDataScannerConfigurationData{
					Data: &datadogV2.SensitiveDataScannerConfiguration{
						Type: datadogV2.SENSITIVEDATASCANNERCONFIGURATIONTYPE_SENSITIVE_DATA_SCANNER_CONFIGURATIONS.Ptr(),
						Id:   datadog.PtrString(ConfigurationDataID),
					},
				},
				Rules: &datadogV2.SensitiveDataScannerRuleData{
					Data: []datadogV2.SensitiveDataScannerRule{},
				},
			},
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.CreateScanningGroup(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.CreateScanningGroup`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.CreateScanningGroup`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Create Scanning Group returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfiguration;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfigurationData;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfigurationType;
import com.datadog.api.client.v2.model.SensitiveDataScannerCreateGroupResponse;
import com.datadog.api.client.v2.model.SensitiveDataScannerFilter;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupAttributes;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupCreate;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupCreateRequest;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupRelationships;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupType;
import com.datadog.api.client.v2.model.SensitiveDataScannerMetaVersionOnly;
import com.datadog.api.client.v2.model.SensitiveDataScannerProduct;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleData;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    // a valid "configuration" in the system
    String CONFIGURATION_DATA_ID = System.getenv("CONFIGURATION_DATA_ID");

    SensitiveDataScannerGroupCreateRequest body =
        new SensitiveDataScannerGroupCreateRequest()
            .meta(new SensitiveDataScannerMetaVersionOnly())
            .data(
                new SensitiveDataScannerGroupCreate()
                    .type(SensitiveDataScannerGroupType.SENSITIVE_DATA_SCANNER_GROUP)
                    .attributes(
                        new SensitiveDataScannerGroupAttributes()
                            .name("Example-Sensitive-Data-Scanner")
                            .isEnabled(false)
                            .productList(
                                Collections.singletonList(SensitiveDataScannerProduct.LOGS))
                            .filter(new SensitiveDataScannerFilter().query("*")))
                    .relationships(
                        new SensitiveDataScannerGroupRelationships()
                            .configuration(
                                new SensitiveDataScannerConfigurationData()
                                    .data(
                                        new SensitiveDataScannerConfiguration()
                                            .type(
                                                SensitiveDataScannerConfigurationType
                                                    .SENSITIVE_DATA_SCANNER_CONFIGURATIONS)
                                            .id(CONFIGURATION_DATA_ID)))
                            .rules(new SensitiveDataScannerRuleData())));

    try {
      SensitiveDataScannerCreateGroupResponse result = apiInstance.createScanningGroup(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#createScanningGroup");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Create Scanning Group returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi
from datadog_api_client.v2.model.sensitive_data_scanner_configuration import SensitiveDataScannerConfiguration
from datadog_api_client.v2.model.sensitive_data_scanner_configuration_data import SensitiveDataScannerConfigurationData
from datadog_api_client.v2.model.sensitive_data_scanner_configuration_type import SensitiveDataScannerConfigurationType
from datadog_api_client.v2.model.sensitive_data_scanner_filter import SensitiveDataScannerFilter
from datadog_api_client.v2.model.sensitive_data_scanner_group_attributes import SensitiveDataScannerGroupAttributes
from datadog_api_client.v2.model.sensitive_data_scanner_group_create import SensitiveDataScannerGroupCreate
from datadog_api_client.v2.model.sensitive_data_scanner_group_create_request import (
    SensitiveDataScannerGroupCreateRequest,
)
from datadog_api_client.v2.model.sensitive_data_scanner_group_relationships import (
    SensitiveDataScannerGroupRelationships,
)
from datadog_api_client.v2.model.sensitive_data_scanner_group_type import SensitiveDataScannerGroupType
from datadog_api_client.v2.model.sensitive_data_scanner_meta_version_only import SensitiveDataScannerMetaVersionOnly
from datadog_api_client.v2.model.sensitive_data_scanner_product import SensitiveDataScannerProduct
from datadog_api_client.v2.model.sensitive_data_scanner_rule_data import SensitiveDataScannerRuleData

# a valid "configuration" in the system
CONFIGURATION_DATA_ID = environ["CONFIGURATION_DATA_ID"]

body = SensitiveDataScannerGroupCreateRequest(
    meta=SensitiveDataScannerMetaVersionOnly(),
    data=SensitiveDataScannerGroupCreate(
        type=SensitiveDataScannerGroupType.SENSITIVE_DATA_SCANNER_GROUP,
        attributes=SensitiveDataScannerGroupAttributes(
            name="Example-Sensitive-Data-Scanner",
            is_enabled=False,
            product_list=[
                SensitiveDataScannerProduct.LOGS,
            ],
            filter=SensitiveDataScannerFilter(
                query="*",
            ),
        ),
        relationships=SensitiveDataScannerGroupRelationships(
            configuration=SensitiveDataScannerConfigurationData(
                data=SensitiveDataScannerConfiguration(
                    type=SensitiveDataScannerConfigurationType.SENSITIVE_DATA_SCANNER_CONFIGURATIONS,
                    id=CONFIGURATION_DATA_ID,
                ),
            ),
            rules=SensitiveDataScannerRuleData(
                data=[],
            ),
        ),
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.create_scanning_group(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Create Scanning Group returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new

# a valid "configuration" in the system
CONFIGURATION_DATA_ID = ENV["CONFIGURATION_DATA_ID"]

body = DatadogAPIClient::V2::SensitiveDataScannerGroupCreateRequest.new({
  meta: DatadogAPIClient::V2::SensitiveDataScannerMetaVersionOnly.new({}),
  data: DatadogAPIClient::V2::SensitiveDataScannerGroupCreate.new({
    type: DatadogAPIClient::V2::SensitiveDataScannerGroupType::SENSITIVE_DATA_SCANNER_GROUP,
    attributes: DatadogAPIClient::V2::SensitiveDataScannerGroupAttributes.new({
      name: "Example-Sensitive-Data-Scanner",
      is_enabled: false,
      product_list: [
        DatadogAPIClient::V2::SensitiveDataScannerProduct::LOGS,
      ],
      filter: DatadogAPIClient::V2::SensitiveDataScannerFilter.new({
        query: "*",
      }),
    }),
    relationships: DatadogAPIClient::V2::SensitiveDataScannerGroupRelationships.new({
      configuration: DatadogAPIClient::V2::SensitiveDataScannerConfigurationData.new({
        data: DatadogAPIClient::V2::SensitiveDataScannerConfiguration.new({
          type: DatadogAPIClient::V2::SensitiveDataScannerConfigurationType::SENSITIVE_DATA_SCANNER_CONFIGURATIONS,
          id: CONFIGURATION_DATA_ID,
        }),
      }),
      rules: DatadogAPIClient::V2::SensitiveDataScannerRuleData.new({
        data: [],
      }),
    }),
  }),
})
p api_instance.create_scanning_group(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Create Scanning Group returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfiguration;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfigurationData;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfigurationType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerFilter;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupAttributes;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupCreate;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupCreateRequest;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupRelationships;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerMetaVersionOnly;
use datadog_api_client::datadogV2::model::SensitiveDataScannerProduct;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleData;

#[tokio::main]
async fn main() {
    // a valid "configuration" in the system
    let configuration_data_id = std::env::var("CONFIGURATION_DATA_ID").unwrap();
    let body =
        SensitiveDataScannerGroupCreateRequest::new()
            .data(
                SensitiveDataScannerGroupCreate::new(
                    SensitiveDataScannerGroupAttributes::new()
                        .filter(SensitiveDataScannerFilter::new().query("*".to_string()))
                        .is_enabled(false)
                        .name("Example-Sensitive-Data-Scanner".to_string())
                        .product_list(vec![SensitiveDataScannerProduct::LOGS]),
                    SensitiveDataScannerGroupType::SENSITIVE_DATA_SCANNER_GROUP,
                ).relationships(
                    SensitiveDataScannerGroupRelationships::new()
                        .configuration(
                            SensitiveDataScannerConfigurationData
                            ::new().data(
                                SensitiveDataScannerConfiguration::new()
                                    .id(configuration_data_id.clone())
                                    .type_(
                                        SensitiveDataScannerConfigurationType::SENSITIVE_DATA_SCANNER_CONFIGURATIONS,
                                    ),
                            ),
                        )
                        .rules(SensitiveDataScannerRuleData::new().data(vec![])),
                ),
            )
            .meta(SensitiveDataScannerMetaVersionOnly::new());
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.create_scanning_group(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Create Scanning Group returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

// a valid "configuration" in the system
const CONFIGURATION_DATA_ID = process.env.CONFIGURATION_DATA_ID as string;

const params: v2.SensitiveDataScannerApiCreateScanningGroupRequest = {
  body: {
    meta: {},
    data: {
      type: "sensitive_data_scanner_group",
      attributes: {
        name: "Example-Sensitive-Data-Scanner",
        isEnabled: false,
        productList: ["logs"],
        filter: {
          query: "*",
        },
      },
      relationships: {
        configuration: {
          data: {
            type: "sensitive_data_scanner_configuration",
            id: CONFIGURATION_DATA_ID,
          },
        },
        rules: {
          data: [],
        },
      },
    },
  },
};

apiInstance
  .createScanningGroup(params)
  .then((data: v2.SensitiveDataScannerCreateGroupResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PATCH https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.datadoghq.eu/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.ddog-gov.com/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/{group_id}

Información general

Update a group, including the order of the rules. Rules within the group are reordered by including a rules relationship. If the rules relationship is present, its data section MUST contain linkages for all of the rules currently in the group, and MUST NOT contain any others. This endpoint requires the data_scanner_write permission.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

group_id [required]

string

The ID of a group of rules.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

data [required]

object

Data related to the update of a group.

attributes

object

Attributes of the Sensitive Data Scanner group.

description

string

Description of the group.

filter

object

Filter for the Scanning Group.

query

string

Query to filter the events.

is_enabled

boolean

Whether or not the group is enabled.

name

string

Name of the group.

product_list

[string]

List of products the scanning group applies.

id

string

ID of the group.

relationships

object

Relationships of the group.

configuration

object

A Sensitive Data Scanner configuration data.

data

object

A Sensitive Data Scanner configuration.

id

string

ID of the configuration.

type

enum

Sensitive Data Scanner configuration type. Allowed enum values: sensitive_data_scanner_configuration

default: sensitive_data_scanner_configuration

rules

object

Rules included in the group.

data

[object]

Rules included in the group. The order is important.

id

string

ID of the rule.

type

enum

Sensitive Data Scanner rule type. Allowed enum values: sensitive_data_scanner_rule

default: sensitive_data_scanner_rule

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

meta [required]

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {},
  "data": {
    "id": "string",
    "type": "sensitive_data_scanner_group",
    "attributes": {
      "name": "Example-Sensitive-Data-Scanner",
      "is_enabled": false,
      "product_list": [
        "logs"
      ],
      "filter": {
        "query": "*"
      }
    },
    "relationships": {
      "configuration": {
        "data": {
          "type": "sensitive_data_scanner_configuration",
          "id": "55482444-d71c-c45c-7d1f-31984f64e6d2"
        }
      },
      "rules": {
        "data": []
      }
    }
  }
}

Respuesta

OK

Update group response.

Expand All

Campo

Tipo

Descripción

meta

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {
    "version": 0
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export group_id="CHANGE_ME"
# Curl command
curl -X PATCH "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/${group_id}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "meta": {}, "data": { "id": "string", "type": "sensitive_data_scanner_group", "attributes": { "name": "Example-Sensitive-Data-Scanner", "is_enabled": false, "product_list": [ "logs" ], "filter": { "query": "*" } }, "relationships": { "configuration": { "data": { "type": "sensitive_data_scanner_configuration", "id": "55482444-d71c-c45c-7d1f-31984f64e6d2" } }, "rules": { "data": [] } } } } EOF
// Update Scanning Group returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "scanning_group" in the system
	GroupDataID := os.Getenv("GROUP_DATA_ID")

	// a valid "configuration" in the system
	ConfigurationDataID := os.Getenv("CONFIGURATION_DATA_ID")

	body := datadogV2.SensitiveDataScannerGroupUpdateRequest{
		Meta: datadogV2.SensitiveDataScannerMetaVersionOnly{},
		Data: datadogV2.SensitiveDataScannerGroupUpdate{
			Id:   datadog.PtrString(GroupDataID),
			Type: datadogV2.SENSITIVEDATASCANNERGROUPTYPE_SENSITIVE_DATA_SCANNER_GROUP.Ptr(),
			Attributes: &datadogV2.SensitiveDataScannerGroupAttributes{
				Name:      datadog.PtrString("Example-Sensitive-Data-Scanner"),
				IsEnabled: datadog.PtrBool(false),
				ProductList: []datadogV2.SensitiveDataScannerProduct{
					datadogV2.SENSITIVEDATASCANNERPRODUCT_LOGS,
				},
				Filter: &datadogV2.SensitiveDataScannerFilter{
					Query: datadog.PtrString("*"),
				},
			},
			Relationships: &datadogV2.SensitiveDataScannerGroupRelationships{
				Configuration: &datadogV2.SensitiveDataScannerConfigurationData{
					Data: &datadogV2.SensitiveDataScannerConfiguration{
						Type: datadogV2.SENSITIVEDATASCANNERCONFIGURATIONTYPE_SENSITIVE_DATA_SCANNER_CONFIGURATIONS.Ptr(),
						Id:   datadog.PtrString(ConfigurationDataID),
					},
				},
				Rules: &datadogV2.SensitiveDataScannerRuleData{
					Data: []datadogV2.SensitiveDataScannerRule{},
				},
			},
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.UpdateScanningGroup(ctx, GroupDataID, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.UpdateScanningGroup`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.UpdateScanningGroup`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Update Scanning Group returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfiguration;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfigurationData;
import com.datadog.api.client.v2.model.SensitiveDataScannerConfigurationType;
import com.datadog.api.client.v2.model.SensitiveDataScannerFilter;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupAttributes;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupRelationships;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupType;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupUpdate;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupUpdateRequest;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupUpdateResponse;
import com.datadog.api.client.v2.model.SensitiveDataScannerMetaVersionOnly;
import com.datadog.api.client.v2.model.SensitiveDataScannerProduct;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleData;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    // there is a valid "scanning_group" in the system
    String GROUP_DATA_ID = System.getenv("GROUP_DATA_ID");

    // a valid "configuration" in the system
    String CONFIGURATION_DATA_ID = System.getenv("CONFIGURATION_DATA_ID");

    SensitiveDataScannerGroupUpdateRequest body =
        new SensitiveDataScannerGroupUpdateRequest()
            .meta(new SensitiveDataScannerMetaVersionOnly())
            .data(
                new SensitiveDataScannerGroupUpdate()
                    .id(GROUP_DATA_ID)
                    .type(SensitiveDataScannerGroupType.SENSITIVE_DATA_SCANNER_GROUP)
                    .attributes(
                        new SensitiveDataScannerGroupAttributes()
                            .name("Example-Sensitive-Data-Scanner")
                            .isEnabled(false)
                            .productList(
                                Collections.singletonList(SensitiveDataScannerProduct.LOGS))
                            .filter(new SensitiveDataScannerFilter().query("*")))
                    .relationships(
                        new SensitiveDataScannerGroupRelationships()
                            .configuration(
                                new SensitiveDataScannerConfigurationData()
                                    .data(
                                        new SensitiveDataScannerConfiguration()
                                            .type(
                                                SensitiveDataScannerConfigurationType
                                                    .SENSITIVE_DATA_SCANNER_CONFIGURATIONS)
                                            .id(CONFIGURATION_DATA_ID)))
                            .rules(new SensitiveDataScannerRuleData())));

    try {
      SensitiveDataScannerGroupUpdateResponse result =
          apiInstance.updateScanningGroup(GROUP_DATA_ID, body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#updateScanningGroup");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Update Scanning Group returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi
from datadog_api_client.v2.model.sensitive_data_scanner_configuration import SensitiveDataScannerConfiguration
from datadog_api_client.v2.model.sensitive_data_scanner_configuration_data import SensitiveDataScannerConfigurationData
from datadog_api_client.v2.model.sensitive_data_scanner_configuration_type import SensitiveDataScannerConfigurationType
from datadog_api_client.v2.model.sensitive_data_scanner_filter import SensitiveDataScannerFilter
from datadog_api_client.v2.model.sensitive_data_scanner_group_attributes import SensitiveDataScannerGroupAttributes
from datadog_api_client.v2.model.sensitive_data_scanner_group_relationships import (
    SensitiveDataScannerGroupRelationships,
)
from datadog_api_client.v2.model.sensitive_data_scanner_group_type import SensitiveDataScannerGroupType
from datadog_api_client.v2.model.sensitive_data_scanner_group_update import SensitiveDataScannerGroupUpdate
from datadog_api_client.v2.model.sensitive_data_scanner_group_update_request import (
    SensitiveDataScannerGroupUpdateRequest,
)
from datadog_api_client.v2.model.sensitive_data_scanner_meta_version_only import SensitiveDataScannerMetaVersionOnly
from datadog_api_client.v2.model.sensitive_data_scanner_product import SensitiveDataScannerProduct
from datadog_api_client.v2.model.sensitive_data_scanner_rule_data import SensitiveDataScannerRuleData

# there is a valid "scanning_group" in the system
GROUP_DATA_ID = environ["GROUP_DATA_ID"]

# a valid "configuration" in the system
CONFIGURATION_DATA_ID = environ["CONFIGURATION_DATA_ID"]

body = SensitiveDataScannerGroupUpdateRequest(
    meta=SensitiveDataScannerMetaVersionOnly(),
    data=SensitiveDataScannerGroupUpdate(
        id=GROUP_DATA_ID,
        type=SensitiveDataScannerGroupType.SENSITIVE_DATA_SCANNER_GROUP,
        attributes=SensitiveDataScannerGroupAttributes(
            name="Example-Sensitive-Data-Scanner",
            is_enabled=False,
            product_list=[
                SensitiveDataScannerProduct.LOGS,
            ],
            filter=SensitiveDataScannerFilter(
                query="*",
            ),
        ),
        relationships=SensitiveDataScannerGroupRelationships(
            configuration=SensitiveDataScannerConfigurationData(
                data=SensitiveDataScannerConfiguration(
                    type=SensitiveDataScannerConfigurationType.SENSITIVE_DATA_SCANNER_CONFIGURATIONS,
                    id=CONFIGURATION_DATA_ID,
                ),
            ),
            rules=SensitiveDataScannerRuleData(
                data=[],
            ),
        ),
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.update_scanning_group(group_id=GROUP_DATA_ID, body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Update Scanning Group returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new

# there is a valid "scanning_group" in the system
GROUP_DATA_ID = ENV["GROUP_DATA_ID"]

# a valid "configuration" in the system
CONFIGURATION_DATA_ID = ENV["CONFIGURATION_DATA_ID"]

body = DatadogAPIClient::V2::SensitiveDataScannerGroupUpdateRequest.new({
  meta: DatadogAPIClient::V2::SensitiveDataScannerMetaVersionOnly.new({}),
  data: DatadogAPIClient::V2::SensitiveDataScannerGroupUpdate.new({
    id: GROUP_DATA_ID,
    type: DatadogAPIClient::V2::SensitiveDataScannerGroupType::SENSITIVE_DATA_SCANNER_GROUP,
    attributes: DatadogAPIClient::V2::SensitiveDataScannerGroupAttributes.new({
      name: "Example-Sensitive-Data-Scanner",
      is_enabled: false,
      product_list: [
        DatadogAPIClient::V2::SensitiveDataScannerProduct::LOGS,
      ],
      filter: DatadogAPIClient::V2::SensitiveDataScannerFilter.new({
        query: "*",
      }),
    }),
    relationships: DatadogAPIClient::V2::SensitiveDataScannerGroupRelationships.new({
      configuration: DatadogAPIClient::V2::SensitiveDataScannerConfigurationData.new({
        data: DatadogAPIClient::V2::SensitiveDataScannerConfiguration.new({
          type: DatadogAPIClient::V2::SensitiveDataScannerConfigurationType::SENSITIVE_DATA_SCANNER_CONFIGURATIONS,
          id: CONFIGURATION_DATA_ID,
        }),
      }),
      rules: DatadogAPIClient::V2::SensitiveDataScannerRuleData.new({
        data: [],
      }),
    }),
  }),
})
p api_instance.update_scanning_group(GROUP_DATA_ID, body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Update Scanning Group returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfiguration;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfigurationData;
use datadog_api_client::datadogV2::model::SensitiveDataScannerConfigurationType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerFilter;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupAttributes;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupRelationships;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupUpdate;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupUpdateRequest;
use datadog_api_client::datadogV2::model::SensitiveDataScannerMetaVersionOnly;
use datadog_api_client::datadogV2::model::SensitiveDataScannerProduct;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleData;

#[tokio::main]
async fn main() {
    // there is a valid "scanning_group" in the system
    let group_data_id = std::env::var("GROUP_DATA_ID").unwrap();

    // a valid "configuration" in the system
    let configuration_data_id = std::env::var("CONFIGURATION_DATA_ID").unwrap();
    let body =
        SensitiveDataScannerGroupUpdateRequest::new(
            SensitiveDataScannerGroupUpdate::new()
                .attributes(
                    SensitiveDataScannerGroupAttributes::new()
                        .filter(SensitiveDataScannerFilter::new().query("*".to_string()))
                        .is_enabled(false)
                        .name("Example-Sensitive-Data-Scanner".to_string())
                        .product_list(vec![SensitiveDataScannerProduct::LOGS]),
                )
                .id(group_data_id.clone())
                .relationships(
                    SensitiveDataScannerGroupRelationships::new()
                        .configuration(
                            SensitiveDataScannerConfigurationData
                            ::new().data(
                                SensitiveDataScannerConfiguration::new()
                                    .id(configuration_data_id.clone())
                                    .type_(
                                        SensitiveDataScannerConfigurationType::SENSITIVE_DATA_SCANNER_CONFIGURATIONS,
                                    ),
                            ),
                        )
                        .rules(SensitiveDataScannerRuleData::new().data(vec![])),
                )
                .type_(SensitiveDataScannerGroupType::SENSITIVE_DATA_SCANNER_GROUP),
            SensitiveDataScannerMetaVersionOnly::new(),
        );
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.update_scanning_group(group_data_id.clone(), body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Update Scanning Group returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

// there is a valid "scanning_group" in the system
const GROUP_DATA_ID = process.env.GROUP_DATA_ID as string;

// a valid "configuration" in the system
const CONFIGURATION_DATA_ID = process.env.CONFIGURATION_DATA_ID as string;

const params: v2.SensitiveDataScannerApiUpdateScanningGroupRequest = {
  body: {
    meta: {},
    data: {
      id: GROUP_DATA_ID,
      type: "sensitive_data_scanner_group",
      attributes: {
        name: "Example-Sensitive-Data-Scanner",
        isEnabled: false,
        productList: ["logs"],
        filter: {
          query: "*",
        },
      },
      relationships: {
        configuration: {
          data: {
            type: "sensitive_data_scanner_configuration",
            id: CONFIGURATION_DATA_ID,
          },
        },
        rules: {
          data: [],
        },
      },
    },
  },
  groupId: GROUP_DATA_ID,
};

apiInstance
  .updateScanningGroup(params)
  .then((data: v2.SensitiveDataScannerGroupUpdateResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

DELETE https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.datadoghq.eu/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.ddog-gov.com/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/{group_id}https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/{group_id}

Información general

Delete a given group. This endpoint requires the data_scanner_write permission.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

group_id [required]

string

The ID of a group of rules.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

meta [required]

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {}
}

Respuesta

OK

Delete group response.

Expand All

Campo

Tipo

Descripción

meta

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {
    "version": 0
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export group_id="CHANGE_ME"
# Curl command
curl -X DELETE "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/groups/${group_id}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "meta": {} } EOF
// Delete Scanning Group returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "scanning_group" in the system
	GroupDataID := os.Getenv("GROUP_DATA_ID")

	body := datadogV2.SensitiveDataScannerGroupDeleteRequest{
		Meta: datadogV2.SensitiveDataScannerMetaVersionOnly{},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.DeleteScanningGroup(ctx, GroupDataID, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.DeleteScanningGroup`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.DeleteScanningGroup`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Delete Scanning Group returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupDeleteRequest;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupDeleteResponse;
import com.datadog.api.client.v2.model.SensitiveDataScannerMetaVersionOnly;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    // there is a valid "scanning_group" in the system
    String GROUP_DATA_ID = System.getenv("GROUP_DATA_ID");

    SensitiveDataScannerGroupDeleteRequest body =
        new SensitiveDataScannerGroupDeleteRequest()
            .meta(new SensitiveDataScannerMetaVersionOnly());

    try {
      SensitiveDataScannerGroupDeleteResponse result =
          apiInstance.deleteScanningGroup(GROUP_DATA_ID, body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#deleteScanningGroup");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Delete Scanning Group returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi
from datadog_api_client.v2.model.sensitive_data_scanner_group_delete_request import (
    SensitiveDataScannerGroupDeleteRequest,
)
from datadog_api_client.v2.model.sensitive_data_scanner_meta_version_only import SensitiveDataScannerMetaVersionOnly

# there is a valid "scanning_group" in the system
GROUP_DATA_ID = environ["GROUP_DATA_ID"]

body = SensitiveDataScannerGroupDeleteRequest(
    meta=SensitiveDataScannerMetaVersionOnly(),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.delete_scanning_group(group_id=GROUP_DATA_ID, body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Delete Scanning Group returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new

# there is a valid "scanning_group" in the system
GROUP_DATA_ID = ENV["GROUP_DATA_ID"]

body = DatadogAPIClient::V2::SensitiveDataScannerGroupDeleteRequest.new({
  meta: DatadogAPIClient::V2::SensitiveDataScannerMetaVersionOnly.new({}),
})
p api_instance.delete_scanning_group(GROUP_DATA_ID, body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Delete Scanning Group returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupDeleteRequest;
use datadog_api_client::datadogV2::model::SensitiveDataScannerMetaVersionOnly;

#[tokio::main]
async fn main() {
    // there is a valid "scanning_group" in the system
    let group_data_id = std::env::var("GROUP_DATA_ID").unwrap();
    let body =
        SensitiveDataScannerGroupDeleteRequest::new(SensitiveDataScannerMetaVersionOnly::new());
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.delete_scanning_group(group_data_id.clone(), body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Delete Scanning Group returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

// there is a valid "scanning_group" in the system
const GROUP_DATA_ID = process.env.GROUP_DATA_ID as string;

const params: v2.SensitiveDataScannerApiDeleteScanningGroupRequest = {
  body: {
    meta: {},
  },
  groupId: GROUP_DATA_ID,
};

apiInstance
  .deleteScanningGroup(params)
  .then((data: v2.SensitiveDataScannerGroupDeleteResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

POST https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/config/ruleshttps://api.datadoghq.eu/api/v2/sensitive-data-scanner/config/ruleshttps://api.ddog-gov.com/api/v2/sensitive-data-scanner/config/ruleshttps://api.datadoghq.com/api/v2/sensitive-data-scanner/config/ruleshttps://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/config/ruleshttps://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/rules

Información general

Create a scanning rule in a sensitive data scanner group, ordered last. The posted rule MUST include a group relationship. It MUST include either a standard_pattern relationship or a regex attribute, but not both. If included_attributes is empty or missing, we will scan all attributes except excluded_attributes. If both are missing, we will scan the whole event. This endpoint requires the data_scanner_write permission.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

data [required]

object

Data related to the creation of a rule.

attributes [required]

object

Attributes of the Sensitive Data Scanner rule.

description

string

Description of the rule.

excluded_namespaces

[string]

Attributes excluded from the scan. If namespaces is provided, it has to be a sub-path of the namespaces array.

included_keyword_configuration

object

Object defining a set of keywords and a number of characters that help reduce noise. You can provide a list of keywords you would like to check within a defined proximity of the matching pattern. If any of the keywords are found within the proximity check, the match is kept. If none are found, the match is discarded.

character_count [required]

int64

The number of characters behind a match detected by Sensitive Data Scanner to look for the keywords defined. character_count should be greater than the maximum length of a keyword defined for a rule.

keywords [required]

[string]

Keyword list that will be checked during scanning in order to validate a match. The number of keywords in the list must be less than or equal to 30.

use_recommended_keywords

boolean

Should the rule use the underlying standard pattern keyword configuration. If set to true, the rule must be tied to a standard pattern. If set to false, the specified keywords and character_count are applied.

is_enabled

boolean

Whether or not the rule is enabled.

name

string

Name of the rule.

namespaces

[string]

Attributes included in the scan. If namespaces is empty or missing, all attributes except excluded_namespaces are scanned. If both are missing the whole event is scanned.

pattern

string

Not included if there is a relationship to a standard pattern.

priority

int64

Integer from 1 (high) to 5 (low) indicating rule issue severity.

tags

[string]

List of tags.

text_replacement

object

Object describing how the scanned event will be replaced.

number_of_chars

int64

Required if type == 'partial_replacement_from_beginning' or 'partial_replacement_from_end'. It must be > 0.

replacement_string

string

Required if type == 'replacement_string'.

type

enum

Type of the replacement text. None means no replacement. hash means the data will be stubbed. replacement_string means that one can chose a text to replace the data. partial_replacement_from_beginning allows a user to partially replace the data from the beginning, and partial_replacement_from_end on the other hand, allows to replace data from the end. Allowed enum values: none,hash,replacement_string,partial_replacement_from_beginning,partial_replacement_from_end

default: none

relationships [required]

object

Relationships of a scanning rule.

group

object

A scanning group data.

data

object

A scanning group.

id

string

ID of the group.

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

standard_pattern

object

A standard pattern.

data

object

Data containing the standard pattern id.

id

string

ID of the standard pattern.

type

enum

Sensitive Data Scanner standard pattern type. Allowed enum values: sensitive_data_scanner_standard_pattern

default: sensitive_data_scanner_standard_pattern

type [required]

enum

Sensitive Data Scanner rule type. Allowed enum values: sensitive_data_scanner_rule

default: sensitive_data_scanner_rule

meta [required]

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {},
  "data": {
    "type": "sensitive_data_scanner_rule",
    "attributes": {
      "name": "Example-Sensitive-Data-Scanner",
      "pattern": "pattern",
      "namespaces": [
        "admin"
      ],
      "excluded_namespaces": [
        "admin.name"
      ],
      "text_replacement": {
        "type": "none"
      },
      "tags": [
        "sensitive_data:true"
      ],
      "is_enabled": true,
      "priority": 1,
      "included_keyword_configuration": {
        "keywords": [
          "credit card"
        ],
        "character_count": 35
      }
    },
    "relationships": {
      "group": {
        "data": {
          "type": "sensitive_data_scanner_group",
          "id": "string"
        }
      }
    }
  }
}

Respuesta

OK

Create rule response.

Expand All

Campo

Tipo

Descripción

data

object

Response data related to the creation of a rule.

attributes

object

Attributes of the Sensitive Data Scanner rule.

description

string

Description of the rule.

excluded_namespaces

[string]

Attributes excluded from the scan. If namespaces is provided, it has to be a sub-path of the namespaces array.

included_keyword_configuration

object

Object defining a set of keywords and a number of characters that help reduce noise. You can provide a list of keywords you would like to check within a defined proximity of the matching pattern. If any of the keywords are found within the proximity check, the match is kept. If none are found, the match is discarded.

character_count [required]

int64

The number of characters behind a match detected by Sensitive Data Scanner to look for the keywords defined. character_count should be greater than the maximum length of a keyword defined for a rule.

keywords [required]

[string]

Keyword list that will be checked during scanning in order to validate a match. The number of keywords in the list must be less than or equal to 30.

use_recommended_keywords

boolean

Should the rule use the underlying standard pattern keyword configuration. If set to true, the rule must be tied to a standard pattern. If set to false, the specified keywords and character_count are applied.

is_enabled

boolean

Whether or not the rule is enabled.

name

string

Name of the rule.

namespaces

[string]

Attributes included in the scan. If namespaces is empty or missing, all attributes except excluded_namespaces are scanned. If both are missing the whole event is scanned.

pattern

string

Not included if there is a relationship to a standard pattern.

priority

int64

Integer from 1 (high) to 5 (low) indicating rule issue severity.

tags

[string]

List of tags.

text_replacement

object

Object describing how the scanned event will be replaced.

number_of_chars

int64

Required if type == 'partial_replacement_from_beginning' or 'partial_replacement_from_end'. It must be > 0.

replacement_string

string

Required if type == 'replacement_string'.

type

enum

Type of the replacement text. None means no replacement. hash means the data will be stubbed. replacement_string means that one can chose a text to replace the data. partial_replacement_from_beginning allows a user to partially replace the data from the beginning, and partial_replacement_from_end on the other hand, allows to replace data from the end. Allowed enum values: none,hash,replacement_string,partial_replacement_from_beginning,partial_replacement_from_end

default: none

id

string

ID of the rule.

relationships

object

Relationships of a scanning rule.

group

object

A scanning group data.

data

object

A scanning group.

id

string

ID of the group.

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

standard_pattern

object

A standard pattern.

data

object

Data containing the standard pattern id.

id

string

ID of the standard pattern.

type

enum

Sensitive Data Scanner standard pattern type. Allowed enum values: sensitive_data_scanner_standard_pattern

default: sensitive_data_scanner_standard_pattern

type

enum

Sensitive Data Scanner rule type. Allowed enum values: sensitive_data_scanner_rule

default: sensitive_data_scanner_rule

meta

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "data": {
    "attributes": {
      "description": "string",
      "excluded_namespaces": [
        "admin.name"
      ],
      "included_keyword_configuration": {
        "character_count": 30,
        "keywords": [
          "credit card",
          "cc"
        ],
        "use_recommended_keywords": false
      },
      "is_enabled": false,
      "name": "string",
      "namespaces": [
        "admin"
      ],
      "pattern": "string",
      "priority": "integer",
      "tags": [],
      "text_replacement": {
        "number_of_chars": "integer",
        "replacement_string": "string",
        "type": "string"
      }
    },
    "id": "string",
    "relationships": {
      "group": {
        "data": {
          "id": "string",
          "type": "sensitive_data_scanner_group"
        }
      },
      "standard_pattern": {
        "data": {
          "id": "string",
          "type": "sensitive_data_scanner_standard_pattern"
        }
      }
    },
    "type": "sensitive_data_scanner_rule"
  },
  "meta": {
    "version": 0
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/rules" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "meta": {}, "data": { "type": "sensitive_data_scanner_rule", "attributes": { "name": "Example-Sensitive-Data-Scanner", "pattern": "pattern", "namespaces": [ "admin" ], "excluded_namespaces": [ "admin.name" ], "text_replacement": { "type": "none" }, "tags": [ "sensitive_data:true" ], "is_enabled": true, "priority": 1, "included_keyword_configuration": { "keywords": [ "credit card" ], "character_count": 35 } }, "relationships": { "group": { "data": { "type": "sensitive_data_scanner_group", "id": "string" } } } } } EOF
// Create Scanning Rule returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "scanning_group" in the system
	GroupDataID := os.Getenv("GROUP_DATA_ID")

	body := datadogV2.SensitiveDataScannerRuleCreateRequest{
		Meta: datadogV2.SensitiveDataScannerMetaVersionOnly{},
		Data: datadogV2.SensitiveDataScannerRuleCreate{
			Type: datadogV2.SENSITIVEDATASCANNERRULETYPE_SENSITIVE_DATA_SCANNER_RULE,
			Attributes: datadogV2.SensitiveDataScannerRuleAttributes{
				Name:    datadog.PtrString("Example-Sensitive-Data-Scanner"),
				Pattern: datadog.PtrString("pattern"),
				Namespaces: []string{
					"admin",
				},
				ExcludedNamespaces: []string{
					"admin.name",
				},
				TextReplacement: &datadogV2.SensitiveDataScannerTextReplacement{
					Type: datadogV2.SENSITIVEDATASCANNERTEXTREPLACEMENTTYPE_NONE.Ptr(),
				},
				Tags: []string{
					"sensitive_data:true",
				},
				IsEnabled: datadog.PtrBool(true),
				Priority:  datadog.PtrInt64(1),
				IncludedKeywordConfiguration: &datadogV2.SensitiveDataScannerIncludedKeywordConfiguration{
					Keywords: []string{
						"credit card",
					},
					CharacterCount: 35,
				},
			},
			Relationships: datadogV2.SensitiveDataScannerRuleRelationships{
				Group: &datadogV2.SensitiveDataScannerGroupData{
					Data: &datadogV2.SensitiveDataScannerGroup{
						Type: datadogV2.SENSITIVEDATASCANNERGROUPTYPE_SENSITIVE_DATA_SCANNER_GROUP.Ptr(),
						Id:   datadog.PtrString(GroupDataID),
					},
				},
			},
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.CreateScanningRule(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.CreateScanningRule`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.CreateScanningRule`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Create Scanning Rule returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerCreateRuleResponse;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroup;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupData;
import com.datadog.api.client.v2.model.SensitiveDataScannerGroupType;
import com.datadog.api.client.v2.model.SensitiveDataScannerIncludedKeywordConfiguration;
import com.datadog.api.client.v2.model.SensitiveDataScannerMetaVersionOnly;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleAttributes;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleCreate;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleCreateRequest;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleRelationships;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleType;
import com.datadog.api.client.v2.model.SensitiveDataScannerTextReplacement;
import com.datadog.api.client.v2.model.SensitiveDataScannerTextReplacementType;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    // there is a valid "scanning_group" in the system
    String GROUP_DATA_ID = System.getenv("GROUP_DATA_ID");

    SensitiveDataScannerRuleCreateRequest body =
        new SensitiveDataScannerRuleCreateRequest()
            .meta(new SensitiveDataScannerMetaVersionOnly())
            .data(
                new SensitiveDataScannerRuleCreate()
                    .type(SensitiveDataScannerRuleType.SENSITIVE_DATA_SCANNER_RULE)
                    .attributes(
                        new SensitiveDataScannerRuleAttributes()
                            .name("Example-Sensitive-Data-Scanner")
                            .pattern("pattern")
                            .namespaces(Collections.singletonList("admin"))
                            .excludedNamespaces(Collections.singletonList("admin.name"))
                            .textReplacement(
                                new SensitiveDataScannerTextReplacement()
                                    .type(SensitiveDataScannerTextReplacementType.NONE))
                            .tags(Collections.singletonList("sensitive_data:true"))
                            .isEnabled(true)
                            .priority(1L)
                            .includedKeywordConfiguration(
                                new SensitiveDataScannerIncludedKeywordConfiguration()
                                    .keywords(Collections.singletonList("credit card"))
                                    .characterCount(35L)))
                    .relationships(
                        new SensitiveDataScannerRuleRelationships()
                            .group(
                                new SensitiveDataScannerGroupData()
                                    .data(
                                        new SensitiveDataScannerGroup()
                                            .type(
                                                SensitiveDataScannerGroupType
                                                    .SENSITIVE_DATA_SCANNER_GROUP)
                                            .id(GROUP_DATA_ID)))));

    try {
      SensitiveDataScannerCreateRuleResponse result = apiInstance.createScanningRule(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#createScanningRule");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Create Scanning Rule returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi
from datadog_api_client.v2.model.sensitive_data_scanner_group import SensitiveDataScannerGroup
from datadog_api_client.v2.model.sensitive_data_scanner_group_data import SensitiveDataScannerGroupData
from datadog_api_client.v2.model.sensitive_data_scanner_group_type import SensitiveDataScannerGroupType
from datadog_api_client.v2.model.sensitive_data_scanner_included_keyword_configuration import (
    SensitiveDataScannerIncludedKeywordConfiguration,
)
from datadog_api_client.v2.model.sensitive_data_scanner_meta_version_only import SensitiveDataScannerMetaVersionOnly
from datadog_api_client.v2.model.sensitive_data_scanner_rule_attributes import SensitiveDataScannerRuleAttributes
from datadog_api_client.v2.model.sensitive_data_scanner_rule_create import SensitiveDataScannerRuleCreate
from datadog_api_client.v2.model.sensitive_data_scanner_rule_create_request import SensitiveDataScannerRuleCreateRequest
from datadog_api_client.v2.model.sensitive_data_scanner_rule_relationships import SensitiveDataScannerRuleRelationships
from datadog_api_client.v2.model.sensitive_data_scanner_rule_type import SensitiveDataScannerRuleType
from datadog_api_client.v2.model.sensitive_data_scanner_text_replacement import SensitiveDataScannerTextReplacement
from datadog_api_client.v2.model.sensitive_data_scanner_text_replacement_type import (
    SensitiveDataScannerTextReplacementType,
)

# there is a valid "scanning_group" in the system
GROUP_DATA_ID = environ["GROUP_DATA_ID"]

body = SensitiveDataScannerRuleCreateRequest(
    meta=SensitiveDataScannerMetaVersionOnly(),
    data=SensitiveDataScannerRuleCreate(
        type=SensitiveDataScannerRuleType.SENSITIVE_DATA_SCANNER_RULE,
        attributes=SensitiveDataScannerRuleAttributes(
            name="Example-Sensitive-Data-Scanner",
            pattern="pattern",
            namespaces=[
                "admin",
            ],
            excluded_namespaces=[
                "admin.name",
            ],
            text_replacement=SensitiveDataScannerTextReplacement(
                type=SensitiveDataScannerTextReplacementType.NONE,
            ),
            tags=[
                "sensitive_data:true",
            ],
            is_enabled=True,
            priority=1,
            included_keyword_configuration=SensitiveDataScannerIncludedKeywordConfiguration(
                keywords=[
                    "credit card",
                ],
                character_count=35,
            ),
        ),
        relationships=SensitiveDataScannerRuleRelationships(
            group=SensitiveDataScannerGroupData(
                data=SensitiveDataScannerGroup(
                    type=SensitiveDataScannerGroupType.SENSITIVE_DATA_SCANNER_GROUP,
                    id=GROUP_DATA_ID,
                ),
            ),
        ),
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.create_scanning_rule(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Create Scanning Rule returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new

# there is a valid "scanning_group" in the system
GROUP_DATA_ID = ENV["GROUP_DATA_ID"]

body = DatadogAPIClient::V2::SensitiveDataScannerRuleCreateRequest.new({
  meta: DatadogAPIClient::V2::SensitiveDataScannerMetaVersionOnly.new({}),
  data: DatadogAPIClient::V2::SensitiveDataScannerRuleCreate.new({
    type: DatadogAPIClient::V2::SensitiveDataScannerRuleType::SENSITIVE_DATA_SCANNER_RULE,
    attributes: DatadogAPIClient::V2::SensitiveDataScannerRuleAttributes.new({
      name: "Example-Sensitive-Data-Scanner",
      pattern: "pattern",
      namespaces: [
        "admin",
      ],
      excluded_namespaces: [
        "admin.name",
      ],
      text_replacement: DatadogAPIClient::V2::SensitiveDataScannerTextReplacement.new({
        type: DatadogAPIClient::V2::SensitiveDataScannerTextReplacementType::NONE,
      }),
      tags: [
        "sensitive_data:true",
      ],
      is_enabled: true,
      priority: 1,
      included_keyword_configuration: DatadogAPIClient::V2::SensitiveDataScannerIncludedKeywordConfiguration.new({
        keywords: [
          "credit card",
        ],
        character_count: 35,
      }),
    }),
    relationships: DatadogAPIClient::V2::SensitiveDataScannerRuleRelationships.new({
      group: DatadogAPIClient::V2::SensitiveDataScannerGroupData.new({
        data: DatadogAPIClient::V2::SensitiveDataScannerGroup.new({
          type: DatadogAPIClient::V2::SensitiveDataScannerGroupType::SENSITIVE_DATA_SCANNER_GROUP,
          id: GROUP_DATA_ID,
        }),
      }),
    }),
  }),
})
p api_instance.create_scanning_rule(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Create Scanning Rule returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroup;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupData;
use datadog_api_client::datadogV2::model::SensitiveDataScannerGroupType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerIncludedKeywordConfiguration;
use datadog_api_client::datadogV2::model::SensitiveDataScannerMetaVersionOnly;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleAttributes;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleCreate;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleCreateRequest;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleRelationships;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerTextReplacement;
use datadog_api_client::datadogV2::model::SensitiveDataScannerTextReplacementType;

#[tokio::main]
async fn main() {
    // there is a valid "scanning_group" in the system
    let group_data_id = std::env::var("GROUP_DATA_ID").unwrap();
    let body = SensitiveDataScannerRuleCreateRequest::new(
        SensitiveDataScannerRuleCreate::new(
            SensitiveDataScannerRuleAttributes::new()
                .excluded_namespaces(vec!["admin.name".to_string()])
                .included_keyword_configuration(
                    SensitiveDataScannerIncludedKeywordConfiguration::new(
                        35,
                        vec!["credit card".to_string()],
                    ),
                )
                .is_enabled(true)
                .name("Example-Sensitive-Data-Scanner".to_string())
                .namespaces(vec!["admin".to_string()])
                .pattern("pattern".to_string())
                .priority(1)
                .tags(vec!["sensitive_data:true".to_string()])
                .text_replacement(
                    SensitiveDataScannerTextReplacement::new()
                        .type_(SensitiveDataScannerTextReplacementType::NONE),
                ),
            SensitiveDataScannerRuleRelationships::new().group(
                SensitiveDataScannerGroupData::new().data(
                    SensitiveDataScannerGroup::new()
                        .id(group_data_id.clone())
                        .type_(SensitiveDataScannerGroupType::SENSITIVE_DATA_SCANNER_GROUP),
                ),
            ),
            SensitiveDataScannerRuleType::SENSITIVE_DATA_SCANNER_RULE,
        ),
        SensitiveDataScannerMetaVersionOnly::new(),
    );
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.create_scanning_rule(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Create Scanning Rule returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

// there is a valid "scanning_group" in the system
const GROUP_DATA_ID = process.env.GROUP_DATA_ID as string;

const params: v2.SensitiveDataScannerApiCreateScanningRuleRequest = {
  body: {
    meta: {},
    data: {
      type: "sensitive_data_scanner_rule",
      attributes: {
        name: "Example-Sensitive-Data-Scanner",
        pattern: "pattern",
        namespaces: ["admin"],
        excludedNamespaces: ["admin.name"],
        textReplacement: {
          type: "none",
        },
        tags: ["sensitive_data:true"],
        isEnabled: true,
        priority: 1,
        includedKeywordConfiguration: {
          keywords: ["credit card"],
          characterCount: 35,
        },
      },
      relationships: {
        group: {
          data: {
            type: "sensitive_data_scanner_group",
            id: GROUP_DATA_ID,
          },
        },
      },
    },
  },
};

apiInstance
  .createScanningRule(params)
  .then((data: v2.SensitiveDataScannerCreateRuleResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PATCH https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.datadoghq.eu/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.ddog-gov.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}

Información general

Update a scanning rule. The request body MUST NOT include a standard_pattern relationship, as that relationship is non-editable. Trying to edit the regex attribute of a rule with a standard_pattern relationship will also result in an error. This endpoint requires the data_scanner_write permission.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

rule_id [required]

string

The ID of the rule.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

data [required]

object

Data related to the update of a rule.

attributes

object

Attributes of the Sensitive Data Scanner rule.

description

string

Description of the rule.

excluded_namespaces

[string]

Attributes excluded from the scan. If namespaces is provided, it has to be a sub-path of the namespaces array.

included_keyword_configuration

object

Object defining a set of keywords and a number of characters that help reduce noise. You can provide a list of keywords you would like to check within a defined proximity of the matching pattern. If any of the keywords are found within the proximity check, the match is kept. If none are found, the match is discarded.

character_count [required]

int64

The number of characters behind a match detected by Sensitive Data Scanner to look for the keywords defined. character_count should be greater than the maximum length of a keyword defined for a rule.

keywords [required]

[string]

Keyword list that will be checked during scanning in order to validate a match. The number of keywords in the list must be less than or equal to 30.

use_recommended_keywords

boolean

Should the rule use the underlying standard pattern keyword configuration. If set to true, the rule must be tied to a standard pattern. If set to false, the specified keywords and character_count are applied.

is_enabled

boolean

Whether or not the rule is enabled.

name

string

Name of the rule.

namespaces

[string]

Attributes included in the scan. If namespaces is empty or missing, all attributes except excluded_namespaces are scanned. If both are missing the whole event is scanned.

pattern

string

Not included if there is a relationship to a standard pattern.

priority

int64

Integer from 1 (high) to 5 (low) indicating rule issue severity.

tags

[string]

List of tags.

text_replacement

object

Object describing how the scanned event will be replaced.

number_of_chars

int64

Required if type == 'partial_replacement_from_beginning' or 'partial_replacement_from_end'. It must be > 0.

replacement_string

string

Required if type == 'replacement_string'.

type

enum

Type of the replacement text. None means no replacement. hash means the data will be stubbed. replacement_string means that one can chose a text to replace the data. partial_replacement_from_beginning allows a user to partially replace the data from the beginning, and partial_replacement_from_end on the other hand, allows to replace data from the end. Allowed enum values: none,hash,replacement_string,partial_replacement_from_beginning,partial_replacement_from_end

default: none

id

string

ID of the rule.

relationships

object

Relationships of a scanning rule.

group

object

A scanning group data.

data

object

A scanning group.

id

string

ID of the group.

type

enum

Sensitive Data Scanner group type. Allowed enum values: sensitive_data_scanner_group

default: sensitive_data_scanner_group

standard_pattern

object

A standard pattern.

data

object

Data containing the standard pattern id.

id

string

ID of the standard pattern.

type

enum

Sensitive Data Scanner standard pattern type. Allowed enum values: sensitive_data_scanner_standard_pattern

default: sensitive_data_scanner_standard_pattern

type

enum

Sensitive Data Scanner rule type. Allowed enum values: sensitive_data_scanner_rule

default: sensitive_data_scanner_rule

meta [required]

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {},
  "data": {
    "id": "string",
    "type": "sensitive_data_scanner_rule",
    "attributes": {
      "name": "Example-Sensitive-Data-Scanner",
      "pattern": "pattern",
      "text_replacement": {
        "type": "none"
      },
      "tags": [
        "sensitive_data:true"
      ],
      "is_enabled": true,
      "priority": 5,
      "included_keyword_configuration": {
        "keywords": [
          "credit card",
          "cc"
        ],
        "character_count": 35
      }
    }
  }
}

Respuesta

OK

Update rule response.

Expand All

Campo

Tipo

Descripción

meta

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {
    "version": 0
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export rule_id="CHANGE_ME"
# Curl command
curl -X PATCH "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/${rule_id}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "meta": {}, "data": { "id": "string", "type": "sensitive_data_scanner_rule", "attributes": { "name": "Example-Sensitive-Data-Scanner", "pattern": "pattern", "text_replacement": { "type": "none" }, "tags": [ "sensitive_data:true" ], "is_enabled": true, "priority": 5, "included_keyword_configuration": { "keywords": [ "credit card", "cc" ], "character_count": 35 } } } } EOF
// Update Scanning Rule returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// the "scanning_group" has a "scanning_rule"
	RuleDataID := os.Getenv("RULE_DATA_ID")

	body := datadogV2.SensitiveDataScannerRuleUpdateRequest{
		Meta: datadogV2.SensitiveDataScannerMetaVersionOnly{},
		Data: datadogV2.SensitiveDataScannerRuleUpdate{
			Id:   datadog.PtrString(RuleDataID),
			Type: datadogV2.SENSITIVEDATASCANNERRULETYPE_SENSITIVE_DATA_SCANNER_RULE.Ptr(),
			Attributes: &datadogV2.SensitiveDataScannerRuleAttributes{
				Name:    datadog.PtrString("Example-Sensitive-Data-Scanner"),
				Pattern: datadog.PtrString("pattern"),
				TextReplacement: &datadogV2.SensitiveDataScannerTextReplacement{
					Type: datadogV2.SENSITIVEDATASCANNERTEXTREPLACEMENTTYPE_NONE.Ptr(),
				},
				Tags: []string{
					"sensitive_data:true",
				},
				IsEnabled: datadog.PtrBool(true),
				Priority:  datadog.PtrInt64(5),
				IncludedKeywordConfiguration: &datadogV2.SensitiveDataScannerIncludedKeywordConfiguration{
					Keywords: []string{
						"credit card",
						"cc",
					},
					CharacterCount: 35,
				},
			},
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.UpdateScanningRule(ctx, RuleDataID, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.UpdateScanningRule`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.UpdateScanningRule`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Update Scanning Rule returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerIncludedKeywordConfiguration;
import com.datadog.api.client.v2.model.SensitiveDataScannerMetaVersionOnly;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleAttributes;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleType;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleUpdate;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleUpdateRequest;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleUpdateResponse;
import com.datadog.api.client.v2.model.SensitiveDataScannerTextReplacement;
import com.datadog.api.client.v2.model.SensitiveDataScannerTextReplacementType;
import java.util.Arrays;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    // the "scanning_group" has a "scanning_rule"
    String RULE_DATA_ID = System.getenv("RULE_DATA_ID");

    SensitiveDataScannerRuleUpdateRequest body =
        new SensitiveDataScannerRuleUpdateRequest()
            .meta(new SensitiveDataScannerMetaVersionOnly())
            .data(
                new SensitiveDataScannerRuleUpdate()
                    .id(RULE_DATA_ID)
                    .type(SensitiveDataScannerRuleType.SENSITIVE_DATA_SCANNER_RULE)
                    .attributes(
                        new SensitiveDataScannerRuleAttributes()
                            .name("Example-Sensitive-Data-Scanner")
                            .pattern("pattern")
                            .textReplacement(
                                new SensitiveDataScannerTextReplacement()
                                    .type(SensitiveDataScannerTextReplacementType.NONE))
                            .tags(Collections.singletonList("sensitive_data:true"))
                            .isEnabled(true)
                            .priority(5L)
                            .includedKeywordConfiguration(
                                new SensitiveDataScannerIncludedKeywordConfiguration()
                                    .keywords(Arrays.asList("credit card", "cc"))
                                    .characterCount(35L))));

    try {
      SensitiveDataScannerRuleUpdateResponse result =
          apiInstance.updateScanningRule(RULE_DATA_ID, body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#updateScanningRule");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Update Scanning Rule returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi
from datadog_api_client.v2.model.sensitive_data_scanner_included_keyword_configuration import (
    SensitiveDataScannerIncludedKeywordConfiguration,
)
from datadog_api_client.v2.model.sensitive_data_scanner_meta_version_only import SensitiveDataScannerMetaVersionOnly
from datadog_api_client.v2.model.sensitive_data_scanner_rule_attributes import SensitiveDataScannerRuleAttributes
from datadog_api_client.v2.model.sensitive_data_scanner_rule_type import SensitiveDataScannerRuleType
from datadog_api_client.v2.model.sensitive_data_scanner_rule_update import SensitiveDataScannerRuleUpdate
from datadog_api_client.v2.model.sensitive_data_scanner_rule_update_request import SensitiveDataScannerRuleUpdateRequest
from datadog_api_client.v2.model.sensitive_data_scanner_text_replacement import SensitiveDataScannerTextReplacement
from datadog_api_client.v2.model.sensitive_data_scanner_text_replacement_type import (
    SensitiveDataScannerTextReplacementType,
)

# the "scanning_group" has a "scanning_rule"
RULE_DATA_ID = environ["RULE_DATA_ID"]

body = SensitiveDataScannerRuleUpdateRequest(
    meta=SensitiveDataScannerMetaVersionOnly(),
    data=SensitiveDataScannerRuleUpdate(
        id=RULE_DATA_ID,
        type=SensitiveDataScannerRuleType.SENSITIVE_DATA_SCANNER_RULE,
        attributes=SensitiveDataScannerRuleAttributes(
            name="Example-Sensitive-Data-Scanner",
            pattern="pattern",
            text_replacement=SensitiveDataScannerTextReplacement(
                type=SensitiveDataScannerTextReplacementType.NONE,
            ),
            tags=[
                "sensitive_data:true",
            ],
            is_enabled=True,
            priority=5,
            included_keyword_configuration=SensitiveDataScannerIncludedKeywordConfiguration(
                keywords=[
                    "credit card",
                    "cc",
                ],
                character_count=35,
            ),
        ),
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.update_scanning_rule(rule_id=RULE_DATA_ID, body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Update Scanning Rule returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new

# the "scanning_group" has a "scanning_rule"
RULE_DATA_ID = ENV["RULE_DATA_ID"]

body = DatadogAPIClient::V2::SensitiveDataScannerRuleUpdateRequest.new({
  meta: DatadogAPIClient::V2::SensitiveDataScannerMetaVersionOnly.new({}),
  data: DatadogAPIClient::V2::SensitiveDataScannerRuleUpdate.new({
    id: RULE_DATA_ID,
    type: DatadogAPIClient::V2::SensitiveDataScannerRuleType::SENSITIVE_DATA_SCANNER_RULE,
    attributes: DatadogAPIClient::V2::SensitiveDataScannerRuleAttributes.new({
      name: "Example-Sensitive-Data-Scanner",
      pattern: "pattern",
      text_replacement: DatadogAPIClient::V2::SensitiveDataScannerTextReplacement.new({
        type: DatadogAPIClient::V2::SensitiveDataScannerTextReplacementType::NONE,
      }),
      tags: [
        "sensitive_data:true",
      ],
      is_enabled: true,
      priority: 5,
      included_keyword_configuration: DatadogAPIClient::V2::SensitiveDataScannerIncludedKeywordConfiguration.new({
        keywords: [
          "credit card",
          "cc",
        ],
        character_count: 35,
      }),
    }),
  }),
})
p api_instance.update_scanning_rule(RULE_DATA_ID, body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Update Scanning Rule returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;
use datadog_api_client::datadogV2::model::SensitiveDataScannerIncludedKeywordConfiguration;
use datadog_api_client::datadogV2::model::SensitiveDataScannerMetaVersionOnly;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleAttributes;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleType;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleUpdate;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleUpdateRequest;
use datadog_api_client::datadogV2::model::SensitiveDataScannerTextReplacement;
use datadog_api_client::datadogV2::model::SensitiveDataScannerTextReplacementType;

#[tokio::main]
async fn main() {
    // the "scanning_group" has a "scanning_rule"
    let rule_data_id = std::env::var("RULE_DATA_ID").unwrap();
    let body = SensitiveDataScannerRuleUpdateRequest::new(
        SensitiveDataScannerRuleUpdate::new()
            .attributes(
                SensitiveDataScannerRuleAttributes::new()
                    .included_keyword_configuration(
                        SensitiveDataScannerIncludedKeywordConfiguration::new(
                            35,
                            vec!["credit card".to_string(), "cc".to_string()],
                        ),
                    )
                    .is_enabled(true)
                    .name("Example-Sensitive-Data-Scanner".to_string())
                    .pattern("pattern".to_string())
                    .priority(5)
                    .tags(vec!["sensitive_data:true".to_string()])
                    .text_replacement(
                        SensitiveDataScannerTextReplacement::new()
                            .type_(SensitiveDataScannerTextReplacementType::NONE),
                    ),
            )
            .id(rule_data_id.clone())
            .type_(SensitiveDataScannerRuleType::SENSITIVE_DATA_SCANNER_RULE),
        SensitiveDataScannerMetaVersionOnly::new(),
    );
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.update_scanning_rule(rule_data_id.clone(), body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Update Scanning Rule returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

// the "scanning_group" has a "scanning_rule"
const RULE_DATA_ID = process.env.RULE_DATA_ID as string;

const params: v2.SensitiveDataScannerApiUpdateScanningRuleRequest = {
  body: {
    meta: {},
    data: {
      id: RULE_DATA_ID,
      type: "sensitive_data_scanner_rule",
      attributes: {
        name: "Example-Sensitive-Data-Scanner",
        pattern: "pattern",
        textReplacement: {
          type: "none",
        },
        tags: ["sensitive_data:true"],
        isEnabled: true,
        priority: 5,
        includedKeywordConfiguration: {
          keywords: ["credit card", "cc"],
          characterCount: 35,
        },
      },
    },
  },
  ruleId: RULE_DATA_ID,
};

apiInstance
  .updateScanningRule(params)
  .then((data: v2.SensitiveDataScannerRuleUpdateResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

DELETE https://api.ap1.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.datadoghq.eu/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.ddog-gov.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.us3.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/{rule_id}

Información general

Delete a given rule. This endpoint requires the data_scanner_write permission.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

rule_id [required]

string

The ID of the rule.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

meta [required]

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {}
}

Respuesta

OK

Delete rule response.

Expand All

Campo

Tipo

Descripción

meta

object

Meta payload containing information about the API.

version

int64

Version of the API (optional).

{
  "meta": {
    "version": 0
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export rule_id="CHANGE_ME"
# Curl command
curl -X DELETE "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/sensitive-data-scanner/config/rules/${rule_id}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "meta": {} } EOF
// Delete Scanning Rule returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// the "scanning_group" has a "scanning_rule"
	RuleDataID := os.Getenv("RULE_DATA_ID")

	body := datadogV2.SensitiveDataScannerRuleDeleteRequest{
		Meta: datadogV2.SensitiveDataScannerMetaVersionOnly{},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewSensitiveDataScannerApi(apiClient)
	resp, r, err := api.DeleteScanningRule(ctx, RuleDataID, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SensitiveDataScannerApi.DeleteScanningRule`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SensitiveDataScannerApi.DeleteScanningRule`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Delete Scanning Rule returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.SensitiveDataScannerApi;
import com.datadog.api.client.v2.model.SensitiveDataScannerMetaVersionOnly;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleDeleteRequest;
import com.datadog.api.client.v2.model.SensitiveDataScannerRuleDeleteResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SensitiveDataScannerApi apiInstance = new SensitiveDataScannerApi(defaultClient);

    // the "scanning_group" has a "scanning_rule"
    String RULE_DATA_ID = System.getenv("RULE_DATA_ID");

    SensitiveDataScannerRuleDeleteRequest body =
        new SensitiveDataScannerRuleDeleteRequest().meta(new SensitiveDataScannerMetaVersionOnly());

    try {
      SensitiveDataScannerRuleDeleteResponse result =
          apiInstance.deleteScanningRule(RULE_DATA_ID, body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SensitiveDataScannerApi#deleteScanningRule");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Delete Scanning Rule returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.sensitive_data_scanner_api import SensitiveDataScannerApi
from datadog_api_client.v2.model.sensitive_data_scanner_meta_version_only import SensitiveDataScannerMetaVersionOnly
from datadog_api_client.v2.model.sensitive_data_scanner_rule_delete_request import SensitiveDataScannerRuleDeleteRequest

# the "scanning_group" has a "scanning_rule"
RULE_DATA_ID = environ["RULE_DATA_ID"]

body = SensitiveDataScannerRuleDeleteRequest(
    meta=SensitiveDataScannerMetaVersionOnly(),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SensitiveDataScannerApi(api_client)
    response = api_instance.delete_scanning_rule(rule_id=RULE_DATA_ID, body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Delete Scanning Rule returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::SensitiveDataScannerAPI.new

# the "scanning_group" has a "scanning_rule"
RULE_DATA_ID = ENV["RULE_DATA_ID"]

body = DatadogAPIClient::V2::SensitiveDataScannerRuleDeleteRequest.new({
  meta: DatadogAPIClient::V2::SensitiveDataScannerMetaVersionOnly.new({}),
})
p api_instance.delete_scanning_rule(RULE_DATA_ID, body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Delete Scanning Rule returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_sensitive_data_scanner::SensitiveDataScannerAPI;
use datadog_api_client::datadogV2::model::SensitiveDataScannerMetaVersionOnly;
use datadog_api_client::datadogV2::model::SensitiveDataScannerRuleDeleteRequest;

#[tokio::main]
async fn main() {
    // the "scanning_group" has a "scanning_rule"
    let rule_data_id = std::env::var("RULE_DATA_ID").unwrap();
    let body =
        SensitiveDataScannerRuleDeleteRequest::new(SensitiveDataScannerMetaVersionOnly::new());
    let configuration = datadog::Configuration::new();
    let api = SensitiveDataScannerAPI::with_config(configuration);
    let resp = api.delete_scanning_rule(rule_data_id.clone(), body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Delete Scanning Rule returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.SensitiveDataScannerApi(configuration);

// the "scanning_group" has a "scanning_rule"
const RULE_DATA_ID = process.env.RULE_DATA_ID as string;

const params: v2.SensitiveDataScannerApiDeleteScanningRuleRequest = {
  body: {
    meta: {},
  },
  ruleId: RULE_DATA_ID,
};

apiInstance
  .deleteScanningRule(params)
  .then((data: v2.SensitiveDataScannerRuleDeleteResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers