Statsig - RUM

Supported OS Linux Windows Mac OS

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Overview

Statsig’s feature flag tracking integration enriches your Datadog RUM data with feature gate information, allowing you to measure causality between your product features and your system and performance metrics.

Setup

Feature flag tracking setup

Feature flag tracking is available in the RUM Browser SDK. For detailed set up instructions, visit [Getting started with feature flag data in RUM][1].

  1. Update your Browser RUM SDK version to 4.25.0 or above.
  2. Initialize the RUM SDK and configure the enableExperimentalFeatures initialization parameter with ["feature_flags"].
  3. Initialize Statsig’s SDK (>= v4.34.0) and implement the gateEvaluationCallback option as shown below:
await statsig.initialize('client-<STATSIG CLIENT KEY>',
  {userID: '<USER ID>'},
  {     
    gateEvaluationCallback: (key, value) => {
      datadogRum.addFeatureFlagEvaluation(key, value);
    }
  }
); 

Support

Join the [Statsig Slack community][2] for support on enabling this integration. [1]: https://docs.datadoghq.com/real_user_monitoring/guide/setup-feature-flag-data-collection [2]: https://join.slack.com/t/statsigcommunity/shared_invite/zt-pbp005hg-VFQOutZhMw5Vu9eWvCro9g

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers