Microsoft Azure DB for MariaDB

Información general

Azure Database for MariaDB proporciona una base de datos como servicio MariaDB comunitaria, totalmente gestionada y preparada para empresas.

Obtén métricas de Azure Database for MariaDB para:

  • Visualizar el rendimiento de tus bases de datos MariaDB
  • Correlacionar el rendimiento de tus bases de datos MariaDB con tus aplicaciones

Configuración

Instalación

Si aún no lo has hecho, primero configura la integración Microsoft Azure. No es necesario realizar ningún otro paso de instalación.

Datos recopilados

Métricas

azure.dbformariadb_servers.active_connections
(count)
Active Connections
Shown as connection
azure.dbformariadb_servers.backup_storage_used
(gauge)
Amount of backup storage used
Shown as byte
azure.dbformariadb_servers.connections_failed
(count)
Failed Connections
Shown as connection
azure.dbformariadb_servers.count
(gauge)
The count of Azure DB for MariaDB resources
azure.dbformariadb_servers.cpu_percent
(gauge)
CPU percent
Shown as percent
azure.dbformariadb_servers.io_consumption_percent
(gauge)
IO percent
Shown as percent
azure.dbformariadb_servers.memory_percent
(gauge)
Memory percent
Shown as percent
azure.dbformariadb_servers.network_bytes_egress
(gauge)
Network Out across active connections
Shown as byte
azure.dbformariadb_servers.network_bytes_ingress
(gauge)
Network In across active connections
Shown as byte
azure.dbformariadb_servers.seconds_behind_master
(gauge)
The number of seconds a replica server is lagging behind its source server
Shown as byte
azure.dbformariadb_servers.serverlog_storage_limit
(gauge)
Server Log storage limit
Shown as byte
azure.dbformariadb_servers.serverlog_storage_percent
(gauge)
Server Log storage percent
Shown as percent
azure.dbformariadb_servers.serverlog_storage_usage
(gauge)
Server Log storage used
Shown as byte
azure.dbformariadb_servers.storage_limit
(gauge)
Storage limit
Shown as byte
azure.dbformariadb_servers.storage_percent
(gauge)
Storage percent
Shown as percent
azure.dbformariadb_servers.storage_used
(gauge)
Storage used
Shown as byte

Eventos

La integración Azure Database for MariaDB no incluye eventos.

Checks de servicio

La integración Azure Database for MariaDB no incluye checks de servicios.

Solucionar problemas

¿Necesitas ayuda? Ponte en contacto con el servicio de asistencia de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers