Supported OS

Versión de la integración3.0.0

Información general

Este check monitoriza Flink. Datadog recopila métricas de Flink a través del Reportador HTTP de Datadog de Flink, que utiliza la API HTTP de Datadog.

Configuración

Instalación

El check de Flink está incluido en el paquete del Datadog Agent. No es necesaria ninguna instalación adicional en tu servidor.

Configuración

Recopilación de métricas

  1. Configura el Reportador HTTP de Datadog en Flink.

    En tu <FLINK_HOME>/conf/flink-conf.yaml, añade estas líneas, sustituyendo <DATADOG_API_KEY> por tu clave de API Datadog:

    metrics.reporter.dghttp.factory.class: org.apache.flink.metrics.datadog.DatadogHttpReporterFactory
    metrics.reporter.dghttp.apikey: <DATADOG_API_KEY>
    metrics.reporter.dghttp.dataCenter: US #(optional) The data center (EU/US) to connect to, defaults to US.
    
  2. Vuelve a asignar contextos de sistema en tu <FLINK_HOME>/conf/flink-conf.yaml.

    metrics.scope.jm: flink.jobmanager
    metrics.scope.jm.job: flink.jobmanager.job
    metrics.scope.tm: flink.taskmanager
    metrics.scope.tm.job: flink.taskmanager.job
    metrics.scope.task: flink.task
    metrics.scope.operator: flink.operator
    

    Nota: Los contextos de sistema deben ser reasignados para que tus métricas de Flink sean compatibles, de lo contrario se envían como métricas personalizadas.

  3. Configura etiquetas (tags) adicionales en <FLINK_HOME>/conf/flink-conf.yaml. El siguiente es un ejemplo de etiquetas personalizadas:

    metrics.reporter.dghttp.scope.variables.additional: <KEY1>:<VALUE1>, <KEY1>:<VALUE2>
    

    Nota: Por defecto, cualquier variable en los nombres de las métrica se envía como etiqueta, por lo que no es necesario añadir etiquetas personalizadas para job_id, task_id, etc.

  4. Reinicia Flink para empezar a enviar tus métricas de Flink a Datadog.

Recopilación de logs

Disponible para la versión 6.0 o posteriores del Agent

  1. Flink utiliza el generador de logs log4j por defecto. Para habilitar la generación de logs en un archivo, personaliza el formato editando los archivos de configuración log4j*.properties en el directorio conf/ de la distribución de Flink. Consulta la documentación de generación de logs de Flink para obtener información sobre qué archivo de configuración es relevante para tu configuración. Consulta el repositorio de Flink para ver las configuraciones predeterminadas.

  2. Por defecto, el pipeline de la integración admite el siguiente patrón de diseño:

    %d{yyyy-MM-dd HH:mm:ss,SSS} %-5p %-60c %x - %m%n
    

    Un ejemplo de marca de tiempo válida es: 2020-02-03 18:43:12,251.

    Clona y edita el pipeline de la integración si tienes un formato diferente.

  3. La recopilación de logs está desactivada por defecto en el Datadog Agent, actívala en tu archivo datadog.yaml:

    logs_enabled: true
    
  4. Descomenta y edita el bloque de configuración de logs en tu archivo flink.d/conf.yaml. Cambia los valores de los parámetros path y service en función de tu entorno. Consulta el flink.d/conf.yaml de ejemplo para conocer todas las opciones de configuración disponibles.

    logs:
      - type: file
        path: /var/log/flink/server.log
        source: flink
        service: myapp
        #To handle multi line that starts with yyyy-mm-dd use the following pattern
        #log_processing_rules:
        #  - type: multi_line
        #    pattern: \d{4}\-(0?[1-9]|1[012])\-(0?[1-9]|[12][0-9]|3[01])
        #    name: new_log_start_with_date
    
  5. Reinicia el Agent.

Validación

Ejecuta el subcomando de estado del Agent y busca flink en la sección Checks.

Datos recopilados

Métricas

flink.jobmanager.Status.JVM.CPU.Load
(gauge)
The recent CPU usage of the JVM in the jobmanager
Shown as percent
flink.jobmanager.Status.JVM.CPU.Time
(gauge)
The CPU time used by the JVM in the jobmanager
Shown as second
flink.jobmanager.Status.JVM.ClassLoader.ClassesLoaded
(count)
The total number of classes loaded since the start of the JVM in the jobmanager
flink.jobmanager.Status.JVM.ClassLoader.ClassesUnloaded
(count)
The total number of classes unloaded since the start of the JVM in the jobmanager
flink.jobmanager.Status.JVM.Memory.Direct.Count
(count)
The number of buffers in the direct buffer pool in the jobmanager
Shown as buffer
flink.jobmanager.Status.JVM.Memory.Direct.MemoryUsed
(gauge)
The amount of memory used by the JVM for the direct buffer pool in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.Direct.TotalCapacity
(count)
The total capacity of all buffers in the direct buffer pool in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.Heap.Committed
(gauge)
The amount of heap memory guaranteed to be available to the JVM in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.Heap.Max
(gauge)
The maximum amount of heap memory that can be used for memory management in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.Heap.Used
(gauge)
The amount of heap memory currently used in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.Mapped.Count
(gauge)
The number of buffers in the mapped buffer pool in the jobmanager
Shown as buffer
flink.jobmanager.Status.JVM.Memory.Mapped.MemoryUsed
(gauge)
The amount of memory used by the JVM for the mapped buffer pool in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.Mapped.TotalCapacity
(count)
The total capacity of all buffers in the mapped buffer pool in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.NonHeap.Committed
(gauge)
The amount of non-heap memory guaranteed to be available to the JVM in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.NonHeap.Max
(gauge)
The maximum amount of non-heap memory that can be used for memory management in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Memory.NonHeap.Used
(gauge)
The amount of non-heap memory currently used in the jobmanager
Shown as byte
flink.jobmanager.Status.JVM.Threads.Count
(count)
The total number of live threads in the jobmanager
Shown as thread
flink.jobmanager.job.downtime
(gauge)
For jobs currently in a failing/recovering situation- the time elapsed during this outage. Returns 0 for running jobs and -1 for completed jobs
Shown as millisecond
flink.jobmanager.job.lastCheckpointAlignmentBuffered
(gauge)
The number of buffered bytes during alignment over all subtasks for the last checkpoint
Shown as byte
flink.jobmanager.job.lastCheckpointDuration
(gauge)
The time it took to complete the last checkpoint
Shown as millisecond
flink.jobmanager.job.lastCheckpointExternalPath
(gauge)
The path where the last external checkpoint was stored
flink.jobmanager.job.lastCheckpointRestoreTimestamp
(gauge)
Timestamp when the last checkpoint was restored at the coordinator
Shown as millisecond
flink.jobmanager.job.lastCheckpointSize
(gauge)
The total size of the last checkpoint
Shown as byte
flink.jobmanager.job.numRestarts
(gauge)
The total number of restarts since this job was submitted, including full restarts and fine-grained restarts
flink.jobmanager.job.numberOfCompletedCheckpoints
(count)
The number of successfully completed checkpoints
flink.jobmanager.job.numberOfFailedCheckpoints
(count)
The number of failed checkpoints
flink.jobmanager.job.numberOfInProgressCheckpoints
(gauge)
The number of in progress checkpoints
flink.jobmanager.job.restartingTime
(gauge)
The time it took to restart the job or how long the current restart has been in progress
Shown as millisecond
flink.jobmanager.job.totalNumberOfCheckpoints
(count)
The number of total checkpoints (in progress completed and failed)
flink.jobmanager.job.uptime
(gauge)
The time that the job has been running without interruption. Returns -1 for completed jobs
Shown as millisecond
flink.jobmanager.numRegisteredTaskManagers
(gauge)
The number of registered taskmanagers
flink.jobmanager.numRunningJobs
(gauge)
The number of running jobs
Shown as job
flink.jobmanager.taskSlotsTotal
(gauge)
The total number of task slots
flink.operator.commitsFailed
(count)
The total number of offset commit failures to Kafka if offset committing is turned on and checkpointing is enabled. Note that committing offsets back to Kafka is only a means to expose consumer progress so a commit failure does not affect the integrity of Flink's checkpointed partition offsets
Shown as commit
flink.operator.commitsSucceeded
(count)
The total number of successful offset commits to Kafka if offset committing is turned on and checkpointing is enabled
Shown as commit
flink.operator.currentInput1Watermark
(gauge)
The last watermark this operator has received in its first input. Only for operators with 2 inputs
Shown as millisecond
flink.operator.currentInput2Watermark
(gauge)
The last watermark this operator has received in its second input. Only for operators with 2 inputs
Shown as millisecond
flink.operator.currentInputWatermark
(gauge)
The last watermark this operator has received. For tasks with 2 inputs this is the minimum of the last received watermarks
Shown as millisecond
flink.operator.currentOutputWatermark
(gauge)
The last watermark this operator has emitted
Shown as millisecond
flink.operator.numLateRecordsDropped
(count)
The number of records this operator has dropped due to arriving late
Shown as record
flink.operator.numRecordsIn
(count)
The total number of records this operator has received
Shown as record
flink.operator.numRecordsInPerSecond
(gauge)
The number of records this operator receives per second
Shown as record
flink.operator.numRecordsOut
(count)
The total number of records this operator has emitted
Shown as record
flink.operator.numRecordsOutPerSec
(gauge)
The total number of records this operator has emitted per second
Shown as record
flink.operator.numSplitsProcessed
(count)
The total number of InputSplits this data source has processed (if the operator is a data source)
flink.task.Shuffle.Netty.Input.Buffers.inPoolUsage
(gauge)
An estimate of the input buffers usage
flink.task.Shuffle.Netty.Input.Buffers.inputQueueLength
(gauge)
The number of queued input buffers
Shown as buffer
flink.task.Shuffle.Netty.Input.numBuffersInLocal
(count)
The total number of network buffers this task has read from a local source
Shown as buffer
flink.task.Shuffle.Netty.Input.numBuffersInLocalPerSecond
(gauge)
The number of network buffers this task reads from a local source per second
flink.task.Shuffle.Netty.Input.numBuffersInRemote
(count)
The total number of network buffers this task has read from a remote source
Shown as buffer
flink.task.Shuffle.Netty.Input.numBuffersInRemotePerSecond
(gauge)
The number of network buffers this task reads from a remote source per second
Shown as buffer
flink.task.Shuffle.Netty.Input.numBytesInLocal
(count)
The total number of bytes this task has read from a local source
Shown as byte
flink.task.Shuffle.Netty.Input.numBytesInLocalPerSecond
(gauge)
The number of bytes this task reads from a local source per second
Shown as byte
flink.task.Shuffle.Netty.Input.numBytesInRemote
(count)
The total number of bytes this task has read from a remote source
Shown as byte
flink.task.Shuffle.Netty.Input.numBytesInRemotePerSecond
(gauge)
The number of bytes this task reads from a remote source per second
Shown as byte
flink.task.Shuffle.Netty.Output.Buffers.outPoolUsage
(gauge)
An estimate of the output buffers usage
flink.task.Shuffle.Netty.Output.Buffers.outputQueueLength
(gauge)
The number of queued output buffers
Shown as buffer
flink.task.checkpointAlignmentTime
(gauge)
The time in nanoseconds that the last barrier alignment took to complete or how long the current alignment has taken so far
Shown as nanosecond
flink.task.currentInputWatermark
(gauge)
The last watermark this task has received. For tasks with 2 inputs this is the minimum of the last received watermarks
Shown as millisecond
flink.task.numBuffersOut
(count)
The total number of network buffers this task has emitted
Shown as buffer
flink.task.numBuffersOutPerSecond
(gauge)
The number of network buffers this task emits per second
Shown as buffer
flink.task.numBytesOut
(count)
The total number of bytes this task has emitted
Shown as byte
flink.task.numBytesOutPerSecond
(gauge)
The number of bytes this task emits per second
Shown as byte
flink.task.numLateRecordsDropped
(count)
The number of records this task has dropped due to arriving late
Shown as record
flink.task.numRecordsIn
(count)
The total number of records this task has received
Shown as record
flink.task.numRecordsInPerSecond
(gauge)
The number of records this task receives per second
Shown as record
flink.task.numRecordsOut
(count)
The total number of records this task has emitted
Shown as record
flink.task.numRecordsOutPerSec
(gauge)
The total number of records this task has emitted per second
Shown as record
flink.taskmanager.Status.JVM.CPU.Load
(gauge)
The recent CPU usage of the JVM in the taskmanager
Shown as percent
flink.taskmanager.Status.JVM.CPU.Time
(gauge)
The CPU time used by the JVM in the taskmanager
Shown as second
flink.taskmanager.Status.JVM.ClassLoader.ClassesLoaded
(count)
The total number of classes loaded since the start of the JVM in the taskmanager
flink.taskmanager.Status.JVM.ClassLoader.ClassesUnloaded
(count)
The total number of classes unloaded since the start of the JVM in the taskmanager
flink.taskmanager.Status.JVM.Memory.Direct.Count
(gauge)
The number of buffers in the direct buffer pool in the taskmanager
Shown as buffer
flink.taskmanager.Status.JVM.Memory.Direct.MemoryUsed
(gauge)
The amount of memory used by the JVM for the direct buffer pool in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.Direct.TotalCapacity
(count)
The total capacity of all buffers in the direct buffer pool in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.Heap.Committed
(gauge)
The amount of heap memory guaranteed to be available to the JVM in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.Heap.Max
(gauge)
The maximum amount of heap memory that can be used for memory management in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.Heap.Used
(gauge)
The amount of heap memory currently used in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.Mapped.Count
(gauge)
The number of buffers in the mapped buffer pool in the taskmanager
flink.taskmanager.Status.JVM.Memory.Mapped.MemoryUsed
(gauge)
The amount of memory used by the JVM for the mapped buffer pool in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.Mapped.TotalCapacity
(count)
The total capacity of all buffers in the mapped buffer pool in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.NonHeap.Committed
(gauge)
The amount of non-heap memory guaranteed to be available to the JVM in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.NonHeap.Max
(gauge)
The maximum amount of non-heap memory that can be used for memory management in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Memory.NonHeap.Used
(gauge)
The amount of non-heap memory currently used in the taskmanager
Shown as byte
flink.taskmanager.Status.JVM.Threads.Count
(count)
The total number of live threads in the taskmanager
Shown as thread
flink.taskmanager.Status.Shuffle.Netty.AvailableMemorySegments
(gauge)
The number of unused memory segments in the taskmanager
flink.taskmanager.Status.Shuffle.Netty.TotalMemorySegments
(gauge)
The number of allocated memory segments in the taskmanager

Checks de servicio

Flink no incluye checks de servicio.

Eventos

Flink no incluye eventos.

Solucionar problemas

¿Necesitas ayuda? Ponte en contacto con el servicio de asistencia de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers