This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Overview

CircleCI Build Status CircleCI Orb Version Apache 2.0 License CircleCI Community

Run Synthetic tests in your CircleCI pipelines using the Datadog CircleCI orb.

The CircleCI command orb installs datadog-ci and uses the datadog-ci synthetics run-tests command to execute Datadog Synthetic tests.

Setup

To get started:

  1. Add your Datadog API and application keys as environment variables to your CircleCI project. For more information, see API and Application Keys.
  2. Ensure the image running the orb is a Linux x64 base image with cURL installed.
  3. Customize your workflow by creating a run-tests.yml file and following the naming conventions to specify inputs for your workflow.

Your workflow can be simple or complex.

Simple usage

Example orb usage using public IDs

version: 2.1

orbs:
  synthetics-ci: datadog/synthetics-ci-orb@4.2.0

jobs:
  e2e-tests:
    docker:
      - image: cimg/base:stable
    steps:
      - synthetics-ci/run-tests:
          public_ids: |
            abc-d3f-ghi
            jkl-mn0-pqr            

workflows:
  run-tests:
    jobs:
      - e2e-tests

Example orb usage using a global configuration override

This orb overrides the path to the pattern for test files.

version: 2.1

orbs:
  synthetics-ci: datadog/synthetics-ci-orb@4.2.0

jobs:
  e2e-tests:
    docker:
      - image: cimg/base:stable
    steps:
      - synthetics-ci/run-tests:
          files: e2e-tests/*.synthetics.json

workflows:
  run-tests:
    jobs:
      - e2e-tests

For another example pipeline that triggers Synthetic tests, see the simple-example.yml file.

Complex usage

Example orb usage using the test_search_query

version: 2.1

orbs:
  synthetics-ci: datadog/synthetics-ci-orb@4.2.0

jobs:
  e2e-tests:
    docker:
      - image: cimg/base:stable
    steps:
      - synthetics-ci/run-tests:
          test_search_query: 'tag:e2e-tests'

workflows:
  run-tests:
    jobs:
      - e2e-tests

Example orb usage using the Continuous Testing Tunnel

version: 2.1

orbs:
  synthetics-ci: datadog/synthetics-ci-orb@4.2.0

jobs:
  e2e-tests:
    docker:
      - image: your-image
    steps:
      - checkout
      - run:
          name: Running server in background
          command: npm start
          background: true
      - synthetics-ci/run-tests:
          config_path: tests/tunnel-config.json
          files: tests/*.synthetics.json
          test_search_query: 'tag:e2e-tests'
          tunnel: true

workflows:
  test-server:
    jobs:
      - build-image
      - integration-tests:
          requires:
            - build-image

For additional options such as customizing the batchTimeout for your CircleCI pipelines, see CI/CD Integrations Configuration. For another example pipeline that starts a local server and triggers Synthetic tests using the Continuous Testing Tunnel, see the advanced-example.yml file.

Inputs

To customize your workflow, you can set the following parameters in a run-tests.yml file:

NameTypeDefaultDescription
api_keyenv var nameDATADOG_API_KEYThe name of the environment variable containing the API key.
app_keyenv var nameDATADOG_APP_KEYThe name of the environment variable containing the APP key.
backgroundbooleanfalseWhether or not this step should run in the background. See official CircleCI documentation.
batch_timeoutnumber30 minutesThe duration (in milliseconds) after which the batch fails as timed out. The default is 30 minutes.
config_pathstringdatadog-ci.jsonThe global JSON configuration used when launching tests.
fail_on_critical_errorsbooleanfalseFail if tests were not triggered or results could not be fetched.
fail_on_missing_testsbooleanfalseFail if at least one specified test with a public ID (using public_ids or listed in a test file) is missing in a run (for example, if it has been deleted programmatically or on the Datadog site).
fail_on_timeoutbooleantrueForce the CI to fail (or pass) if one of the results exceeds its test timeout.
filesstring{,!(node_modules)/**/}*.synthetics.jsonA list of glob patterns to detect Synthetic tests config files, separated by new lines.
junit_reportstringnoneThe filename for a JUnit report if you want to generate one.
locationsstringvalues in test filesString of locations separated by semicolons to override the locations where your tests run.
no_output_timeoutstring30 minutesElapsed time the command can run without output. The string is a decimal with unit suffix, such as “20m”, “1.25h”, “5s”. See official CircleCI documentation.
public_idsstringvalues in test filesPublic IDs of Synthetic tests to run, separated by new lines or commas. If no value is provided, tests are discovered in *.synthetics.json files.
sitestringdatadoghq.comThe Datadog site to send data to. If the DD_SITE environment variable is set, it takes preference.
subdomainstringappThe name of the custom subdomain set to access your Datadog application.
test_search_querystringnoneTrigger tests corresponding to a search query.
tunnelbooleanfalseUse the Continuous Testing Tunnel to trigger tests.
variablesstringnoneKey-value pairs for injecting variables into tests, separated by newlines or commas. For example: START_URL=https://example.org,MY_VARIABLE=My title.

To learn about additional options for your CircleCI pipelines, see Continuous Testing & CI/CD Integrations Configuration.

Further reading

Additional helpful documentation, links, and articles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers