Microsoft Azure Load Balancer

Información general

Azure Load Balancer admite escenarios entrantes y salientes, proporciona baja latencia y alto rendimiento, y escala hasta millones de flujos para todas las aplicaciones TCP y UDP.

Utiliza la integración de Azure con Datadog para recopilar métricas de Azure Load Balancer.

Configuración

Instalación

Si aún no lo has hecho, primero configura la integración Microsoft Azure. No es necesario realizar ningún otro paso de instalación.

Datos recopilados

Métricas

azure.network_loadbalancers.allocated_snat_ports
(count)
Total number of SNAT ports allocated within time period
azure.network_loadbalancers.backend_pool_host_count
(gauge)
Total number of hosts in the backed end pool for the Load Balancer
Shown as host
azure.network_loadbalancers.byte_count
(count)
Total number of Bytes transmitted within time period
Shown as byte
azure.network_loadbalancers.health_probe_status
(gauge)
Average Load Balancer health probe status per time duration
Shown as percent
azure.network_loadbalancers.packet_count
(count)
Total number of Packets transmitted within time period
Shown as packet
azure.network_loadbalancers.snat_connection_count
(count)
Total number of new SNAT connections created within time period
Shown as connection
azure.network_loadbalancers.count
(gauge)
Count of Azure Load Balancer
azure.network_loadbalancers.syn_count
(count)
Total number of SYN Packets transmitted within time period
Shown as packet
azure.network_loadbalancers.used_snat_ports
(count)
Total number of SNAT ports used within time period
azure.network_loadbalancers.data_path_availability
(gauge)
Average Load Balancer data path availability per time duration
Shown as percent

Eventos

La integración Azure Load Balancer no incluye eventos.

Checks de servicios

La integración Azure Load Balancer no incluye checks de servicios.

Solucionar problemas

¿Necesitas ayuda? Ponte en contacto con el servicio de asistencia de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers