This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

azure_sql_server_database

auto_pause_delay

Type: INT64
Provider name: properties.autoPauseDelay
Description: Time in minutes after which database is automatically paused. A value of -1 means that automatic pause is disabled

catalog_collation

Type: STRING
Provider name: properties.catalogCollation
Description: Collation of the metadata catalog.

collation

Type: STRING
Provider name: properties.collation
Description: The collation of the database.

create_mode

Type: STRING
Provider name: properties.createMode
Description: Specifies the mode of database creation.Default: regular database creation.Copy: creates a database as a copy of an existing database. sourceDatabaseId must be specified as the resource ID of the source database.Secondary: creates a database as a secondary replica of an existing database. sourceDatabaseId must be specified as the resource ID of the existing primary database.PointInTimeRestore: Creates a database by restoring a point in time backup of an existing database. sourceDatabaseId must be specified as the resource ID of the existing database, and restorePointInTime must be specified.Recovery: Creates a database by restoring a geo-replicated backup. sourceDatabaseId must be specified as the recoverable database resource ID to restore.Restore: Creates a database by restoring a backup of a deleted database. sourceDatabaseId must be specified. If sourceDatabaseId is the database’s original resource ID, then sourceDatabaseDeletionDate must be specified. Otherwise sourceDatabaseId must be the restorable dropped database resource ID and sourceDatabaseDeletionDate is ignored. restorePointInTime may also be specified to restore from an earlier point in time.RestoreLongTermRetentionBackup: Creates a database by restoring from a long term retention vault. recoveryServicesRecoveryPointResourceId must be specified as the recovery point resource ID.Copy, Secondary, and RestoreLongTermRetentionBackup are not supported for DataWarehouse edition.

creation_date

Type: STRING
Provider name: properties.creationDate
Description: The creation date of the database (ISO8601 format).

current_service_objective_name

Type: STRING
Provider name: properties.currentServiceObjectiveName
Description: The current service level objective name of the database.

current_sku

Type: STRUCT
Provider name: properties.currentSku
Description: The name and tier of the SKU.

  • capacity
    Type: INT32
    Provider name: capacity
    Description: Capacity of the particular SKU.
  • family
    Type: STRING
    Provider name: family
    Description: If the service has different generations of hardware, for the same SKU, then that can be captured here.
  • name
    Type: STRING
    Provider name: name
    Description: The name of the SKU, typically, a letter + Number code, e.g. P3.
  • size
    Type: STRING
    Provider name: size
    Description: Size of the particular SKU
  • tier
    Type: STRING
    Provider name: tier
    Description: The tier or edition of the particular SKU, e.g. Basic, Premium.

database_id

Type: STRING
Provider name: properties.databaseId
Description: The ID of the database.

default_secondary_location

Type: STRING
Provider name: properties.defaultSecondaryLocation
Description: The default secondary region for this database.

earliest_restore_date

Type: STRING
Provider name: properties.earliestRestoreDate
Description: This records the earliest start date and time that restore is available for this database (ISO8601 format).

elastic_pool_id

Type: STRING
Provider name: properties.elasticPoolId
Description: The resource identifier of the elastic pool containing this database.

failover_group_id

Type: STRING
Provider name: properties.failoverGroupId
Description: Failover Group resource identifier that this database belongs to.

high_availability_replica_count

Type: INT32
Provider name: properties.highAvailabilityReplicaCount
Description: The number of secondary replicas associated with the database that are used to provide high availability.

id

Type: STRING
Provider name: id
Description: Resource ID.

kind

Type: STRING
Provider name: kind
Description: Kind of database. This is metadata used for the Azure portal experience.

license_type

Type: STRING
Provider name: properties.licenseType
Description: The license type to apply for this database. LicenseIncluded if you need a license, or BasePrice if you have a license and are eligible for the Azure Hybrid Benefit.

location

Type: STRING
Provider name: location
Description: Resource location.

long_term_retention_backup_resource_id

Type: STRING
Provider name: properties.longTermRetentionBackupResourceId
Description: The resource identifier of the long term retention backup associated with create operation of this database.

maintenance_configuration_id

Type: STRING
Provider name: properties.maintenanceConfigurationId
Description: Maintenance configuration id assigned to the database. This configuration defines the period when the maintenance updates will occur.

managed_by

Type: STRING
Provider name: managedBy
Description: Resource that manages the database.

max_log_size_bytes

Type: INT64
Provider name: properties.maxLogSizeBytes
Description: The max log size for this database.

max_size_bytes

Type: INT64
Provider name: properties.maxSizeBytes
Description: The max size of the database expressed in bytes.

min_capacity

Type: DOUBLE
Provider name: properties.minCapacity
Description: Minimal capacity that database will always have allocated, if not paused

name

Type: STRING
Provider name: name
Description: Resource name.

paused_date

Type: STRING
Provider name: properties.pausedDate
Description: The date when database was paused by user configuration or action(ISO8601 format). Null if the database is ready.

read_scale

Type: STRING
Provider name: properties.readScale
Description: The state of read-only routing. If enabled, connections that have application intent set to readonly in their connection string may be routed to a readonly secondary replica in the same region.

recoverable_database_id

Type: STRING
Provider name: properties.recoverableDatabaseId
Description: The resource identifier of the recoverable database associated with create operation of this database.

recovery_services_recovery_point_id

Type: STRING
Provider name: properties.recoveryServicesRecoveryPointId
Description: The resource identifier of the recovery point associated with create operation of this database.

requested_service_objective_name

Type: STRING
Provider name: properties.requestedServiceObjectiveName
Description: The requested service level objective name of the database.

resource_group

Type: STRING

restorable_dropped_database_id

Type: STRING
Provider name: properties.restorableDroppedDatabaseId
Description: The resource identifier of the restorable dropped database associated with create operation of this database.

restore_point_in_time

Type: STRING
Provider name: properties.restorePointInTime
Description: Specifies the point in time (ISO8601 format) of the source database that will be restored to create the new database.

resumed_date

Type: STRING
Provider name: properties.resumedDate
Description: The date when database was resumed by user action or database login (ISO8601 format). Null if the database is paused.

sample_name

Type: STRING
Provider name: properties.sampleName
Description: The name of the sample schema to apply when creating this database.

secondary_type

Type: STRING
Provider name: properties.secondaryType
Description: The secondary type of the database if it is a secondary. Valid values are Geo and Named.

sku

Type: STRUCT
Provider name: sku
Description: The database SKU.The list of SKUs may vary by region and support offer. To determine the SKUs (including the SKU name, tier/edition, family, and capacity) that are available to your subscription in an Azure region, use the Capabilities_ListByLocation REST API or one of the following commands:```azurecliaz sql db list-editions -l -o table```````powershellGet-AzSqlServerServiceObjective -Location ````

  • capacity
    Type: INT32
    Provider name: capacity
    Description: Capacity of the particular SKU.
  • family
    Type: STRING
    Provider name: family
    Description: If the service has different generations of hardware, for the same SKU, then that can be captured here.
  • name
    Type: STRING
    Provider name: name
    Description: The name of the SKU, typically, a letter + Number code, e.g. P3.
  • size
    Type: STRING
    Provider name: size
    Description: Size of the particular SKU
  • tier
    Type: STRING
    Provider name: tier
    Description: The tier or edition of the particular SKU, e.g. Basic, Premium.

source_database_deletion_date

Type: STRING
Provider name: properties.sourceDatabaseDeletionDate
Description: Specifies the time that the database was deleted.

source_database_id

Type: STRING
Provider name: properties.sourceDatabaseId
Description: The resource identifier of the source database associated with create operation of this database.

status

Type: STRING
Provider name: properties.status
Description: The status of the database.

storage_account_type

Type: STRING
Provider name: properties.storageAccountType
Description: The storage account type used to store backups for this database.

subscription_id

Type: STRING

subscription_name

Type: STRING

tags

Type: UNORDERED_LIST_STRING

transparent_data_encryption

Type: STRUCT
Provider name: LogicalDatabaseTransparentDataEncryption

  • id
    Type: STRING
    Provider name: id
    Description: Resource ID.
  • name
    Type: STRING
    Provider name: name
    Description: Resource name.
  • state
    Type: STRING
    Provider name: properties.state
    Description: Specifies the state of the transparent data encryption.
  • type
    Type: STRING
    Provider name: type
    Description: Resource type.

type

Type: STRING
Provider name: type
Description: Resource type.

zone_redundant

Type: BOOLEAN
Provider name: properties.zoneRedundant
Description: Whether or not this database is zone redundant, which means the replicas of this database will be spread across multiple availability zones.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers