Redis Cloud

Supported OS Linux Windows Mac OS

Versión de la integración1.1.0
This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Overview

Redis is a fast, versatile data store that supports a variety of data structures, including strings, hashes, lists, sets, streams, and more. It also offers programmability, extensibility, persistence, clustering, and high availability. The community edition of Redis adds additional data models and capabilities, which include vector search, probabilistic data structures, JSON support, and full-text search.

The Redis Cloud integration is intended for use with Redis Cloud deployments of Redis software. It is not for use with Redis Enterprise installations. For Redis Enterprise, see the Datadog Redis Enterprise integration.

The integration provides metrics for three critical cluster components: databases, nodes, and shards, by using the Datadog Agent. This allows you to monitor database throughput, memory utilization, CPU usage, connection counts, replication health, and a variety of additional metrics within Datadog. You can use this information to understand the overall health of your Redis Cloud clusters, diagnose application performance issues, and prevent downtime.

For a full list of supported metrics, see the Metrics section below.

Setup

Installation

  1. Run the following command to install the Agent integration:
  • For the Datadog Agent v6:
    datadog-agent integration install -t datadog-redis_cloud==1.1.0
    
  • For the Datadog Agent v7:
    agent integration install -t datadog-redis_cloud==1.1.0
    
  1. Configure the integration by setting openmetrics_endpoint to your cluster’s master node. See Getting Started with Integrations for more information.
  2. Restart the Agent.

Configuration

Set the openmetrics_endpoint to point to your cluster. See the example. Leave tls_verify set to false.

There are two optional parameters: extra_metrics and excluded_metrics, as noted in the example configuration file.

The extra_metrics parameter takes a list of metric groups. The following groups are available: RDSC.REPLICATION,
RDSC.NODE, RDSC.BIGSTORE, RDSC.FLASH, and RDSC.SHARDREPL. The default metrics groups RDSC.DATABASE, RDSC.PROXY, RDSC.LISTENER and RDSC.SHARD are automatically inserted by the integration.

The exclude_metrics parameter takes a list of individual metrics to exclude, meaning that this information is not
passed on to Datadog. The individual metrics should be stripped of their prefix, meaning that ‘rdsc.bdb_up’
becomes ‘bdb_up’. The full list of metrics is available on the ‘Data Collected’ tab of the integration page, and in the Metrics section. The following extra groups use the associated prefixes, which can be used to search for individual metrics on the Data Collected page.

GroupPrefixNotes
RDSC.NODErdsc.node_This will return bigstore and flash metrics as well.
RDSC.DATABASErdsc.bdb_This will return replication metrics as well.
RDSC.SHARDrdsc.redis_This will return shard replication metrics as well.
RDSC.REPLICATIONrdsc.bdb_crdt_
RDSC.REPLICATIONrdsc.bdb_replicaof_
RDSC.SHARDREPLrdsc.redis_crdt_
RDSC.PROXYrdsc.dmcproxy_
RDSC.LISTENERrdsc.listener_
RDSC.BIGSTORErdsc.node_bigstore_
RDSC.FLASHrdsc.node_available_flashAll flash metrics are of the form: rdsc.node_*_flash.

Validation

  1. Ensure you can ping the machine, particularly in a cloud environment. Run wget --no-check-certificate <endpoint> or curl -k <endpoint> to ensure that you can receive metrics.

  2. Check the status of the Datadog Agent.

Data Collected

The Redis Cloud integration gathers all metrics for databases, nodes, and shards.

Metrics

rdsc.bdb_avg_latency
(gauge)
Average latency of operations on the DB (seconds); returned only when there is traffic
Shown as second
rdsc.bdb_avg_latency_max
(gauge)
Highest value of average latency of operations on the DB (seconds); returned only when there is traffic
Shown as second
rdsc.bdb_avg_read_latency
(gauge)
Average latency of read operations (seconds); returned only when there is traffic
Shown as second
rdsc.bdb_avg_read_latency_max
(gauge)
Highest value of average latency of read operations (seconds);returned only when there is traffic
Shown as second
rdsc.bdb_avg_write_latency
(gauge)
Average latency of write operations (seconds); returned only when there is traffic
Shown as second
rdsc.bdb_avg_write_latency_max
(gauge)
Highest value of average latency of write operations (seconds); returned only when there is traffic
Shown as second
rdsc.bdb_conns
(gauge)
Number of client connections to DB
Shown as connection
rdsc.bdb_egress_bytes
(gauge)
Rate of outgoing network traffic from the DB (bytes/sec)
Shown as second
rdsc.bdb_egress_bytes_max
(gauge)
Highest value of rate of outgoing network traffic from the DB (bytes/sec)
Shown as second
rdsc.bdb_evicted_objects
(gauge)
Rate of key evictions from DB (evictions/sec)
Shown as eviction
rdsc.bdb_evicted_objects_max
(gauge)
Highest value of rate of key evictions from DB (evictions/sec)
Shown as eviction
rdsc.bdb_expired_objects
(gauge)
Rate keys expired in DB (expirations/sec)
Shown as eviction
rdsc.bdb_expired_objects_max
(gauge)
eventHighest value of rate keys expired in DB (expirations/sec)
Shown as eviction
rdsc.bdb_fork_cpu_system
(gauge)
% cores utilization in system mode for all redis shard fork child processes of this database
Shown as cpu
rdsc.bdb_fork_cpu_system_max
(gauge)
Highest value of % cores utilization in system mode for all redis shard fork child processes of this database
Shown as cpu
rdsc.bdb_fork_cpu_user
(gauge)
% cores utilization in user mode for all redis shard fork child processes of this database
Shown as cpu
rdsc.bdb_fork_cpu_user_max
(gauge)
Highest value of % cores utilization in user mode for all redis shard fork child processes of this database
Shown as cpu
rdsc.bdb_ingress_bytes
(gauge)
Rate of incoming network traffic to DB (bytes/sec)
Shown as second
rdsc.bdb_ingress_bytes_max
(gauge)
Highest value of rate of incoming network traffic to DB (bytes/sec)
Shown as second
rdsc.bdb_instantaneous_ops_per_sec
(gauge)
Request rate handled by all shards of DB (ops/sec)
Shown as operation
rdsc.bdb_main_thread_cpu_system
(gauge)
% cores utilization in system mode for all redis shard main threas of this database
Shown as cpu
rdsc.bdb_main_thread_cpu_system_max
(gauge)
Highest value of % cores utilization in system mode for all redis shard main threas of this database
Shown as cpu
rdsc.bdb_main_thread_cpu_user
(gauge)
% cores utilization in user mode for all redis shard main threads of this database
Shown as cpu
rdsc.bdb_main_thread_cpu_user_max
(gauge)
Highest value of % cores utilization in user mode for all redis shard main threads of this database
Shown as cpu
rdsc.bdb_mem_frag_ratio
(gauge)
RAM fragmentation ratio (RSS / allocated RAM)
Shown as percent
rdsc.bdb_mem_size_lua
(gauge)
Redis lua scripting heap size (bytes)
Shown as byte
rdsc.bdb_memory_limit
(gauge)
Configured RAM limit for the database (bytes)
Shown as byte
rdsc.bdb_monitor_sessions_count
(gauge)
Number of client connected in monitor mode to the DB
Shown as session
rdsc.bdb_no_of_keys
(gauge)
Number of keys in DB
Shown as key
rdsc.bdb_other_req
(gauge)
Rate of other (non read/write) requests on DB (ops/sec)
Shown as request
rdsc.bdb_other_req_max
(gauge)
Highest value of rate of other (non read/write) requests on DB (ops/sec)
Shown as request
rdsc.bdb_other_res
(gauge)
Rate of other (non read/write) responses on DB (ops/sec)
Shown as response
rdsc.bdb_other_res_max
(gauge)
Highest value of rate of other (non read/write) responses on DB (ops/sec)
Shown as response
rdsc.bdb_pubsub_channels
(gauge)
Count the pub/sub channels with subscribed clients
Shown as key
rdsc.bdb_pubsub_channels_max
(gauge)
Highest value of count the pub/sub channels with subscribed clients
Shown as key
rdsc.bdb_pubsub_patterns
(gauge)
Count the pub/sub patterns with subscribed clients
Shown as key
rdsc.bdb_pubsub_patterns_max
(gauge)
Highest value of count the pub/sub patterns with subscribed clients
Shown as key
rdsc.bdb_read_hits
(gauge)
Rate of read operations accessing an existing key (ops/sec)
Shown as hit
rdsc.bdb_read_hits_max
(gauge)
Highest value of rate of read operations accessing an existing key (ops/sec)
Shown as hit
rdsc.bdb_read_misses
(gauge)
Rate of read operations accessing a non-existing key (ops/sec)
Shown as miss
rdsc.bdb_read_misses_max
(gauge)
Highest value of rate of read operations accessing a non-existing key (ops/sec)
Shown as miss
rdsc.bdb_read_req
(gauge)
Rate of read requests on DB (ops/sec)
Shown as request
rdsc.bdb_read_req_max
(gauge)
Highest value of rate of read requests on DB (ops/sec)
Shown as request
rdsc.bdb_read_res
(gauge)
Rate of read responses on DB (ops/sec)
Shown as response
rdsc.bdb_read_res_max
(gauge)
Highest value of rate of read responses on DB (ops/sec)
Shown as response
rdsc.bdb_shard_cpu_system
(gauge)
% cores utilization in system mode for all redis shard processes of this database
Shown as cpu
rdsc.bdb_shard_cpu_system_max
(gauge)
Highest value of % cores utilization in system mode for all redis shard processes of this database
Shown as cpu
rdsc.bdb_shard_cpu_user
(gauge)
% cores utilization in user mode for the redis shard process
Shown as cpu
rdsc.bdb_shard_cpu_user_max
(gauge)
Highest value of % cores utilization in user mode for the redis shard process
Shown as cpu
rdsc.bdb_total_connections_received
(gauge)
Rate of new client connections to DB (connections/sec)
Shown as connection
rdsc.bdb_total_connections_received_max
(gauge)
Highest value of rate of new client connections to DB (connections/sec)
Shown as connection
rdsc.bdb_total_req
(gauge)
Rate of all requests on DB (ops/sec)
Shown as request
rdsc.bdb_total_req_max
(gauge)
Highest value of rate of all requests on DB (ops/sec)
Shown as request
rdsc.bdb_total_res
(gauge)
Rate of all responses on DB (ops/sec)
Shown as response
rdsc.bdb_total_res_max
(gauge)
Highest value of rate of all responses on DB (ops/sec)
Shown as response
rdsc.bdb_up
(gauge)
Database is up and running
Shown as service
rdsc.bdb_used_memory
(gauge)
Memory used by db (in bigredis this includes flash) (bytes)
Shown as byte
rdsc.bdb_write_hits
(gauge)
Rate of write operations accessing an existing key (ops/sec)
Shown as hit
rdsc.bdb_write_hits_max
(gauge)
Highest value of rate of write operations accessing an existing key (ops/sec)
Shown as hit
rdsc.bdb_write_misses
(gauge)
Rate of write operations accessing a non-existing key (ops/sec)
Shown as miss
rdsc.bdb_write_misses_max
(gauge)
Highest value of rate of write operations accessing a non-existing key (ops/sec)
Shown as miss
rdsc.bdb_write_req
(gauge)
Rate of write requests on DB (ops/sec)
Shown as request
rdsc.bdb_write_req_max
(gauge)
Highest value of rate of write requests on DB (ops/sec)
Shown as request
rdsc.bdb_write_res
(gauge)
Rate of write responses on DB (ops/sec)
Shown as response
rdsc.bdb_write_res_max
(gauge)
Highest value of rate of write responses on DB (ops/sec)
Shown as response
rdsc.no_of_expires
(gauge)
Current number of volatile keys in the database
Shown as key
rdsc.node_available_flash
(gauge)
Available flash in node (bytes)
Shown as byte
rdsc.node_available_flash_no_overbooking
(gauge)
Available flash in node (bytes), without taking into account overbooking
Shown as byte
rdsc.node_available_memory
(gauge)
Amount of free memory in node (bytes) that is available for database provisioning
Shown as byte
rdsc.node_available_memory_no_overbooking
(gauge)
Available ram in node (bytes) without taking into account overbooking
Shown as byte
rdsc.node_avg_latency
(gauge)
Average latency of requests handled by endpoints on node (seconds); returned only when there is traffic
Shown as second
rdsc.node_bigstore_free
(gauge)
Sum of free space of back-end flash (used by flash DB's [BigRedis]) on all cluster nodes (bytes); returned only when BigRedis is enabled
Shown as byte
rdsc.node_bigstore_iops
(gauge)
Rate of i/o operations against back-end flash for all shards which are part of a flash based DB (BigRedis) in cluster (ops/sec)
Shown as operation
rdsc.node_bigstore_kv_ops
(gauge)
Rate of value read/write operations against back-end flash for all shards which are part of a flash based DB (BigRedis) in cluster (ops/sec)
Shown as operation
rdsc.node_bigstore_throughput
(gauge)
Throughput i/o operations against back-end flash for all shards which are part of a flash based DB (BigRedis) in cluster (bytes/sec)
Shown as operation
rdsc.node_conns
(gauge)
Number of clients connected to endpoints on node
Shown as connection
rdsc.node_cpu_idle
(gauge)
CPU idle time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_idle_max
(gauge)
Highest value of CPU idle time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_idle_median
(gauge)
Average value of CPU idle time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_idle_min
(gauge)
Lowest value of CPU idle time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_iowait
(gauge)
CPU IO wait time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_iowait_max
(gauge)
Highest value of CPU IO wait time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_iowait_median
(gauge)
Average value of CPU IO wait time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_iowait_min
(gauge)
Lowest value of CPU IO wait time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_irqs
(gauge)
CPU IRQ time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_irqs_max
(gauge)
Highest value of CPU IRQ time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_irqs_median
(gauge)
Average value of CPU IRQ time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_irqs_min
(gauge)
Lowest value of CPU IRQ time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_nice
(gauge)
CPU nice time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_nice_max
(gauge)
Highest value of CPU nice time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_nice_median
(gauge)
Average value of CPU nice time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_nice_min
(gauge)
Lowest value of CPU nice time portion (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_steal
(gauge)
CPU time portion spent in kernel (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_steal_max
(gauge)
Highest value of CPU time portion spent in kernel (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_steal_median
(gauge)
Average value of CPU time portion spent in kernel (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_steal_min
(gauge)
Lowest value of CPU time portion spent in kernel (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_system
(gauge)
CPU time portion spent by kernel-space processes (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_system_max
(gauge)
Highest value of CPU time portion spent by kernel-space processes (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_system_median
(gauge)
Average value of CPU time portion spent by kernel-space processes (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_system_min
(gauge)
Lowest value of CPU time portion spent by kernel-space processes (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_user
(gauge)
CPU time portion spent by user-space processes (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_user_max
(gauge)
Highest value of CPU time portion spent by user-space processes (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_user_median
(gauge)
Average value of CPU time portion spent by user-space processes (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cpu_user_min
(gauge)
Lowest value of CPU time portion spent by user-space processes (0-1, multiply by 100 to get percent)
Shown as cpu
rdsc.node_cur_aof_rewrites
(gauge)
Number of aof rewrites that are currently performed by shards on this node
Shown as write
rdsc.node_egress_bytes
(gauge)
Rate of outgoing network traffic to node (bytes/sec)
Shown as byte
rdsc.node_egress_bytes_max
(gauge)
Highest value of rate of outgoing network traffic to node (bytes/sec)
Shown as byte
rdsc.node_egress_bytes_median
(gauge)
Average value of rate of outgoing network traffic to node (bytes/sec)
Shown as byte
rdsc.node_egress_bytes_min
(gauge)
Lowest value of rate of outgoing network traffic to node (bytes/sec)
Shown as byte
rdsc.node_ephemeral_storage_avail
(gauge)
Disk space available to RLEC processes on configured ephemeral disk (bytes)
Shown as byte
rdsc.node_ephemeral_storage_free
(gauge)
Free disk space on configured ephemeral disk (bytes)
Shown as byte
rdsc.node_free_memory
(gauge)
Free memory in node (bytes)
Shown as byte
rdsc.node_ingress_bytes
(gauge)
Rate of incoming network traffic to node (bytes/sec)
Shown as byte
rdsc.node_ingress_bytes_max
(gauge)
Highest value of rate of incoming network traffic to node (bytes/sec)
Shown as byte
rdsc.node_ingress_bytes_median
(gauge)
Average value of rate of incoming network traffic to node (bytes/sec)
Shown as byte
rdsc.node_ingress_bytes_min
(gauge)
Lowest value of rate of incoming network traffic to node (bytes/sec)
Shown as byte
rdsc.node_persistent_storage_avail
(gauge)
Disk space available to RLEC processes on configured persistent disk (bytes)
Shown as byte
rdsc.node_persistent_storage_free
(gauge)
Free disk space on configured persistent disk (bytes)
Shown as byte
rdsc.node_provisional_flash
(gauge)
Amount of flash available for new shards on this node, taking into account overbooking, max redis servers, reserved flash and provision and migration thresholds
Shown as byte
rdsc.node_provisional_flash_no_overbooking
(gauge)
Amount of flash available for new shards on this node, without taking into account overbooking, max redis servers, reserved flash and provision and migration thresholds
Shown as byte
rdsc.node_provisional_memory
(gauge)
Amount of RAM that is available for provisioning to databases out of the total RAM allocated for databases
Shown as byte
rdsc.node_provisional_memory_no_overbooking
(gauge)
Amount of RAM that is available for provisioning to databases out of the total RAM allocated for databases, without taking into account overbooking
Shown as byte
rdsc.node_total_req
(gauge)
Request rate handled by endpoints on node (ops/sec)
Shown as request
rdsc.node_up
(gauge)
Node is part of the cluster and is connected
Shown as service
rdsc.redis_active_defrag_running
(rate)
Automatic memory defragmentation current aggressiveness (% cpu)
Shown as cpu
rdsc.redis_allocator_active
(gauge)
Total used memory including external fragmentation
Shown as byte
rdsc.redis_allocator_allocated
(gauge)
Total allocated memory
Shown as byte
rdsc.redis_allocator_resident
(gauge)
Total resident memory (RSS)
Shown as byte
rdsc.redis_aof_last_cow_size
(gauge)
Last AOFR, CopyOnWrite memory
Shown as byte
rdsc.redis_aof_rewrite_in_progress
(gauge)
The number of simultaneous AOF rewrites that are in progress
Shown as check
rdsc.redis_aof_rewrites
(gauge)
Number of AOF rewrites this process executed
Shown as write
rdsc.redis_aof_delayed_fsync
(gauge)
Number of times an AOF fsync caused delays in the redis main thread (inducing latency); This can indicate that the disk is slow or overloaded
Shown as operation
rdsc.redis_blocked_clients
(gauge)
Count the clients waiting on a blocking call
Shown as connection
rdsc.redis_connected_clients
(gauge)
Number of client connections to the specific shard
Shown as connection
rdsc.redis_connected_slaves
(gauge)
Number of connected slaves
Shown as connection
rdsc.redis_db0_avg_ttl
(gauge)
Average TTL of all volatile keys
Shown as key
rdsc.redis_db0_expires
(gauge)
Total count of volatile keys
Shown as key
rdsc.redis_db0_keys
(gauge)
Total key count
Shown as key
rdsc.redis_evicted_keys
(gauge)
Keys evicted so far (since restart)
Shown as key
rdsc.redis_expire_cycle_cpu_milliseconds
(gauge)
The cumulative amount of time spent on active expiry cycles
Shown as second
rdsc.redis_expired_keys
(gauge)
Keys expired so far (since restart)
Shown as key
rdsc.redis_forwarding_state
(gauge)
Shard forwarding state (on or off)
Shown as check
rdsc.redis_keys_trimmed
(gauge)
The number of keys that were trimmed in the current or last resharding process
Shown as key
rdsc.redis_keyspace_read_hits
(gauge)
Number of read operations accessing an existing keyspace
Shown as hit
rdsc.redis_keyspace_read_misses
(gauge)
Number of read operations accessing an non-existing keyspace
Shown as miss
rdsc.redis_keyspace_write_hits
(gauge)
Number of write operations accessing an existing keyspace
Shown as hit
rdsc.redis_keyspace_write_misses
(gauge)
Number of write operations accessing an non-existing keyspace
Shown as miss
rdsc.redis_master_link_status
(gauge)
Indicates if the replica is connected to its master
Shown as check
rdsc.redis_master_repl_offset
(gauge)
Number of bytes sent to replicas by the shard; Calculate the throughput for a time period by comparing the value at different times
Shown as byte
rdsc.redis_master_sync_in_progress
(gauge)
The master shard is synchronizing (1 true
Shown as check
rdsc.redis_max_process_mem
(gauge)
Current memory limit configured by redis_mgr according to node free memory
Shown as byte
rdsc.redis_maxmemory
(gauge)
Current memory limit configured by redis_mgr according to db memory limits
Shown as byte
rdsc.redis_mem_aof_buffer
(gauge)
Current size of AOF buffer
Shown as byte
rdsc.redis_mem_clients_normal
(gauge)
Current memory used for input and output buffers of non-replica clients
Shown as byte
rdsc.redis_mem_clients_slaves
(gauge)
Current memory used for input and output buffers of replica clients
Shown as byte
rdsc.redis_mem_fragmentation_ratio
(gauge)
Memory fragmentation ratio (1.3 means 30% overhead)
Shown as percent
rdsc.redis_mem_not_counted_for_evict
(gauge)
Portion of used_memory (in bytes) that's not counted for eviction and OOM error
Shown as byte
rdsc.redis_mem_replication_backlog
(gauge)
Size of replication backlog
Shown as byte
rdsc.redis_module_fork_in_progress
(gauge)
A binary value that indicates if there is an active fork spawned by a module (1) or not (0)
Shown as check
rdsc.redis_process_cpu_system_seconds_total
(gauge)
Shard Process system CPU time spent in seconds
Shown as cpu
rdsc.redis_process_cpu_usage_percent
(gauge)
Shard Process cpu usage precentage
Shown as cpu
rdsc.redis_process_cpu_user_seconds_total
(gauge)
Shard user CPU time spent in seconds
Shown as cpu
rdsc.redis_process_main_thread_cpu_system_seconds_total
(gauge)
Shard main thread system CPU time spent in seconds
Shown as cpu
rdsc.redis_process_main_thread_cpu_user_seconds_total
(gauge)
Shard main thread user CPU time spent in seconds
Shown as second
rdsc.redis_process_max_fds
(gauge)
Shard Maximum number of open file descriptors
Shown as file
rdsc.redis_process_open_fds
(gauge)
Shard Number of open file descriptors
Shown as file
rdsc.redis_process_resident_memory_bytes
(gauge)
Shard Resident memory size in bytes
Shown as byte
rdsc.redis_process_start_time_seconds
(gauge)
Shard Start time of the process since unix epoch in seconds
Shown as second
rdsc.redis_process_virtual_memory_bytes
(gauge)
Shard virtual memory in bytes
Shown as byte
rdsc.redis_rdb_bgsave_in_progress
(gauge)
Indication if bgsave is currently in progress
Shown as check
rdsc.redis_rdb_last_cow_size
(gauge)
Last bgsave (or SYNC fork) used CopyOnWrite memory
Shown as byte
rdsc.redis_rdb_saves
(gauge)
Total count of bgsaves since process was restarted (including replica fullsync and persistence)
Shown as operation
rdsc.redis_repl_touch_bytes
(gauge)
Number of bytes sent to replicas as TOUCH commands by the shard as a result of a READ command that was processe
Shown as byte
rdsc.redis_total_commands_processed
(gauge)
Number of commands processed by the shard; Calculate the number of commands for a time period by comparing the value at different times
Shown as command
rdsc.redis_total_connections_received
(gauge)
Number of connections received by the shard; Calculate the number of connections for a time period by comparing the value at different times
Shown as connection
rdsc.redis_total_net_input_bytes
(gauge)
Number of bytes received by the shard; Calculate the throughput for a time period by comparing the value at different times
Shown as request
rdsc.redis_total_net_output_bytes
(gauge)
Number of bytes sent by the shard; Calculate the throughput for a time period by comparing the value at different times
Shown as response
rdsc.redis_up
(gauge)
Shard is up and running
Shown as service
rdsc.redis_used_memory
(gauge)
Memory used by shard (in bigredis this includes flash) (bytes)
Shown as byte
rdsc.bdb_crdt_syncer_ingress_bytes
(gauge)
Rate of compressed incoming network traffic to Replica Of DB (bytes/sec)
Shown as byte
rdsc.bdb_crdt_syncer_ingress_bytes_decompressed
(gauge)
Rate of decompressed incoming network traffic to Replica Of DB (bytes/sec)
Shown as byte
rdsc.bdb_crdt_syncer_local_ingress_lag_time
(gauge)
Lag time between the source and the destination for Replica Of traffic (ms)
Shown as second
rdsc.bdb_crdt_syncer_status
(gauge)
Syncer status for Replica Of traffic: 0 = in-sync; 1 = syncing; 2 = out of sync
Shown as service
rdsc.bdb_crdt_syncer_egress_bytes
(gauge)
Rate of compressed outgoing network traffic from CRDB (bytes/sec)
Shown as byte
rdsc.bdb_crdt_syncer_egress_bytes_decompressed
(gauge)
Rate of outgoing incoming network traffic from CRDB (bytes/sec)
Shown as byte
rdsc.bdb_crdt_syncer_egress_bytes_decompressed_max
(gauge)
Maximum rate of outgoing incoming network traffic from CRDB (bytes/sec
Shown as byte
rdsc.bdb_crdt_syncer_egress_bytes_max
(gauge)
Maximum rate of compressed outgoing network traffic from CRDB (bytes/sec)
Shown as byte
rdsc.bdb_replicaof_syncer_ingress_bytes
(gauge)
Rate of compressed incoming network traffic to CRDB (bytes/sec)
Shown as byte
rdsc.bdb_replicaof_syncer_ingress_bytes_decompressed
(gauge)
Rate of decompressed incoming network traffic to CRDB (bytes/sec)
Shown as byte
rdsc.bdb_replicaof_syncer_local_ingress_lag_time
(gauge)
Lag time between the source and the destination (ms) for CRDB traffic
Shown as second
rdsc.bdb_replicaof_syncer_status
(gauge)
Syncer status for CRDB traffic: 0 = in-sync; 1 = syncing; 2 = out of sync
Shown as service
rdsc.redis_crdt_backlog_histlen
(gauge)
Replication backlog history length
Shown as byte
rdsc.redis_crdt_backlog_idx
(gauge)
Current backlog index
Shown as index
rdsc.redis_crdt_backlog_master_offset
(gauge)
Replication backlog master offset
Shown as offset
rdsc.redis_crdt_backlog_offset
(gauge)
Replication backlog offset
Shown as offset
rdsc.redis_crdt_backlog_refs
(gauge)
Replication backlog references
Shown as byte
rdsc.redis_crdt_backlog_size
(gauge)
Replication backlog size
Shown as byte
rdsc.redis_crdt_clock
(gauge)
Replication clock
Shown as byte
rdsc.redis_crdt_effect_reqs
(gauge)
Replication effective requests
Shown as request
rdsc.redis_crdt_gc_attempted
(gauge)
Garbage collection attempted
Shown as garbage collection
rdsc.redis_crdt_gc_collected
(gauge)
Garbage collected
Shown as garbage collection
rdsc.redis_crdt_gc_elements_attempted
(gauge)
Garbage collection elements atttempted
Shown as garbage collection
rdsc.redis_crdt_gc_elements_collected
(gauge)
Garbage collection elements collected
Shown as garbage collection
rdsc.redis_crdt_gc_pending
(gauge)
Garbag collection pending
Shown as garbage collection
rdsc.redis_crdt_gc_skipped
(gauge)
Garbage collection skipped
Shown as garbage collection
rdsc.redis_crdt_key_headers
(gauge)
Replication key headers
Shown as byte
rdsc.redis_crdt_list_trimmed_vertices
(gauge)
Replication trimmed vertices
Shown as byte
rdsc.redis_crdt_merge_reqs
(gauge)
Replication merge requests
Shown as request
rdsc.redis_crdt_oom_latch
(gauge)
Replication out-of-memory latch
Shown as byte
rdsc.redis_crdt_ovc_filtered_effect_reqs
(gauge)
OVC filtered effect requests
Shown as byte
rdsc.redis_crdt_peer_dst_id
(gauge)
Peer destination Id
Shown as byte
rdsc.redis_crdt_peer_id
(gauge)
Peer Id
Shown as byte
rdsc.redis_crdt_peer_lag
(gauge)
Peer lag
Shown as second
rdsc.redis_crdt_peer_offset
(gauge)
Peer offset
Shown as offset
rdsc.redis_crdt_peer_peer_state
(gauge)
Peer-to-peer state
Shown as service
rdsc.redis_crdt_pending_list_trimmed_vertices
(gauge)
Pending trimmed vertice list
Shown as byte
rdsc.redis_crdt_raw_dbsize
(gauge)
Replication raw database size
Shown as byte
rdsc.redis_crdt_replica_config_version
(gauge)
Replica config version
Shown as byte
rdsc.redis_crdt_replica_max_ops_lag
(gauge)
Replica maximum operations lag
Shown as second
rdsc.redis_crdt_replica_min_ops_lag
(gauge)
Replica minimum operations lag
Shown as second
rdsc.redis_crdt_replica_shards
(gauge)
Replica shards
Shown as shard
rdsc.redis_crdt_replica_slot_coverage_by_any_ovc
(gauge)
Slots covered by any OVC
Shown as byte
rdsc.redis_crdt_replica_slot_coverage_by_only_ovc
(gauge)
Slots covered by only OVC
Shown as byte
rdsc.redis_crdt_replica_slots
(gauge)
Replication slots
Shown as byte
rdsc.redis_crdt_stale_replica
(gauge)
Replication stale replica
Shown as byte
rdsc.redis_crdt_ts_key_headers
(gauge)
Key timestamp headers
Shown as byte
rdsc.dmcproxy_process_cpu_system_seconds_total
(gauge)
Total proxy cpu system usage seconds
Shown as second
rdsc.dmcproxy_process_cpu_usage_percent
(gauge)
Total proxy cpu user usage percent
Shown as percent
rdsc.dmcproxy_process_cpu_user_seconds_total
(gauge)
Total proxy cpu user usage seconds
Shown as second
rdsc.dmcproxy_process_main_thread_cpu_system_seconds_total
(gauge)
Proxy main thread system usage seconds
Shown as second
rdsc.dmcproxy_process_main_thread_cpu_user_seconds_total
(gauge)
Proxy main thread user usage seconds
Shown as second
rdsc.dmcproxy_process_max_fds
(gauge)
Proxy maximum file descriptors
Shown as inode
rdsc.dmcproxy_process_open_fds
(gauge)
Proxy open file descriptors
Shown as inode
rdsc.dmcproxy_process_resident_memory_bytes
(gauge)
Proxy resident memory
Shown as byte
rdsc.dmcproxy_process_start_time_seconds
(gauge)
Proxy process start time
Shown as second
rdsc.dmcproxy_process_virtual_memory_bytes
(gauge)
Proxy virtual memory
Shown as byte
rdsc.listener_acc_latency
(gauge)
Accumulative latency (sum of the latencies) of all types of commands on DB. For the average latency divide this value by listenertotalres
Shown as second
rdsc.listener_acc_latency_max
(gauge)
Highest value of accumulative latency of all types of commands on DB
Shown as second
rdsc.listener_acc_other_latency
(gauge)
Accumulative latency (sum of the latencies) of commands that are type "other" on DB. For the average latency divide this value by listenerotherres
Shown as second
rdsc.listener_acc_other_latency_max
(gauge)
Highest value of accumulative latency of commands that are type "other" on DB
Shown as second
rdsc.listener_acc_read_latency
(gauge)
Accumulative latency (sum of the latencies) of commands that are type "read" on DB. For the average latency divide this value by listenerreadres
Shown as second
rdsc.listener_acc_read_latency_max
(gauge)
Highest value of accumulative latency of commands that are type "read" on DB
Shown as second
rdsc.listener_acc_write_latency
(gauge)
Accumulative latency (sum of the latencies) of commands that are type "write" on DB. For the average latency divide this value by listenerwriteres
Shown as second
rdsc.listener_acc_write_latency_max
(gauge)
Highest value of accumulative latency of commands that are type "write" on DB
Shown as second
rdsc.listener_auth_cmds
(gauge)
Number of memcached AUTH commands sent to the DB
Shown as command
rdsc.listener_auth_cmds_max
(gauge)
Highest value of number of memcached AUTH commands sent to the DB
Shown as command
rdsc.listener_auth_errors
(gauge)
Number of error responses to memcached AUTH commands
Shown as error
rdsc.listener_auth_errors_max
(gauge)
Highest value of number of error responses to memcached AUTH commands
Shown as error
rdsc.listener_cmd_flush
(gauge)
Number of memcached FLUSH_ALL commands sent to the DB
Shown as command
rdsc.listener_cmd_flush_max
(gauge)
Highest value of number of memcached FLUSH_ALL commands sent to the DB
Shown as command
rdsc.listener_cmd_get
(gauge)
Number of memcached GET commands sent to the DB
Shown as command
rdsc.listener_cmd_get_max
(gauge)
Highest value of number of memcached GET commands sent to the DB
Shown as command
rdsc.listener_cmd_set
(gauge)
Number of memcached SET commands sent to the DB
Shown as command
rdsc.listener_cmd_set_max
(gauge)
Highest value of number of memcached SET commands sent to the DB
Shown as command
rdsc.listener_cmd_touch
(gauge)
Number of memcached TOUCH commands sent to the DB
Shown as command
rdsc.listener_cmd_touch_max
(gauge)
Highest value of number of memcached TOUCH commands sent to the DB
Shown as command
rdsc.listener_conns
(gauge)
Number of clients connected to the endpoint
Shown as connection
rdsc.listener_egress_bytes
(gauge)
Rate of outgoing network traffic to the endpoint (bytes/sec)
Shown as byte
rdsc.listener_egress_bytes_max
(gauge)
Highest value of rate of outgoing network traffic to the endpoint (bytes/sec)
Shown as byte
rdsc.listener_ingress_bytes
(gauge)
Rate of incoming network traffic to the endpoint (bytes/sec)
Shown as byte
rdsc.listener_ingress_bytes_max
(gauge)
Highest value of rate of incoming network traffic to the endpoint (bytes/sec)
Shown as byte
rdsc.listener_last_req_time
(gauge)
Time of last command sent to the DB
Shown as second
rdsc.listener_last_res_time
(gauge)
Time of last response sent from the DB
Shown as second
rdsc.listener_max_connections_exceeded
(gauge)
Number of times the Number of clients connected to the db at the same time has exeeded the max limit
Shown as connection
rdsc.listener_max_connections_exceeded_max
(gauge)
Highest value of number of times the Number of clients connected to the db at the same time has exeeded the max limit
Shown as connection
rdsc.listener_monitor_sessions_count
(gauge)
Number of client connected in monitor mode to the endpoint
Shown as session
rdsc.listener_other_req
(gauge)
Rate of other (non read/write) requests on the endpoint (ops/sec)
Shown as request
rdsc.listener_other_req_max
(gauge)
Highest value of rate of other (non read/write) requests on the endpoint (ops/sec)
Shown as request
rdsc.listener_other_res
(gauge)
Rate of other (non read/write) responses on the endpoint (ops/sec)
Shown as response
rdsc.listener_other_res_max
(gauge)
Highest value of rate of other (non read/write) responses on the endpoint (ops/sec)
Shown as response
rdsc.listener_other_started_res
(gauge)
Number of responses sent from the DB of type "other"
Shown as response
rdsc.listener_other_started_res_max
(gauge)
Highest value of number of responses sent from the DB of type "other"
Shown as response
rdsc.listener_read_req
(gauge)
Rate of read requests on the endpoint (ops/sec)
Shown as request
rdsc.listener_read_req_max
(gauge)
Highest value of rate of read requests on the endpoint (ops/sec)
Shown as request
rdsc.listener_read_res
(gauge)
Rate of read responses on the endpoint (ops/sec)
Shown as response
rdsc.listener_read_res_max
(gauge)
Highest value of rate of read responses on the endpoint (ops/sec)
Shown as response
rdsc.listener_read_started_res
(gauge)
Number of responses sent from the DB of type "read"
Shown as response
rdsc.listener_read_started_res_max
(gauge)
Highest value of number of responses sent from the DB of type "read"
Shown as response
rdsc.listener_total_connections_received
(gauge)
Rate of new client connections to the endpoint (connections/sec)
Shown as connection
rdsc.listener_total_connections_received_max
(gauge)
Highest value of rate of new client connections to the endpoint (connections/sec)
Shown as connection
rdsc.listener_total_req
(gauge)
Request rate handled by the endpoint (ops/sec)
Shown as request
rdsc.listener_total_req_max
(gauge)
Highest value of rate of all requests on the endpoint (ops/sec)
Shown as request
rdsc.listener_total_res
(gauge)
Rate of all responses on the endpoint (ops/sec)
Shown as response
rdsc.listener_total_res_max
(gauge)
Highest value of rate of all responses on the endpoint (ops/sec)
Shown as response
rdsc.listener_total_started_res
(gauge)
Number of responses sent from the DB of all types
Shown as response
rdsc.listener_total_started_res_max
(gauge)
Highest value of number of responses sent from the DB of all types
Shown as response
rdsc.listener_write_req
(gauge)
Rate of write requests on the endpoint (ops/sec)
Shown as request
rdsc.listener_write_req_max
(gauge)
Highest value of rate of write requests on the endpoint (ops/sec)
Shown as request
rdsc.listener_write_res
(gauge)
Rate of write responses on the endpoint (ops/sec)
Shown as response
rdsc.listener_write_res_max
(gauge)
Highest value of rate of write responses on the endpoint (ops/sec)
Shown as response
rdsc.listener_write_started_res
(gauge)
Number of responses sent from the DB of type "write"
Shown as response
rdsc.listener_write_started_res_max
(gauge)
Highest value of number of responses sent from the DB of type "write"
Shown as response
rdsc.namedprocess_namegroup_thread_cpu_seconds_total
(gauge)
Number of CPU seconds that some specific threads has used
Shown as second

Service Checks

The Redis Cloud integration does not include any service checks.

Events

The Redis Cloud integration does not include any events.

Troubleshooting

Need help? Contact Redis Field Engineering.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers