This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Overview

If you experience unexpected behavior with Datadog RUM, use this guide to resolve issues quickly. If you continue to have trouble, contact Datadog Support for further assistance.

Check if Datadog RUM is initialized

Use the utility method isInitialized to check if the SDK is properly initialized:

if (Datadog.isInitialized()) {
    // your code here
}

Debugging

When writing your application, you can enable development logs by calling the setVerbosity method. All internal messages in the library with a priority equal to or higher than the provided level are then logged to Android’s Logcat:

Datadog.setVerbosity(Log.INFO)

Migrating to 2.0.0

If you’ve been using the SDK v1, there are some breaking changes introduced in version 2.0.0. See the migration guide for more information.

“Deobfuscation failed” warning

A warning appears when deobfuscation fails for a stack trace. If the stack trace is not obfuscated to begin with, you can ignore this warning. Otherwise, use the RUM Debug Symbols page to view all your uploaded mapping files. See Investigate Obfuscated Stack Traces with RUM Debug Symbols.

Further Reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers