This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

azure_diagnostic_setting

event_hub_authorization_rule_id

Type: STRING
Provider name: properties.eventHubAuthorizationRuleId
Description: The resource Id for the event hub authorization rule.

event_hub_name

Type: STRING
Provider name: properties.eventHubName
Description: The name of the event hub. If none is specified, the default event hub will be selected.

id

Type: STRING
Provider name: id
Description: Fully qualified resource ID for the resource. Ex - /subscriptions/{subscriptionId}/resourceGroups/{resourceGroupName}/providers/{resourceProviderNamespace}/{resourceType}/{resourceName}

log_analytics_destination_type

Type: STRING
Provider name: properties.logAnalyticsDestinationType
Description: A string indicating whether the export to Log Analytics should use the default destination type, i.e. AzureDiagnostics, or use a destination type constructed as follows: _. Possible values are: Dedicated and null (null is default.)

logs

Type: UNORDERED_LIST_STRUCT
Provider name: properties.logs
Description: The list of logs settings.

  • category
    Type: STRING
    Provider name: category
    Description: Name of a Diagnostic Log category for a resource type this setting is applied to. To obtain the list of Diagnostic Log categories for a resource, first perform a GET diagnostic settings operation.
  • category_group
    Type: STRING
    Provider name: categoryGroup
    Description: Name of a Diagnostic Log category group for a resource type this setting is applied to. To obtain the list of Diagnostic Log categories for a resource, first perform a GET diagnostic settings operation.
  • enabled
    Type: BOOLEAN
    Provider name: enabled
    Description: a value indicating whether this log is enabled.
  • retention_policy
    Type: STRUCT
    Provider name: retentionPolicy
    Description: the retention policy for this log.
    • days
      Type: INT32
      Provider name: days
      Description: the number of days for the retention in days. A value of 0 will retain the events indefinitely.
    • enabled
      Type: BOOLEAN
      Provider name: enabled
      Description: a value indicating whether the retention policy is enabled.

marketplace_partner_id

Type: STRING
Provider name: properties.marketplacePartnerId
Description: The full ARM resource ID of the Marketplace resource to which you would like to send Diagnostic Logs.

metrics

Type: UNORDERED_LIST_STRUCT
Provider name: properties.metrics
Description: The list of metric settings.

  • category
    Type: STRING
    Provider name: category
    Description: Name of a Diagnostic Metric category for a resource type this setting is applied to. To obtain the list of Diagnostic metric categories for a resource, first perform a GET diagnostic settings operation.
  • enabled
    Type: BOOLEAN
    Provider name: enabled
    Description: a value indicating whether this category is enabled.
  • retention_policy
    Type: STRUCT
    Provider name: retentionPolicy
    Description: the retention policy for this category.
    • days
      Type: INT32
      Provider name: days
      Description: the number of days for the retention in days. A value of 0 will retain the events indefinitely.
    • enabled
      Type: BOOLEAN
      Provider name: enabled
      Description: a value indicating whether the retention policy is enabled.
  • time_grain
    Type: STRING
    Provider name: timeGrain
    Description: the timegrain of the metric in ISO8601 format.

name

Type: STRING
Provider name: name
Description: The name of the resource

resource_group

Type: STRING

service_bus_rule_id

Type: STRING
Provider name: properties.serviceBusRuleId
Description: The service bus rule Id of the diagnostic setting. This is here to maintain backwards compatibility.

storage_account_id

Type: STRING
Provider name: properties.storageAccountId
Description: The resource ID of the storage account to which you would like to send Diagnostic Logs.

subscription_id

Type: STRING

subscription_name

Type: STRING

system_data

Type: STRUCT
Provider name: systemData
Description: The system metadata related to this resource.

  • created_at
    Type: STRING
    Provider name: createdAt
    Description: The timestamp of resource creation (UTC).
  • created_by
    Type: STRING
    Provider name: createdBy
    Description: The identity that created the resource.
  • created_by_type
    Type: STRING
    Provider name: createdByType
    Description: The type of identity that created the resource.
  • last_modified_at
    Type: STRING
    Provider name: lastModifiedAt
    Description: The timestamp of resource last modification (UTC)
  • last_modified_by
    Type: STRING
    Provider name: lastModifiedBy
    Description: The identity that last modified the resource.
  • last_modified_by_type
    Type: STRING
    Provider name: lastModifiedByType
    Description: The type of identity that last modified the resource.

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: The type of the resource. E.g. “Microsoft.Compute/virtualMachines” or “Microsoft.Storage/storageAccounts”

workspace_id

Type: STRING
Provider name: properties.workspaceId
Description: The full ARM resource ID of the Log Analytics workspace to which you would like to send Diagnostic Logs. Example: /subscriptions/4b9e8510-67ab-4e9a-95a9-e2f1e570ea9c/resourceGroups/insights-integration/providers/Microsoft.OperationalInsights/workspaces/viruela2

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers