This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

azure_postgresql_server

administrator_login

Type: STRING
Provider name: properties.administratorLogin
Description: The administrator’s login name of a server. Can only be specified when the server is being created (and is required for creation).

byok_enforcement

Type: STRING
Provider name: properties.byokEnforcement
Description: Status showing whether the server data encryption is enabled with customer-managed keys.

earliest_restore_date

Type: STRING
Provider name: properties.earliestRestoreDate
Description: Earliest restore point creation time (ISO8601 format)

firewall_rules

Type: UNORDERED_LIST_STRUCT
Provider name: FirewallRule

  • end_ip_address
    Type: STRING
    Provider name: properties.endIpAddress
    Description: The end IP address of the server firewall rule. Must be IPv4 format.
  • id
    Type: STRING
    Provider name: id
    Description: Fully qualified resource ID for the resource. Ex - /subscriptions/{subscriptionId}/resourceGroups/{resourceGroupName}/providers/{resourceProviderNamespace}/{resourceType}/{resourceName}
  • name
    Type: STRING
    Provider name: name
    Description: The name of the resource
  • start_ip_address
    Type: STRING
    Provider name: properties.startIpAddress
    Description: The start IP address of the server firewall rule. Must be IPv4 format.
  • type
    Type: STRING
    Provider name: type
    Description: The type of the resource. E.g. “Microsoft.Compute/virtualMachines” or “Microsoft.Storage/storageAccounts”

fully_qualified_domain_name

Type: STRING
Provider name: properties.fullyQualifiedDomainName
Description: The fully qualified domain name of a server.

id

Type: STRING
Provider name: id
Description: Fully qualified resource ID for the resource. Ex - /subscriptions/{subscriptionId}/resourceGroups/{resourceGroupName}/providers/{resourceProviderNamespace}/{resourceType}/{resourceName}

identity

Type: STRUCT
Provider name: identity
Description: The Azure Active Directory identity of the server.

  • principal_id
    Type: STRING
    Provider name: principalId
    Description: The Azure Active Directory principal id.
  • tenant_id
    Type: STRING
    Provider name: tenantId
    Description: The Azure Active Directory tenant id.
  • type
    Type: STRING
    Provider name: type
    Description: The identity type. Set this to ‘SystemAssigned’ in order to automatically create and assign an Azure Active Directory principal for the resource.

infrastructure_encryption

Type: STRING
Provider name: properties.infrastructureEncryption
Description: Status showing whether the server enabled infrastructure encryption.

location

Type: STRING
Provider name: location
Description: The geo-location where the resource lives

master_server_id

Type: STRING
Provider name: properties.masterServerId
Description: The master server id of a replica server.

minimal_tls_version

Type: STRING
Provider name: properties.minimalTlsVersion
Description: Enforce a minimal Tls version for the server.

name

Type: STRING
Provider name: name
Description: The name of the resource

public_network_access

Type: STRING
Provider name: properties.publicNetworkAccess
Description: Whether or not public network access is allowed for this server. Value is optional but if passed in, must be ‘Enabled’ or ‘Disabled’

replica_capacity

Type: INT32
Provider name: properties.replicaCapacity
Description: The maximum number of replicas that a master server can have.

replication_role

Type: STRING
Provider name: properties.replicationRole
Description: The replication role of the server.

resource_group

Type: STRING

server_configs

Type: UNORDERED_LIST_STRUCT
Provider name: Configuration

  • allowed_values
    Type: STRING
    Provider name: properties.allowedValues
    Description: Allowed values of the configuration.
  • data_type
    Type: STRING
    Provider name: properties.dataType
    Description: Data type of the configuration.
  • default_value
    Type: STRING
    Provider name: properties.defaultValue
    Description: Default value of the configuration.
  • description
    Type: STRING
    Provider name: properties.description
    Description: Description of the configuration.
  • id
    Type: STRING
    Provider name: id
    Description: Fully qualified resource ID for the resource. Ex - /subscriptions/{subscriptionId}/resourceGroups/{resourceGroupName}/providers/{resourceProviderNamespace}/{resourceType}/{resourceName}
  • name
    Type: STRING
    Provider name: name
    Description: The name of the resource
  • type
    Type: STRING
    Provider name: type
    Description: The type of the resource. E.g. “Microsoft.Compute/virtualMachines” or “Microsoft.Storage/storageAccounts”
  • value
    Type: STRING
    Provider name: properties.value
    Description: Value of the configuration.

sku

Type: STRUCT
Provider name: sku
Description: The SKU (pricing tier) of the server.

  • capacity
    Type: INT32
    Provider name: capacity
    Description: The scale up/out capacity, representing server’s compute units.
  • family
    Type: STRING
    Provider name: family
    Description: The family of hardware.
  • name
    Type: STRING
    Provider name: name
    Description: The name of the sku, typically, tier + family + cores, e.g. B_Gen4_1, GP_Gen5_8.
  • size
    Type: STRING
    Provider name: size
    Description: The size code, to be interpreted by resource as appropriate.
  • tier
    Type: STRING
    Provider name: tier
    Description: The tier of the particular SKU, e.g. Basic.

ssl_enforcement

Type: STRING
Provider name: properties.sslEnforcement
Description: Enable ssl enforcement or not when connect to server.

storage_profile

Type: STRUCT
Provider name: properties.storageProfile
Description: Storage profile of a server.

  • backup_retention_days
    Type: INT32
    Provider name: backupRetentionDays
    Description: Backup retention days for the server.
  • geo_redundant_backup
    Type: STRING
    Provider name: geoRedundantBackup
    Description: Enable Geo-redundant or not for server backup.
  • storage_autogrow
    Type: STRING
    Provider name: storageAutogrow
    Description: Enable Storage Auto Grow.
  • storage_mb
    Type: INT32
    Provider name: storageMB
    Description: Max storage allowed for a server.

subscription_id

Type: STRING

subscription_name

Type: STRING

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: The type of the resource. E.g. “Microsoft.Compute/virtualMachines” or “Microsoft.Storage/storageAccounts”

user_visible_state

Type: STRING
Provider name: properties.userVisibleState
Description: A state of a server that is visible to user.

version

Type: STRING
Provider name: properties.version
Description: Server version.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers