Microsoft Azure Network Interface

Información general

Azure Network Interface permite que una máquina virtual de Azure se comunique con Internet, Azure y recursos locales.

Utiliza la integración de Azure con Datadog para recopilar métricas de Azure Network Interface.

Configuración

Instalación

Si aún no lo has hecho, primero configura la integración Microsoft Azure. No es necesario realizar ningún otro paso de instalación.

Datos recopilados

Métricas

azure.network_networkinterfaces.bytes_received_rate
(count)
Number of bytes the Network Interface received.
Shown as byte
azure.network_networkinterfaces.bytes_sent_rate
(count)
Number of bytes the Network Interface sent.
Shown as byte
azure.network_networkinterfaces.packets_received_rate
(count)
Number of packets the Network Interface received.
Shown as packet
azure.network_networkinterfaces.packets_sent_rate
(count)
Number of packets the Network Interface sent.
Shown as packet
azure.network_networkinterfaces.count
(gauge)
The count of all Azure Network Interface resources.

Eventos

La integración Azure Network Interface no incluye eventos.

Checks de servicios

La integración Azure Network Interface no incluye checks de servicios.

Solucionar problemas

¿Necesitas ayuda? Ponte en contacto con el servicio de asistencia de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers