Azure DB for MariaDB

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Overview

Azure Database for MariaDB provides fully managed, enterprise-ready community MariaDB database as a service.

Get metrics from Azure Database for MariaDB to:

  • Visualize the performance of your MariaDB databases
  • Correlate the performance of your MariaDB databases with your applications

Setup

Installation

If you haven’t already, set up the Microsoft Azure integration first. There are no other installation steps.

Data Collected

Metrics

azure.dbformariadb_servers.active_connections
(count)
Active Connections
Shown as connection
azure.dbformariadb_servers.backup_storage_used
(gauge)
Amount of backup storage used
Shown as byte
azure.dbformariadb_servers.connections_failed
(count)
Failed Connections
Shown as connection
azure.dbformariadb_servers.count
(gauge)
The count of Azure DB for MariaDB resources
azure.dbformariadb_servers.cpu_percent
(gauge)
CPU percent
Shown as percent
azure.dbformariadb_servers.io_consumption_percent
(gauge)
IO percent
Shown as percent
azure.dbformariadb_servers.memory_percent
(gauge)
Memory percent
Shown as percent
azure.dbformariadb_servers.network_bytes_egress
(gauge)
Network Out across active connections
Shown as byte
azure.dbformariadb_servers.network_bytes_ingress
(gauge)
Network In across active connections
Shown as byte
azure.dbformariadb_servers.seconds_behind_master
(gauge)
The number of seconds a replica server is lagging behind its source server
Shown as byte
azure.dbformariadb_servers.serverlog_storage_limit
(gauge)
Server Log storage limit
Shown as byte
azure.dbformariadb_servers.serverlog_storage_percent
(gauge)
Server Log storage percent
Shown as percent
azure.dbformariadb_servers.serverlog_storage_usage
(gauge)
Server Log storage used
Shown as byte
azure.dbformariadb_servers.storage_limit
(gauge)
Storage limit
Shown as byte
azure.dbformariadb_servers.storage_percent
(gauge)
Storage percent
Shown as percent
azure.dbformariadb_servers.storage_used
(gauge)
Storage used
Shown as byte

Events

The Azure Database for MariaDB integration does not include any events.

Service Checks

The Azure Database for MariaDB integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers