This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

aws_route_table

account_id

Type: STRING

associations

Type: UNORDERED_LIST_STRUCT
Provider name: Associations
Description: The associations between the route table and your subnets or gateways.

  • association_state
    Type: STRUCT
    Provider name: AssociationState
    Description: The state of the association.
    • state
      Type: STRING
      Provider name: State
      Description: The state of the association.
    • status_message
      Type: STRING
      Provider name: StatusMessage
      Description: The status message, if applicable.
  • gateway_id
    Type: STRING
    Provider name: GatewayId
    Description: The ID of the internet gateway or virtual private gateway.
  • main
    Type: BOOLEAN
    Provider name: Main
    Description: Indicates whether this is the main route table.
  • route_table_association_id
    Type: STRING
    Provider name: RouteTableAssociationId
    Description: The ID of the association.
  • route_table_id
    Type: STRING
    Provider name: RouteTableId
    Description: The ID of the route table.
  • subnet_id
    Type: STRING
    Provider name: SubnetId
    Description: The ID of the subnet. A subnet ID is not returned for an implicit association.

owner_id

Type: STRING
Provider name: OwnerId
Description: The ID of the Amazon Web Services account that owns the route table.

propagating_vgws

Type: UNORDERED_LIST_STRUCT
Provider name: PropagatingVgws
Description: Any virtual private gateway (VGW) propagating routes.

  • gateway_id
    Type: STRING
    Provider name: GatewayId
    Description: The ID of the virtual private gateway.

route_table_arn

Type: STRING

route_table_id

Type: STRING
Provider name: RouteTableId
Description: The ID of the route table.

routes

Type: UNORDERED_LIST_STRUCT
Provider name: Routes
Description: The routes in the route table.

  • carrier_gateway_id
    Type: STRING
    Provider name: CarrierGatewayId
    Description: The ID of the carrier gateway.
  • core_network_arn
    Type: STRING
    Provider name: CoreNetworkArn
    Description: The Amazon Resource Name (ARN) of the core network.
  • destination_cidr_block
    Type: STRING
    Provider name: DestinationCidrBlock
    Description: The IPv4 CIDR block used for the destination match.
  • destination_ipv6_cidr_block
    Type: STRING
    Provider name: DestinationIpv6CidrBlock
    Description: The IPv6 CIDR block used for the destination match.
  • destination_prefix_list_id
    Type: STRING
    Provider name: DestinationPrefixListId
    Description: The prefix of the Amazon Web Services service.
  • egress_only_internet_gateway_id
    Type: STRING
    Provider name: EgressOnlyInternetGatewayId
    Description: The ID of the egress-only internet gateway.
  • gateway_id
    Type: STRING
    Provider name: GatewayId
    Description: The ID of a gateway attached to your VPC.
  • instance_id
    Type: STRING
    Provider name: InstanceId
    Description: The ID of a NAT instance in your VPC.
  • instance_owner_id
    Type: STRING
    Provider name: InstanceOwnerId
    Description: The ID of Amazon Web Services account that owns the instance.
  • local_gateway_id
    Type: STRING
    Provider name: LocalGatewayId
    Description: The ID of the local gateway.
  • nat_gateway_id
    Type: STRING
    Provider name: NatGatewayId
    Description: The ID of a NAT gateway.
  • network_interface_id
    Type: STRING
    Provider name: NetworkInterfaceId
    Description: The ID of the network interface.
  • origin
    Type: STRING
    Provider name: Origin
    Description: Describes how the route was created.
    • CreateRouteTable - The route was automatically created when the route table was created.
    • CreateRoute - The route was manually added to the route table.
    • EnableVgwRoutePropagation - The route was propagated by route propagation.
  • state
    Type: STRING
    Provider name: State
    Description: The state of the route. The blackhole state indicates that the route’s target isn’t available (for example, the specified gateway isn’t attached to the VPC, or the specified NAT instance has been terminated).
  • transit_gateway_id
    Type: STRING
    Provider name: TransitGatewayId
    Description: The ID of a transit gateway.
  • vpc_peering_connection_id
    Type: STRING
    Provider name: VpcPeeringConnectionId
    Description: The ID of a VPC peering connection.

tags

Type: UNORDERED_LIST_STRING

vpc_id

Type: STRING
Provider name: VpcId
Description: The ID of the VPC.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers