Amazon PrivateLink

Información general

AWS PrivateLink proporciona conectividad privada entre VPC, servicios AWS y tus redes on-premises.

Habilita esta integración para monitorizar el estado y el rendimiento de tus endpoints de VPC o servicios de endpoints con Datadog.

Importante: Si quieres enviar datos de telemetría a Datadog a través de PrivateLink, sigue estas instrucciones.

Configuración

Instalación

Si aún no lo has hecho, configura primero la integración de Amazon Web Services.

Recopilación de métricas

  1. En la página de la integración AWS, asegúrate de que PrivateLinkEndPoints y PrivateLinkServices están habilitados en la pestaña Metric Collection.
  2. Instala la integración Datadog - AWS PrivateLink.

Datos recopilados

Métricas

aws.privatelinkservices.active_connections
(gauge)
The number of active connections from clients to targets through the endpoints.
aws.privatelinkservices.bytes_processed
(count)
The number of bytes exchanged between endpoint services and endpoints in both directions.
aws.privatelinkservices.endpoints_count
(gauge)
The number of endpoints connected to the endpoint service.
aws.privatelinkservices.new_connections
(count)
The number of new connections established from clients to targets through the endpoints.
aws.privatelinkservices.rst_packets_sent
(count)
The number of RST packets sent to endpoints by the endpoint service.
aws.privatelinkendpoints.active_connections
(gauge)
The number of concurrent active connections. This includes connections in the SYN_SENT and ESTABLISHED states.
aws.privatelinkendpoints.bytes_processed
(count)
The number of bytes exchanged between endpoints and endpoint services aggregated in both directions.
aws.privatelinkendpoints.new_connections
(count)
The number of new connections established through the endpoint.
aws.privatelinkendpoints.packets_dropped
(count)
The number of packets dropped by the endpoint.
aws.privatelinkendpoints.rst_packets_received
(count)
The number of RST packets received by the endpoint.

Eventos

La integración AWS PrivateLink no incluye eventos.

Checks de servicio

La integración AWS PrivateLink no incluye checks de servicios.

Resolución de problemas

¿Necesitas ayuda? Ponte en contacto con el soporte de Datadog.

Referencias adicionales

Más enlaces, artículos y documentación útiles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers