SNMP commonly used and compatible OIDs

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

For Cisco devices, you can use the command:

show snmp-server oidlist

To see the available OIDs for your system, login to your Cisco account and search in the object navigator: http://tools.cisco.com/Support/SNMP/do/BrowseOID.do?local=en

Linux OIDs (these tend to work for network devices like F5 too)

Statistics

CPU

  • 1 minute Load: .1.3.6.1.4.1.2021.10.1.3.1
  • 5 minute Load: .1.3.6.1.4.1.2021.10.1.3.2
  • 15 minute Load: .1.3.6.1.4.1.2021.10.1.3.3
  • percentage of user CPU time: .1.3.6.1.4.1.2021.11.9.0
  • raw user cpu time: .1.3.6.1.4.1.2021.11.50.0
  • percentages of system CPU time: .1.3.6.1.4.1.2021.11.10.0
  • raw system cpu time: .1.3.6.1.4.1.2021.11.52.0
  • percentages of idle CPU time: .1.3.6.1.4.1.2021.11.11.0
  • raw idle cpu time: .1.3.6.1.4.1.2021.11.53.0
  • raw nice cpu time: .1.3.6.1.4.1.2021.11.51.0

Memory

  • Total Swap Size: .1.3.6.1.4.1.2021.4.3.0
  • Available Swap Space: .1.3.6.1.4.1.2021.4.4.0
  • Total RAM in machine: .1.3.6.1.4.1.2021.4.5.0
  • Total RAM used: .1.3.6.1.4.1.2021.4.6.0
  • Total RAM Free: .1.3.6.1.4.1.2021.4.11.0
  • Total RAM Shared: .1.3.6.1.4.1.2021.4.13.0
  • Total RAM Buffered: .1.3.6.1.4.1.2021.4.14.0
  • Total Cached Memory: .1.3.6.1.4.1.2021.4.15.0

Disk

  • Path where the disk is mounted: .1.3.6.1.4.1.2021.9.1.2.1
  • Path of the device for the partition: .1.3.6.1.4.1.2021.9.1.3.1
  • Total size of the disk/partion (kBytes): .1.3.6.1.4.1.2021.9.1.6.1
  • Available space on the disk: .1.3.6.1.4.1.2021.9.1.7.1
  • Used space on the disk: .1.3.6.1.4.1.2021.9.1.8.1
  • Percentage of space used on disk: .1.3.6.1.4.1.2021.9.1.9.1
  • Percentage of inodes used on disk: .1.3.6.1.4.1.2021.9.1.10.1

Uptime

  • System Uptime: .1.3.6.1.2.1.1.3.0
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers