Supported OS Linux Mac OS Windows

Versión de la integración9.0.1
This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

MongoDB Dashboard

Overview

Connect MongoDB to Datadog in order to:

  • Visualize key MongoDB metrics.
  • Correlate MongoDB performance with the rest of your applications.

You can also create your own metrics using custom find, count and aggregate queries.

Enable Database Monitoring (DBM) for enhanced insights into query performance and database health. In addition to the standard integration, Datadog DBM provides live and historical query snapshots, slow query metrics, database load, operation execution plans, and collections insights.

Note: MongoDB v3.0+ is required for this integration. Integration of MongoDB Atlas with Datadog is only available on M10+ clusters. This integration also supports Alibaba ApsaraDB and Amazon DocumentDB Instance-Based clusters. DocumentDB Elastic clusters are not supported because they only expose the cluster (mongos) endpoints.

Setup

This page describes the standard MongoDB Agent integration. If you are looking for the Database Monitoring product for MongoDB, see Datadog Database Monitoring.

Installation

The MongoDB check is included in the Datadog Agent package. No additional installation is necessary.

Architecture

Note: To install Database Monitoring for MongoDB, select your hosting solution in the Database Monitoring documentation for instructions.

Most low-level metrics (uptime, storage size etc.) need to be collected on every mongod node. Other higher-level metrics (collection/index statistics etc.) should be collected only once. For these reasons the way you configure the Agents depends on how your mongo cluster is deployed.

Standalone

To configure this integration for a single node MongoDB deployment:

Prepare MongoDB

In a Mongo shell, create a read-only user for the Datadog Agent in the admin database:

# Authenticate as the admin user.
use admin
db.auth("admin", "<YOUR_MONGODB_ADMIN_PASSWORD>")

# Create the user for the Datadog Agent.
db.createUser({
  "user": "datadog",
  "pwd": "<UNIQUEPASSWORD>",
  "roles": [
    { role: "read", db: "admin" },
    { role: "clusterMonitor", db: "admin" },
    { role: "read", db: "local" },
    # Grant additional read-only access to the database you want to collect collection/index statistics from.
    { role: "read", db: "mydb" },
    { role: "read", db: "myanotherdb" },
    # Alternatively, grant read-only access to all databases.
    { role: "readAnyDatabase", db: "admin" }
  ]
})
Configure the agents

You only need a single agent, preferably running on the same node, to collect all the available mongo metrics. See below for configuration options.

Replica set

To configure this integration for a MongoDB replica set:

Prepare MongoDB

In a Mongo shell, authenticate to the primary and create a read-only user for the Datadog Agent in the admin database:

# Authenticate as the admin user.
use admin
db.auth("admin", "<YOUR_MONGODB_ADMIN_PASSWORD>")

# Create the user for the Datadog Agent.
db.createUser({
  "user": "datadog",
  "pwd": "<UNIQUEPASSWORD>",
  "roles": [
    { role: "read", db: "admin" },
    { role: "clusterMonitor", db: "admin" },
    { role: "read", db: "local" },
    # Grant additional read-only access to the database you want to collect collection/index statistics from.
    { role: "read", db: "mydb" },
    { role: "read", db: "myanotherdb" },
    # Alternatively, grant read-only access to all databases.
    { role: "readAnyDatabase", db: "admin" }
  ]
})
Configure the agents

Install the Datadog Agent on each host in the MongoDB replica set and configure the Agent to connect to the replica on that host (localhost). Running an Agent on each host results in lower latency and execution times, and ensures that data is still connected in the event a host fails.

For example, on the primary node:

init_config:
instances:
  - hosts:
      - mongo-primary:27017

On the secondary node:

init_config:
instances:
  - hosts:
      - mongo-secondary:27017

On the tertiary node:

init_config:
instances:
  - hosts:
      - mongo-tertiary:27017

Sharding

To configure this integration for a MongoDB sharded cluster:

Prepare MongoDB

For each shard in your cluster, connect to the primary of the replica set and create a local read-only user for the Datadog Agent in the admin database:

# Authenticate as the admin user.
use admin
db.auth("admin", "<YOUR_MONGODB_ADMIN_PASSWORD>")

# Create the user for the Datadog Agent.
db.createUser({
  "user": "datadog",
  "pwd": "<UNIQUEPASSWORD>",
  "roles": [
    { role: "read", db: "admin" },
    { role: "clusterMonitor", db: "admin" },
    { role: "read", db: "local" }
  ]
})

Then create the same user from a mongos proxy. This action creates the local user in the config servers and allows direct connection.

Configure the Agents
  1. Configure one Agent for each member of each shard.
  2. Configure one Agent for each member of the config servers.
  3. Configure one extra Agent to connect to the cluster through a mongos proxy. This mongos proxy can be a new one dedicated to monitoring purposes, or an existing mongos proxy.

Note: Monitoring of arbiter nodes is not supported (see the MongoDB Replica Set Arbiter for more details). However, any status change of an arbiter node is reported by the Agent connected to the primary.

Configuration

Follow the instructions below to configure this check for an Agent running on a host. For containerized environments, see the Docker, Kubernetes, or ECS sections.

Host

To configure this check for an Agent running on a host:

Metric collection
  1. Edit the mongo.d/conf.yaml file in the conf.d folder at the root of your Agent’s configuration directory. See the sample mongo.d/conf.yaml for all available configuration options.

    init_config:
    
    instances:
        ## @param hosts - list of strings - required
        ## Hosts to collect metrics from, as is appropriate for your deployment topology.
        ## E.g. for a standalone deployment, specify the hostname and port of the mongod instance.
        ## For replica sets or sharded clusters, see instructions in the sample conf.yaml.
        ## Only specify multiple hosts when connecting through mongos
        #
      - hosts:
          - <HOST>:<PORT>
    
        ## @param username - string - optional
        ## The username to use for authentication.
        #
        username: datadog
    
        ## @param password - string - optional
        ## The password to use for authentication.
        #
        password: <UNIQUEPASSWORD>
    
        ## @param database - string - optional
        ## The database to collect metrics from.
        #
        database: <DATABASE>
    
        ## @param options - mapping - optional
        ## Connection options. For a complete list, see:
        ## https://docs.mongodb.com/manual/reference/connection-string/#connections-connection-options
        #
        options:
          authSource: admin
    
  2. Restart the Agent.

Database Autodiscovery

Starting from Datadog Agent v7.56, you can enable database autodiscovery to automatically collect metrics from all your databases on the MongoDB instance. Please note that database autodiscovery is disabled by default. Read access to the autodiscovered databases is required to collect metrics from them. To enable it, add the following configuration to your mongo.d/conf.yaml file:

   init_config:

   instances:
       ## @param hosts - list of strings - required
       ## Hosts to collect metrics from, as is appropriate for your deployment topology.
       ## E.g. for a standalone deployment, specify the hostname and port of the mongod instance.
       ## For replica sets or sharded clusters, see instructions in the sample conf.yaml.
       ## Only specify multiple hosts when connecting through mongos
       #
     - hosts:
         - <HOST>:<PORT>

       ## @param username - string - optional
       ## The username to use for authentication.
       #
       username: datadog

       ## @param password - string - optional
       ## The password to use for authentication.
       #
       password: <UNIQUE_PASSWORD>

       ## @param options - mapping - optional
       ## Connection options. For a complete list, see:
       ## https://docs.mongodb.com/manual/reference/connection-string/#connections-connection-options
       #
       options:
         authSource: admin

       ## @param database_autodiscovery - mapping - optional
       ## Enable database autodiscovery to automatically collect metrics from all your MongoDB databases.
       #
       database_autodiscovery:
         ## @param enabled - boolean - required
         ## Enable database autodiscovery.
         #
         enabled: true

         ## @param include - list of strings - optional
         ## List of databases to include in the autodiscovery. Use regular expressions to match multiple databases.
         ## For example, to include all databases starting with "mydb", use "^mydb.*".
         ## By default, include is set to ".*" and all databases are included.
         #
         include:
            - "^mydb.*"

         ## @param exclude - list of strings - optional
         ## List of databases to exclude from the autodiscovery. Use regular expressions to match multiple databases.
         ## For example, to exclude all databases starting with "mydb", use "^mydb.*".
         ## When the exclude list conflicts with include list, the exclude list takes precedence.
         #
         exclude:
            - "^mydb2.*"
            - "admin$"

         ## @param max_databases - integer - optional
         ## Maximum number of databases to collect metrics from. The default value is 100.
         #
         max_databases: 100

         ## @param refresh_interval - integer - optional
         ## Interval in seconds to refresh the list of databases. The default value is 600 seconds.
         #
         refresh_interval: 600
  1. Restart the Agent.
Trace collection

Datadog APM integrates with Mongo to see the traces across your distributed system. Trace collection is enabled by default in the Datadog Agent v6+. To start collecting traces:

  1. Enable trace collection in Datadog.
  2. Instrument your application that makes requests to Mongo.
Log collection

Available for Agent versions >6.0

  1. Collecting logs is disabled by default in the Datadog Agent, enable it in your datadog.yaml file:

    logs_enabled: true
    
  2. Add this configuration block to your mongo.d/conf.yaml file to start collecting your MongoDB logs:

    logs:
      - type: file
        path: /var/log/mongodb/mongodb.log
        service: mongo
        source: mongodb
    

    Change the service and path parameter values and configure them for your environment. See the sample mongo.yaml for all available configuration options

  3. Restart the Agent.

Docker

To configure this check for an Agent running on a container:

Metric collection

Set Autodiscovery Integrations Templates as Docker labels on your application container:

LABEL "com.datadoghq.ad.check_names"='["mongo"]'
LABEL "com.datadoghq.ad.init_configs"='[{}]'
LABEL "com.datadoghq.ad.instances"='[{"hosts": ["%%host%%:%%port%%"], "username": "datadog", "password" : "<UNIQUEPASSWORD>", "database": "<DATABASE>"}]'
Log collection

Collecting logs is disabled by default in the Datadog Agent. To enable it, see Docker Log Collection.

Then, set Log Integrations as Docker labels:

LABEL "com.datadoghq.ad.logs"='[{"source":"mongodb","service":"<SERVICE_NAME>"}]'
Trace collection

APM for containerized apps is supported on Agent v6+ but requires extra configuration to begin collecting traces.

Required environment variables on the Agent container:

ParameterValue
<DD_API_KEY>api_key
<DD_APM_ENABLED>true
<DD_APM_NON_LOCAL_TRAFFIC>true

See Tracing Docker Applications for a complete list of available environment variables and configuration.

Then, instrument your application container and set DD_AGENT_HOST to the name of your Agent container.

Kubernetes

To configure this check for an Agent running on Kubernetes:

Metric collection

Set Autodiscovery Integrations Templates as pod annotations on your application container. Aside from this, templates can also be configure with a file, configmap, or key-value store.

Annotations v1 (for Datadog Agent < v7.36)

apiVersion: v1
kind: Pod
metadata:
  name: mongo
  annotations:
    ad.datadoghq.com/mongo.check_names: '["mongo"]'
    ad.datadoghq.com/mongo.init_configs: '[{}]'
    ad.datadoghq.com/mongo.instances: |
      [
        {
          "hosts": ["%%host%%:%%port%%"],
          "username": "datadog",
          "password": "<UNIQUEPASSWORD>",
          "database": "<DATABASE>"
        }
      ]      
spec:
  containers:
    - name: mongo

Annotations v2 (for Datadog Agent v7.36+)

apiVersion: v1
kind: Pod
metadata:
  name: mongo
  annotations:
    ad.datadoghq.com/mongo.checks: |
      {
        "mongo": {
          "init_config": {},
          "instances": [
            {
              "hosts": ["%%host%%:%%port%%"],
              "username": "datadog",
              "password": "<UNIQUEPASSWORD>",
              "database": "<DATABASE>"
            }
          ]
        }
      }      
spec:
  containers:
    - name: mongo
Log collection

Collecting logs is disabled by default in the Datadog Agent. To enable it, see Kubernetes Log Collection.

Then, set Log Integrations as pod annotations. This can also be configured with a file, a configmap, or a key-value store.

Annotations v1/v2

apiVersion: v1
kind: Pod
metadata:
  name: mongo
  annotations:
    ad.datadoghq.com/mongo.logs: '[{"source":"mongodb","service":"<SERVICE_NAME>"}]'
spec:
  containers:
    - name: mongo
Trace collection

APM for containerized apps is supported on hosts running Agent v6+ but requires extra configuration to begin collecting traces.

Required environment variables on the Agent container:

ParameterValue
<DD_API_KEY>api_key
<DD_APM_ENABLED>true
<DD_APM_NON_LOCAL_TRAFFIC>true

See Tracing Kubernetes Applications and the Kubernetes DaemonSet Setup for a complete list of available environment variables and configuration.

Then, instrument your application container and set DD_AGENT_HOST to the name of your Agent container.

ECS

To configure this check for an Agent running on ECS:

Metric collection

Set Autodiscovery Integrations Templates as Docker labels on your application container:

{
  "containerDefinitions": [{
    "name": "mongo",
    "image": "mongo:latest",
    "dockerLabels": {
      "com.datadoghq.ad.check_names": "[\"mongo\"]",
      "com.datadoghq.ad.init_configs": "[{}]",
      "com.datadoghq.ad.instances": "[{\"hosts\": [\"%%host%%:%%port%%\"], \"username\": \"datadog\", \"password\": \"<UNIQUEPASSWORD>\", \"database\": \"<DATABASE>\"}]"
    }
  }]
}
Log collection

Available for Agent versions >6.0

Collecting logs is disabled by default in the Datadog Agent. To enable it, see ECS Log Collection.

Then, set Log Integrations as Docker labels:

{
  "containerDefinitions": [{
    "name": "mongo",
    "image": "mongo:latest",
    "dockerLabels": {
      "com.datadoghq.ad.logs": "[{\"source\":\"mongodb\",\"service\":\"<SERVICE_NAME>\"}]"
    }
  }]
}
Trace collection

APM for containerized apps is supported on Agent v6+ but requires extra configuration to begin collecting traces.

Required environment variables on the Agent container:

ParameterValue
<DD_API_KEY>api_key
<DD_APM_ENABLED>true
<DD_APM_NON_LOCAL_TRAFFIC>true

See Tracing Docker Applications for a complete list of available environment variables and configuration.

Then, instrument your application container and set DD_AGENT_HOST to the EC2 private IP address.

Validation

Run the Agent’s status subcommand and look for mongo under the Checks section.

Data Collected

Metrics

mongodb.asserts.msgps
(gauge)
Number of message assertions raised per second.
Shown as assertion
mongodb.asserts.regularps
(gauge)
Number of regular assertions raised per second.
Shown as assertion
mongodb.asserts.rolloversps
(gauge)
Number of times that the rollover counters roll over per second. The counters rollover to zero every 2^30 assertions.
Shown as assertion
mongodb.asserts.userps
(gauge)
Number of user assertions raised per second.
Shown as assertion
mongodb.asserts.warningps
(gauge)
Number of warnings raised per second.
Shown as assertion
mongodb.backgroundflushing.average_ms
(gauge)
Average time for each flush to disk. (deprecated in MongoDB 4.0)
Shown as millisecond
mongodb.backgroundflushing.flushesps
(gauge)
Number of times the database has flushed all writes to disk. (deprecated in MongoDB 4.0)
Shown as flush
mongodb.backgroundflushing.last_ms
(gauge)
Amount of time that the last flush operation took to complete. (deprecated in MongoDB 4.0)
Shown as millisecond
mongodb.backgroundflushing.total_ms
(gauge)
Total number of time that the mongod processes have spent writing (i.e. flushing) data to disk. (deprecated in MongoDB 4.0)
Shown as millisecond
mongodb.chunks.jumbo
(gauge)
Total number of 'jumbo' chunks in the mongo cluster.
mongodb.chunks.total
(gauge)
Total number of chunks in the mongo cluster.
mongodb.collection.avgobjsize
(gauge)
The size of the average object in the collection in bytes.
Shown as byte
mongodb.collection.capped
(gauge)
Whether or not the collection is capped.
Shown as record
mongodb.collection.collectionscans.nontailable
(gauge)
Number of times the collection was scanned without tailable cursor (deprecated).
Shown as scan
mongodb.collection.collectionscans.nontailableps
(gauge)
Number of times the collection was scanned without tailable cursor per second.
Shown as scan
mongodb.collection.collectionscans.total
(gauge)
Total number of times the collection was scanned (deprecated).
Shown as scan
mongodb.collection.collectionscans.totalps
(gauge)
Total number of times the collection was scanned per second.
Shown as scan
mongodb.collection.commands.latency
(gauge)
Total latency for commands on the collection.
Shown as microsecond
mongodb.collection.commands.latency.avg
(gauge)
Average latency for commands on the collection.
Shown as microsecond
mongodb.collection.commands.opsps
(gauge)
Number of command operations per second on the collection.
Shown as operation
mongodb.collection.count
(gauge)
Total number of objects in the collection.
Shown as item
mongodb.collection.indexes.accesses.ops
(gauge)
Number of time the index was used.
Shown as event
mongodb.collection.indexes.accesses.opsps
(gauge)
Number of time the index was used per second.
Shown as event
mongodb.collection.indexsizes
(gauge)
Size of index in bytes.
Shown as byte
mongodb.collection.max
(gauge)
Maximum number of documents in a capped collection.
Shown as document
mongodb.collection.maxsize
(gauge)
Maximum size of a capped collection in bytes.
Shown as byte
mongodb.collection.nindexes
(gauge)
Total number of indices on the collection.
Shown as index
mongodb.collection.reads.latency
(gauge)
Total latency for read operations on the collection.
Shown as microsecond
mongodb.collection.reads.latency.avg
(gauge)
Average latency for read operations on the collection.
Shown as microsecond
mongodb.collection.reads.opsps
(gauge)
Number of read operations per second on the collection.
Shown as operation
mongodb.collection.size
(gauge)
The total uncompressed size in memory of all records in a collection. The size does not include the size of any indexes associated with the collection.
Shown as byte
mongodb.collection.storagesize
(gauge)
Total storage space allocated to this collection for document storage.
Shown as byte
mongodb.collection.totalindexsize
(gauge)
Total disk space used by all indexes created on this collection.
Shown as byte
mongodb.collection.transactions.latency
(gauge)
Total latency for transactions on the collection.
Shown as microsecond
mongodb.collection.transactions.latency.avg
(gauge)
Average latency for transactions on the collection.
Shown as microsecond
mongodb.collection.transactions.opsps
(gauge)
Number of transaction operations per second on the collection.
Shown as operation
mongodb.collection.writes.latency
(gauge)
Total latency for write operations on the collection.
Shown as microsecond
mongodb.collection.writes.latency.avg
(gauge)
Average latency for write operations on the collection.
Shown as microsecond
mongodb.collection.writes.opsps
(gauge)
Number of write operations per second on the collection.
Shown as operation
mongodb.connection_pool.numascopedconnections
(gauge)
Number of active and stored outgoing scoped synchronous connections from the current mongos instance to other members of the sharded cluster or replica set.
Shown as connection
mongodb.connection_pool.numclientconnections
(gauge)
Reports the number of active and stored outgoing synchronous connections from the current mongos instance to other members of the sharded cluster or replica set.
Shown as connection
mongodb.connection_pool.totalavailable
(gauge)
Reports the total number of available outgoing connections from the current mongos instance to other members of the sharded cluster or replica set.
Shown as connection
mongodb.connection_pool.totalcreatedps
(gauge)
Reports the total number of outgoing connections created per second by the current mongos instance to other members of the sharded cluster or replica set.
Shown as connection
mongodb.connection_pool.totalinuse
(gauge)
Reports the total number of outgoing connections from the current mongod/mongos instance to other members of the sharded cluster or replica set that are currently in use.
Shown as connection
mongodb.connection_pool.totalrefreshing
(gauge)
Reports the total number of outgoing connections from the current mongos instance to other members of the sharded cluster or replica set that are currently being refreshed.
Shown as connection
mongodb.connections.available
(gauge)
Number of unused available incoming connections the database can provide.
Shown as connection
mongodb.connections.current
(gauge)
Number of connections to the database server from clients.
Shown as connection
mongodb.connections.totalcreated
(gauge)
Total number of connections created.
Shown as connection
mongodb.cursors.timedout
(gauge)
Total number of cursors that have timed out since the server process started.
Shown as cursor
mongodb.cursors.totalopen
(gauge)
Number of cursors that MongoDB is maintaining for clients
Shown as cursor
mongodb.dbs
(gauge)
Total number of existing databases
Shown as item
mongodb.dur.commits
(gauge)
Number of transactions written to the journal during the last journal group commit interval.
Shown as transaction
mongodb.dur.commitsinwritelock
(gauge)
Count of the commits that occurred while a write lock was held.
Shown as commit
mongodb.dur.compression
(gauge)
Compression ratio of the data written to the journal.
Shown as fraction
mongodb.dur.earlycommits
(gauge)
Number of times MongoDB requested a commit before the scheduled journal group commit interval.
Shown as commit
mongodb.dur.journaledmb
(gauge)
Amount of data written to journal during the last journal group commit interval.
Shown as mebibyte
mongodb.dur.timems.commits
(gauge)
Amount of time spent for commits.
Shown as millisecond
mongodb.dur.timems.commitsinwritelock
(gauge)
Amount of time spent for commits that occurred while a write lock was held.
Shown as millisecond
mongodb.dur.timems.dt
(gauge)
Amount of time over which MongoDB collected the dur.timeMS data.
Shown as millisecond
mongodb.dur.timems.preplogbuffer
(gauge)
Amount of time spent preparing to write to the journal.
Shown as millisecond
mongodb.dur.timems.remapprivateview
(gauge)
Amount of time spent remapping copy-on-write memory mapped views.
Shown as millisecond
mongodb.dur.timems.writetodatafiles
(gauge)
Amount of time spent writing to data files after journaling.
Shown as millisecond
mongodb.dur.timems.writetojournal
(gauge)
Amount of time spent writing to the journal
Shown as millisecond
mongodb.dur.writetodatafilesmb
(gauge)
Amount of data written from journal to the data files during the last journal group commit interval.
Shown as mebibyte
mongodb.extra_info.heap_usage_bytesps
(gauge)
The total size in bytes of heap space used by the database process. Available on Unix/Linux systems only.
Shown as byte
mongodb.extra_info.page_faultsps
(gauge)
Number of page faults per second that require disk operations.
Shown as fault
mongodb.fsynclocked
(gauge)
Metric representing the fsynclock state of a database. 1 if it's locked and 0 if it's not.
mongodb.globallock.activeclients.readers
(gauge)
Count of the active client connections performing read operations.
Shown as connection
mongodb.globallock.activeclients.total
(gauge)
Total number of active client connections to the database.
Shown as connection
mongodb.globallock.activeclients.writers
(gauge)
Count of active client connections performing write operations.
Shown as connection
mongodb.globallock.currentqueue.readers
(gauge)
Number of operations that are currently queued and waiting for the read lock.
Shown as operation
mongodb.globallock.currentqueue.total
(gauge)
Total number of operations queued waiting for the lock.
Shown as operation
mongodb.globallock.currentqueue.writers
(gauge)
Number of operations that are currently queued and waiting for the write lock.
Shown as operation
mongodb.globallock.locktime
(gauge)
Time since the database last started that the globalLock has been held.
Shown as millisecond
mongodb.globallock.ratio
(gauge)
Ratio of the time that the globalLock has been held to the total time since it was created.
Shown as fraction
mongodb.globallock.totaltime
(gauge)
Time since the database last started and created the global lock.
Shown as microsecond
mongodb.indexcounters.accessesps
(gauge)
Number of times that operations have accessed indexes per second.
Shown as event
mongodb.indexcounters.hitsps
(gauge)
Number of times per second that an index has been accessed and mongod is able to return the index from memory.
Shown as hit
mongodb.indexcounters.missesps
(gauge)
Number of times per second that an operation attempted to access an index that was not in memory.
Shown as miss
mongodb.indexcounters.missratio
(gauge)
Ratio of index hits to misses.
Shown as fraction
mongodb.indexcounters.resetsps
(gauge)
Number of times per second the index counters have been reset.
Shown as event
mongodb.locks.collection.acquirecount.exclusiveps
(gauge)
Number of times the collection lock type was acquired in the Exclusive (X) mode.
Shown as lock
mongodb.locks.collection.acquirecount.intent_exclusiveps
(gauge)
Number of times the collection lock type was acquired in the Intent Exclusive (IX) mode.
Shown as lock
mongodb.locks.collection.acquirecount.intent_sharedps
(gauge)
Number of times the collection lock type was acquired in the Intent Shared (IS) mode.
Shown as lock
mongodb.locks.collection.acquirecount.sharedps
(gauge)
Number of times the collection lock type was acquired in the Shared (S) mode.
Shown as lock
mongodb.locks.collection.acquirewaitcount.exclusiveps
(gauge)
Number of times the collection lock type acquisition in the Exclusive (X) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.collection.acquirewaitcount.sharedps
(gauge)
Number of times the collection lock type acquisition in the Shared (S) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.collection.timeacquiringmicros.exclusiveps
(gauge)
Wait time for the collection lock type acquisitions in the Exclusive (X) mode.
Shown as fraction
mongodb.locks.collection.timeacquiringmicros.sharedps
(gauge)
Wait time for the collection lock type acquisitions in the Shared (S) mode.
Shown as fraction
mongodb.locks.database.acquirecount.exclusiveps
(gauge)
Number of times the database lock type was acquired in the Exclusive (X) mode.
Shown as lock
mongodb.locks.database.acquirecount.intent_exclusiveps
(gauge)
Number of times the database lock type was acquired in the Intent Exclusive (IX) mode.
Shown as lock
mongodb.locks.database.acquirecount.intent_sharedps
(gauge)
Number of times the database lock type was acquired in the Intent Shared (IS) mode.
Shown as lock
mongodb.locks.database.acquirecount.sharedps
(gauge)
Number of times the database lock type was acquired in the Shared (S) mode.
Shown as lock
mongodb.locks.database.acquirewaitcount.exclusiveps
(gauge)
Number of times the database lock type acquisition in the Exclusive (X) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.database.acquirewaitcount.intent_exclusiveps
(gauge)
Number of times the database lock type acquisition in the Intent Exclusive (IX) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.database.acquirewaitcount.intent_sharedps
(gauge)
Number of times the database lock type acquisition in the Intent Shared (IS) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.database.acquirewaitcount.sharedps
(gauge)
Number of times the database lock type acquisition in the Shared (S) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.database.timeacquiringmicros.exclusiveps
(gauge)
Wait time for the database lock type acquisitions in the Exclusive (X) mode.
Shown as fraction
mongodb.locks.database.timeacquiringmicros.intent_exclusiveps
(gauge)
Wait time for the database lock type acquisitions in the Intent Exclusive (IX) mode.
Shown as fraction
mongodb.locks.database.timeacquiringmicros.intent_sharedps
(gauge)
Wait time for the database lock type acquisitions in the Intent Shared (IS) mode.
Shown as fraction
mongodb.locks.database.timeacquiringmicros.sharedps
(gauge)
Wait time for the database lock type acquisitions in the Shared (S) mode.
Shown as fraction
mongodb.locks.global.acquirecount.exclusiveps
(gauge)
Number of times the global lock type was acquired in the Exclusive (X) mode.
Shown as lock
mongodb.locks.global.acquirecount.intent_exclusiveps
(gauge)
Number of times the global lock type was acquired in the Intent Exclusive (IX) mode.
Shown as lock
mongodb.locks.global.acquirecount.intent_sharedps
(gauge)
Number of times the global lock type was acquired in the Intent Shared (IS) mode.
Shown as lock
mongodb.locks.global.acquirecount.sharedps
(gauge)
Number of times the global lock type was acquired in the Shared (S) mode.
Shown as lock
mongodb.locks.global.acquirewaitcount.exclusiveps
(gauge)
Number of times the global lock type acquisition in the Exclusive (X) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.global.acquirewaitcount.intent_exclusiveps
(gauge)
Number of times the global lock type acquisition in the Intent Exclusive (IX) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.global.acquirewaitcount.intent_sharedps
(gauge)
Number of times the global lock type acquisition in the Intent Shared (IS) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.global.acquirewaitcount.sharedps
(gauge)
Number of times the global lock type acquisition in the Shared (S) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.global.timeacquiringmicros.exclusiveps
(gauge)
Wait time for the global lock type acquisitions in the Exclusive (X) mode.
Shown as fraction
mongodb.locks.global.timeacquiringmicros.intent_exclusiveps
(gauge)
Wait time for the global lock type acquisitions in the Intent Exclusive (IX) mode.
Shown as fraction
mongodb.locks.global.timeacquiringmicros.intent_sharedps
(gauge)
Wait time for the global lock type acquisitions in the Intent Shared (IS) mode.
Shown as fraction
mongodb.locks.global.timeacquiringmicros.sharedps
(gauge)
Wait time for the global lock type acquisitions in the Shared (S) mode.
Shown as fraction
mongodb.locks.metadata.acquirecount.exclusiveps
(gauge)
Number of times the metadata lock type was acquired in the Exclusive (X) mode.
Shown as lock
mongodb.locks.metadata.acquirecount.sharedps
(gauge)
Number of times the metadata lock type was acquired in the Shared (S) mode.
Shown as lock
mongodb.locks.mmapv1journal.acquirecount.intent_exclusiveps
(gauge)
Number of times the MMAPv1 storage engine lock type was acquired in the Intent Exclusive (IX) mode.
Shown as lock
mongodb.locks.mmapv1journal.acquirecount.intent_sharedps
(gauge)
Number of times the MMAPv1 storage engine lock type was acquired in the Intent Shared (IS) mode.
Shown as lock
mongodb.locks.mmapv1journal.acquirewaitcount.intent_exclusiveps
(gauge)
Number of times the MMAPv1 storage engine lock type acquisition in the Intent Exclusive (IX) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.mmapv1journal.acquirewaitcount.intent_sharedps
(gauge)
Number of times the MMAPv1 storage engine lock type acquisition in the Intent Shared (IS) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.mmapv1journal.timeacquiringmicros.intent_exclusiveps
(gauge)
Wait time for the MMAPv1 storage engine lock type acquisitions in the Intent Exclusive (IX) mode.
Shown as fraction
mongodb.locks.mmapv1journal.timeacquiringmicros.intent_sharedps
(gauge)
Wait time for the MMAPv1 storage engine lock type acquisitions in the Intent Shared (IS) mode.
Shown as fraction
mongodb.locks.oplog.acquirecount.intent_exclusiveps
(gauge)
Number of times the oplog lock type was acquired in the Intent Exclusive (IX) mode.
Shown as lock
mongodb.locks.oplog.acquirecount.sharedps
(gauge)
Number of times the oplog lock type was acquired in the Shared (S) mode.
Shown as lock
mongodb.locks.oplog.acquirewaitcount.intent_exclusiveps
(gauge)
Number of times the oplog lock type acquisition in the Intent Exclusive (IX) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.oplog.acquirewaitcount.sharedps
(gauge)
Number of times the oplog lock type acquisition in the Shared (S) mode encountered waits because the locks were held in a conflicting mode.
Shown as wait
mongodb.locks.oplog.timeacquiringmicros.intent_exclusiveps
(gauge)
Wait time for the oplog lock type acquisitions in the Intent Exclusive (IX) mode.
Shown as fraction
mongodb.locks.oplog.timeacquiringmicros.sharedps
(gauge)
Wait time for the oplog lock type acquisitions in the Shared (S) mode.
Shown as fraction
mongodb.mem.bits
(gauge)
Size of the in-memory storage engine.
Shown as mebibyte
mongodb.mem.mapped
(gauge)
Amount of mapped memory by the database.
Shown as mebibyte
mongodb.mem.mappedwithjournal
(gauge)
The amount of mapped memory, including the memory used for journaling.
Shown as mebibyte
mongodb.mem.resident
(gauge)
Amount of memory currently used by the database process.
Shown as mebibyte
mongodb.mem.virtual
(gauge)
Amount of virtual memory used by the mongod process.
Shown as mebibyte
mongodb.metrics.commands.count.failedps
(gauge)
Number of times count failed
Shown as command
mongodb.metrics.commands.count.total
(gauge)
Number of times count executed
Shown as command
mongodb.metrics.commands.createindexes.failedps
(gauge)
Number of times createIndexes failed
Shown as command
mongodb.metrics.commands.createindexes.total
(gauge)
Number of times createIndexes executed
Shown as command
mongodb.metrics.commands.delete.failedps
(gauge)
Number of times delete failed
Shown as command
mongodb.metrics.commands.delete.total
(gauge)
Number of times delete executed
Shown as command
mongodb.metrics.commands.eval.failedps
(gauge)
Number of times eval failed
Shown as command
mongodb.metrics.commands.eval.total
(gauge)
Number of times eval executed
Shown as command
mongodb.metrics.commands.findandmodify.failedps
(gauge)
Number of times findAndModify failed
Shown as command
mongodb.metrics.commands.findandmodify.total
(gauge)
Number of times findAndModify executed
Shown as command
mongodb.metrics.commands.insert.failedps
(gauge)
Number of times insert failed
Shown as command
mongodb.metrics.commands.insert.total
(gauge)
Number of times insert executed
Shown as command
mongodb.metrics.commands.update.failedps
(gauge)
Number of times update failed
Shown as command
mongodb.metrics.commands.update.total
(gauge)
Number of times update executed
Shown as command
mongodb.metrics.cursor.open.notimeout
(gauge)
Number of open cursors with the option DBQuery.Option.noTimeout set to prevent timeout after a period of inactivity.
Shown as cursor
mongodb.metrics.cursor.open.pinned
(gauge)
Number of pinned open cursors.
Shown as cursor
mongodb.metrics.cursor.open.total
(gauge)
Number of cursors that MongoDB is maintaining for clients.
Shown as cursor
mongodb.metrics.cursor.timedoutps
(gauge)
Number of cursors that time out, per second.
Shown as cursor
mongodb.metrics.document.deletedps
(gauge)
Number of documents deleted per second.
Shown as document
mongodb.metrics.document.insertedps
(gauge)
Number of documents inserted per second.
Shown as document
mongodb.metrics.document.returnedps
(gauge)
Number of documents returned by queries per second.
Shown as document
mongodb.metrics.document.updatedps
(gauge)
Number of documents updated per second.
Shown as document
mongodb.metrics.getlasterror.wtime.numps
(gauge)
Number of getLastError operations per second with a specified write concern (i.e. w) that wait for one or more members of a replica set to acknowledge the write operation.
Shown as operation
mongodb.metrics.getlasterror.wtime.totalmillisps
(gauge)
Fraction of time (ms/s) that the mongod has spent performing getLastError operations with write concern (i.e. w) that wait for one or more members of a replica set to acknowledge the write operation.
Shown as fraction
mongodb.metrics.getlasterror.wtimeoutsps
(gauge)
Number of times per second that write concern operations have timed out as a result of the wtimeout threshold to getLastError
Shown as event
mongodb.metrics.operation.fastmodps
(gauge)
Number of update operations per second that neither cause documents to grow nor require updates to the index.
Shown as operation
mongodb.metrics.operation.idhackps
(gauge)
Number of queries per second that contain the _id field.
Shown as query
mongodb.metrics.operation.scanandorderps
(gauge)
Number of queries per second that return sorted numbers that cannot perform the sort operation using an index.
Shown as query
mongodb.metrics.operation.writeconflictsps
(gauge)
Number of times per second that write concern operations has encounter a conflict.
Shown as event
mongodb.metrics.query.plancache.classic.hitsps
(gauge)
Number of times per second the query planner accesses the classic plan cache and finds a cached plan (requires MongoDB 7.0 and above).
Shown as operation
mongodb.metrics.query.plancache.classic.missesps
(gauge)
Number of times per second the query planner accesses the classic plan cache and does not find a cached plan (requires MongoDB 7.0 and above).
Shown as operation
mongodb.metrics.query.plancache.sbe.hitsps
(gauge)
Number of times per second the query planner accesses the slot-based execution engine plan cache and finds a cached plan (requires MongoDB 7.0 and above).
Shown as operation
mongodb.metrics.query.plancache.sbe.missesps
(gauge)
Number of times per second the query planner accesses the slot-based execution engine plan cache and does not find a cached plan (requires MongoDB 7.0 and above).
Shown as operation
mongodb.metrics.query.sort.spilltodiskps
(gauge)
The total number of writes per second to disk caused by sort stages (requires MongoDB 6.2 and above).
Shown as operation
mongodb.metrics.query.sort.totalbytessortedps
(gauge)
The total amount of sorted data in bytes per second (requires MongoDB 6.2 and above).
Shown as byte
mongodb.metrics.query.sort.totalkeyssortedps
(gauge)
The total number of keys used in sorts per second (requires MongoDB 6.2 and above).
Shown as key
mongodb.metrics.queryexecutor.scannedobjectsps
(gauge)
Number of documents scanned per second during queries and query-plan evaluation.
Shown as operation
mongodb.metrics.queryexecutor.scannedps
(gauge)
Number of index items scanned per second during queries and query-plan evaluation.
Shown as operation
mongodb.metrics.record.movesps
(gauge)
Number of times per second documents move within the on-disk representation of the MongoDB data set.
Shown as operation
mongodb.metrics.repl.apply.batches.numps
(gauge)
Number of batches applied across all databases per second.
Shown as operation
mongodb.metrics.repl.apply.batches.totalmillisps
(gauge)
Fraction of time (ms/s) the mongod has spent applying operations from the oplog.
Shown as fraction
mongodb.metrics.repl.apply.opsps
(gauge)
Number of oplog operations applied per second.
Shown as operation
mongodb.metrics.repl.buffer.count
(gauge)
Number of operations in the oplog buffer.
Shown as operation
mongodb.metrics.repl.buffer.maxsizebytes
(gauge)
Maximum size of the buffer.
Shown as byte
mongodb.metrics.repl.buffer.sizebytes
(gauge)
Current size of the contents of the oplog buffer.
Shown as byte
mongodb.metrics.repl.network.bytesps
(gauge)
Amount of data read from the replication sync source per second.
Shown as byte
mongodb.metrics.repl.network.getmores.numps
(gauge)
Number of getmore operations per second.
Shown as operation
mongodb.metrics.repl.network.getmores.totalmillisps
(gauge)
Fraction of time (ms/s) required to collect data from getmore operations.
Shown as fraction
mongodb.metrics.repl.network.opsps
(gauge)
Number of operations read from the replication source per second.
Shown as operation
mongodb.metrics.repl.network.readerscreatedps
(gauge)
Number of oplog query processes created per second.
Shown as process
mongodb.metrics.repl.preload.docs.numps
(gauge)
Number of documents loaded per second during the pre-fetch stage of replication.
Shown as document
mongodb.metrics.repl.preload.docs.totalmillisps
(gauge)
Fraction of time (ms/s) spent loading documents as part of the pre-fetch stage of replication.
Shown as fraction
mongodb.metrics.repl.preload.indexes.numps
(gauge)
Number of index entries loaded by members before updating documents as part of the pre-fetch stage of replication.
Shown as document
mongodb.metrics.repl.preload.indexes.totalmillisps
(gauge)
Fraction of time (ms/s) spent loading documents as part of the pre-fetch stage of replication.
Shown as fraction
mongodb.metrics.ttl.deleteddocumentsps
(gauge)
Number of documents deleted from collections with a ttl index per second.
Shown as document
mongodb.metrics.ttl.passesps
(gauge)
Number of times per second the background process removes documents from collections with a ttl index.
Shown as operation
mongodb.network.bytesinps
(gauge)
The number of bytes that reflects the amount of network traffic received by this database.
Shown as byte
mongodb.network.bytesoutps
(gauge)
The number of bytes that reflects the amount of network traffic sent from this database.
Shown as byte
mongodb.network.numrequestsps
(gauge)
Number of distinct requests that the server has received.
Shown as request
mongodb.opcounters.commandps
(gauge)
Total number of commands per second issued to the database.
Shown as command
mongodb.opcounters.deleteps
(gauge)
Number of delete operations per second.
Shown as operation
mongodb.opcounters.getmoreps
(gauge)
Number of getmore operations per second.
Shown as operation
mongodb.opcounters.insertps
(gauge)
Number of insert operations per second.
Shown as operation
mongodb.opcounters.queryps
(gauge)
Total number of queries per second.
Shown as query
mongodb.opcounters.updateps
(gauge)
Number of update operations per second.
Shown as operation
mongodb.opcountersrepl.commandps
(gauge)
Total number of replicated commands issued to the database per second.
Shown as command
mongodb.opcountersrepl.deleteps
(gauge)
Number of replicated delete operations per second.
Shown as operation
mongodb.opcountersrepl.getmoreps
(gauge)
Number of replicated getmore operations per second.
Shown as operation
mongodb.opcountersrepl.insertps
(gauge)
Number of replicated insert operations per second.
Shown as operation
mongodb.opcountersrepl.queryps
(gauge)
Total number of replicated queries per second.
Shown as query
mongodb.opcountersrepl.updateps
(gauge)
Number of replicated update operations per second.
Shown as operation
mongodb.oplatencies.commands.latency
(gauge)
Total combined latency for database commands.
Shown as microsecond
mongodb.oplatencies.commands.latency.avg
(gauge)
Average latency for database commands.
Shown as microsecond
mongodb.oplatencies.commands.latencyps
(gauge)
Total latency statistics for database commands per second (deprecated).
Shown as command
mongodb.oplatencies.reads.latency
(gauge)
Total combined latency for read requests.
Shown as microsecond
mongodb.oplatencies.reads.latency.avg
(gauge)
Average latency for read requests.
Shown as microsecond
mongodb.oplatencies.reads.latencyps
(gauge)
Total latency statistics for read requests per second (deprecated).
Shown as operation
mongodb.oplatencies.writes.latency
(gauge)
Total combined latency for write requests.
Shown as microsecond
mongodb.oplatencies.writes.latency.avg
(gauge)
Average latency for write requests.
Shown as microsecond
mongodb.oplatencies.writes.latencyps
(gauge)
Total latency statistics for write operations per second (deprecated).
Shown as operation
mongodb.oplog.logsizemb
(gauge)
Total size of the oplog.
Shown as mebibyte
mongodb.oplog.timediff
(gauge)
Oplog window: difference between the first and last operation in the oplog.
Shown as second
mongodb.oplog.usedsizemb
(gauge)
Total amount of space used by the oplog.
Shown as mebibyte
mongodb.replset.health
(gauge)
Member health value of the replica set: conveys if the member is up (i.e. 1) or down (i.e. 0).
mongodb.replset.optime_lag
(gauge)
Delay between a write operation on the primary and its copy to a secondary. Computed only on primary and tagged by 'member'.
Shown as second
mongodb.replset.replicationlag
(gauge)
Delay between a write operation on the primary and its copy to a secondary. Computed on each node and tagged by 'host', but may not be representative of cluster health. Negative values do not indicate that the secondary is ahead of the primary. To use a more up-to-date metric, use mongodb.replset.optime_lag instead.
Shown as second
mongodb.replset.state
(gauge)
State of a replica that reflects its disposition within the set.
mongodb.replset.votefraction
(gauge)
Fraction of votes a server will cast in a replica set election.
Shown as fraction
mongodb.replset.votes
(gauge)
The number of votes a server will cast in a replica set election.
Shown as item
mongodb.sessions.count
(gauge)
Number of active sessions for all users.
Shown as session
mongodb.sharded_data_distribution.num_orphaned_docs
(gauge)
Number of orphaned documents in the shard.
Shown as document
mongodb.sharded_data_distribution.num_owned_documents
(gauge)
Number of owned documents in the shard.
Shown as document
mongodb.sharded_data_distribution.orphaned_size_bytes
(gauge)
Size of orphaned documents in the shard.
Shown as byte
mongodb.sharded_data_distribution.owned_size_bytes
(gauge)
Size of owned documents in the shard.
Shown as byte
mongodb.stats.avgobjsize
(gauge)
The average size of each document in bytes.
Shown as byte
mongodb.stats.collections
(gauge)
Contains a count of the number of collections in that database.
mongodb.stats.datasize
(gauge)
Total size of the data held in this database including the padding factor.
Shown as byte
mongodb.stats.filesize
(gauge)
Total size of the data held in this database including the padding factor (only available with the mmapv1 storage engine).
Shown as byte
mongodb.stats.freestoragesize
(gauge)
Total amount of free space allocated to all collections in the database for document storage.
Shown as byte
mongodb.stats.fstotalsize
(gauge)
Total amount of all disk capacity on the filesystem where MongoDB stores data.
Shown as byte
mongodb.stats.fsusedsize
(gauge)
Total amount of all disk space in use on the filesystem where MongoDB stores data.
Shown as byte
mongodb.stats.indexes
(gauge)
Total number of indexes across all collections in the database.
Shown as index
mongodb.stats.indexfreestoragesize
(gauge)
Total amount of free disk space allocated to all indexes in the database.
Shown as byte
mongodb.stats.indexsize
(gauge)
Total size of all indexes created on this database.
Shown as byte
mongodb.stats.numextents
(gauge)
Contains a count of the number of extents in the database across all collections.
mongodb.stats.objects
(gauge)
Number of objects (documents) in the database across all collections.
Shown as object
mongodb.stats.storagesize
(gauge)
Total amount of space allocated to collections in this database for document storage.
Shown as byte
mongodb.stats.totalfreestoragesize
(gauge)
Total amount of free storage space allocated for both documents and indexes in all collections in the database.
Shown as byte
mongodb.stats.totalsize
(gauge)
Total amount of disk space allocated for both documents and indexes in all collections in the database. Includes used and free storage space.
Shown as byte
mongodb.stats.views
(gauge)
Contains a count of the number of views in the database.
mongodb.system.cpu.cores
(gauge)
The total number of available logical processor cores.
Shown as core
mongodb.system.cpu.percent
(gauge)
Total CPU usage percentage of the MongoDB process (only available on self-hosted MongoDB running on the same host as the Agent).
Shown as percent
mongodb.system.mem.limit
(gauge)
The system memory (RAM) usage limit. For example running in a container may impose memory limits that are lower than the total system memory.
Shown as megabyte
mongodb.system.mem.total
(gauge)
The total amount of system memory (RAM).
Shown as megabyte
mongodb.tcmalloc.generic.current_allocated_bytes
(gauge)
Number of bytes used by the application.
Shown as byte
mongodb.tcmalloc.generic.heap_size
(gauge)
Bytes of system memory reserved by TCMalloc.
Shown as byte
mongodb.tcmalloc.tcmalloc.aggressive_memory_decommit
(gauge)
Status of aggressive memory decommit mode.
mongodb.tcmalloc.tcmalloc.central_cache_free_bytes
(gauge)
Number of free bytes in the central cache.
Shown as byte
mongodb.tcmalloc.tcmalloc.current_total_thread_cache_bytes
(gauge)
Number of bytes used across all thread caches.
Shown as byte
mongodb.tcmalloc.tcmalloc.max_total_thread_cache_bytes
(gauge)
Upper limit on total number of bytes stored across all per-thread caches.
Shown as byte
mongodb.tcmalloc.tcmalloc.pageheap_free_bytes
(gauge)
Number of bytes in free mapped pages in page heap.
Shown as byte
mongodb.tcmalloc.tcmalloc.pageheap_unmapped_bytes
(gauge)
Number of bytes in free unmapped pages in page heap.
Shown as byte
mongodb.tcmalloc.tcmalloc.spinlock_total_delay_ns
(gauge)
Spinlock delay time.
Shown as nanosecond
mongodb.tcmalloc.tcmalloc.thread_cache_free_bytes
(gauge)
Number of free bytes in thread caches.
Shown as byte
mongodb.tcmalloc.tcmalloc.transfer_cache_free_bytes
(gauge)
Number of free bytes that are waiting to be transferred between the central cache and a thread cache.
Shown as byte
mongodb.uptime
(gauge)
Number of seconds that the mongos or mongod process has been active.
Shown as second
mongodb.usage.commands.count
(gauge)
Number of commands since server start (deprecated)
Shown as command
mongodb.usage.commands.countps
(gauge)
Number of commands per second
Shown as command
mongodb.usage.commands.time
(gauge)
Total time spent performing commands in microseconds
Shown as microsecond
mongodb.usage.getmore.count
(gauge)
Number of getmore since server start (deprecated)
Shown as fetch
mongodb.usage.getmore.countps
(gauge)
Number of getmore per second
Shown as fetch
mongodb.usage.getmore.time
(gauge)
Total time spent performing getmore in microseconds
Shown as microsecond
mongodb.usage.insert.count
(gauge)
Number of inserts since server start (deprecated)
Shown as commit
mongodb.usage.insert.countps
(gauge)
Number of inserts per second
Shown as commit
mongodb.usage.insert.time
(gauge)
Total time spent performing inserts in microseconds
Shown as microsecond
mongodb.usage.queries.count
(gauge)
Number of queries since server start (deprecated)
Shown as query
mongodb.usage.queries.countps
(gauge)
Number of queries per second
Shown as query
mongodb.usage.queries.time
(gauge)
Total time spent performing queries in microseconds
Shown as microsecond
mongodb.usage.readlock.count
(gauge)
Number of read locks since server start (deprecated)
Shown as lock
mongodb.usage.readlock.countps
(gauge)
Number of read locks per second
Shown as lock
mongodb.usage.readlock.time
(gauge)
Total time spent performing read locks in microseconds
Shown as microsecond
mongodb.usage.remove.count
(gauge)
Number of removes since server start (deprecated)
Shown as commit
mongodb.usage.remove.countps
(gauge)
Number of removes per second
Shown as commit
mongodb.usage.remove.time
(gauge)
Total time spent performing removes in microseconds
Shown as microsecond
mongodb.usage.total.count
(gauge)
Number of operations since server start (deprecated)
Shown as command
mongodb.usage.total.countps
(gauge)
Number of operations per second
Shown as command
mongodb.usage.total.time
(gauge)
Total time spent holding locks in microseconds
Shown as microsecond
mongodb.usage.update.count
(gauge)
Number of updates since server start (deprecated)
Shown as commit
mongodb.usage.update.countps
(gauge)
Number of updates per second
Shown as commit
mongodb.usage.update.time
(gauge)
Total time spent performing updates in microseconds
Shown as microsecond
mongodb.usage.writelock.count
(gauge)
Number of write locks since server start (deprecated)
Shown as lock
mongodb.usage.writelock.countps
(gauge)
Number of write locks per second
Shown as lock
mongodb.usage.writelock.time
(gauge)
Total time spent performing write locks in microseconds
Shown as microsecond
mongodb.wiredtiger.cache.bytes_currently_in_cache
(gauge)
Size of the data currently in cache.
Shown as byte
mongodb.wiredtiger.cache.bytes_read_into_cache
(gauge)
Number of bytes read into the cache.
Shown as byte
mongodb.wiredtiger.cache.bytes_written_from_cache
(gauge)
Number of bytes written from the cache.
Shown as byte
mongodb.wiredtiger.cache.failed_eviction_of_pages_exceeding_the_in_memory_maximumps
(gauge)
Number of failed eviction of pages that exceeded the in-memory maximum, per second.
Shown as page
mongodb.wiredtiger.cache.in_memory_page_splits
(gauge)
In-memory page splits.
Shown as split
mongodb.wiredtiger.cache.maximum_bytes_configured
(gauge)
Maximum cache size.
Shown as byte
mongodb.wiredtiger.cache.maximum_page_size_at_eviction
(gauge)
Maximum page size at eviction.
Shown as byte
mongodb.wiredtiger.cache.modified_pages_evicted
(gauge)
Number of pages, that have been modified, evicted from the cache.
Shown as page
mongodb.wiredtiger.cache.pages_currently_held_in_cache
(gauge)
Number of pages currently held in the cache.
Shown as page
mongodb.wiredtiger.cache.pages_evicted_by_application_threadsps
(gauge)
Number of page evicted by application threads per second.
Shown as page
mongodb.wiredtiger.cache.pages_evicted_exceeding_the_in_memory_maximumps
(gauge)
Number of pages evicted because they exceeded the cache in-memory maximum, per second.
Shown as page
mongodb.wiredtiger.cache.pages_read_into_cache
(gauge)
Number of pages read into the cache.
Shown as page
mongodb.wiredtiger.cache.pages_requested_from_cache
(gauge)
Number of pages requested from the cache.
Shown as page
mongodb.wiredtiger.cache.pages_written_from_cache
(gauge)
Number of pages writtent from the cache
Shown as page
mongodb.wiredtiger.cache.tracked_dirty_bytes_in_cache
(gauge)
Size of the dirty data in the cache.
Shown as byte
mongodb.wiredtiger.cache.unmodified_pages_evicted
(gauge)
Number of pages, that were not modified, evicted from the cache.
Shown as page
mongodb.wiredtiger.concurrenttransactions.read.available
(gauge)
Number of available read tickets (concurrent transactions) remaining.
Shown as ticket
mongodb.wiredtiger.concurrenttransactions.read.out
(gauge)
Number of read tickets (concurrent transactions) in use.
Shown as ticket
mongodb.wiredtiger.concurrenttransactions.read.totaltickets
(gauge)
Total number of read tickets (concurrent transactions) available.
Shown as ticket
mongodb.wiredtiger.concurrenttransactions.write.available
(gauge)
Number of available write tickets (concurrent transactions) remaining.
Shown as ticket
mongodb.wiredtiger.concurrenttransactions.write.out
(gauge)
Number of write tickets (concurrent transactions) in use.
Shown as ticket
mongodb.wiredtiger.concurrenttransactions.write.totaltickets
(gauge)
Total number of write tickets (concurrent transactions) available.
Shown as ticket

See the MongoDB 3.0 Manual for more detailed descriptions of some of these metrics.

Additional metrics

The following metrics are not collected by default. Use the additional_metrics parameter in your mongo.d/conf.yaml file to collect them:

metric prefixwhat to add to additional_metrics to collect it
mongodb.collectioncollection
mongodb.usage.commandstop
mongodb.usage.getmoretop
mongodb.usage.inserttop
mongodb.usage.queriestop
mongodb.usage.readLocktop
mongodb.usage.writeLocktop
mongodb.usage.removetop
mongodb.usage.totaltop
mongodb.usage.updatetop
mongodb.usage.writeLocktop
mongodb.tcmalloctcmalloc
mongodb.metrics.commandsmetrics.commands
mongodb.chunks.jumbojumbo_chunks
mongodb.chunks.totaljumbo_chunks
mongodb.sharded_data_distributionsharded_data_distribution

Events

Replication state changes:
This check emits an event each time a Mongo node has a change in its replication state.

Service Checks

mongodb.can_connect
Returns CRITICAL if the Agent is unable to connect to the monitored MongoDB instance. Returns OK otherwise.
Statuses: ok, critical

Troubleshooting

Need help? Contact Datadog support.

Further Reading

Additional helpful documentation, links, and articles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers