This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Metadata

ID: go-best-practices/verify-short-sleep

Language: Go

Severity: Notice

Category: Best Practices

Description

In Go, the function time.Sleep is used to pause the execution of a program for a specified duration. The duration is typically specified using a time.Duration value, which represents a length of time.

Calling time.Sleep with a small number as the argument can lead to inefficient or unpredictable behavior in a program. This is because the argument is interpreted as a duration in nanoseconds, and using a small number can cause the program to consume excessive CPU resources or introduce unnecessary delays.

Here are some good coding practices to avoid calling time.Sleep with a small number:

  1. Avoid using a plain number as the argument: Instead of passing a small number directly to time.Sleep, use the time.Duration type to specify the desired duration explicitly. This will make the code more readable and maintainable.
  2. Prefer using predefined durations: Go provides predefined durations like time.Secondtime.Millisecond, and time.Microsecond. These constants define durations in a more human-readable and understandable way. Use these constants to specify the desired delay rather than using arbitrary small values.
  3. Calculate durations dynamically: If you need to specify a small delay that is less than a predefined duration, you can calculate it dynamically using multiplication or division. For example, instead of using time.Sleep(100), you can use time.Sleep(100 * time.Millisecond) to achieve the same effect in a more accurate and maintainable way.
  4. Consider alternative approaches: In some cases, using time.Sleep may not be the most appropriate solution. If you need to introduce delays between operations, consider using channels, timers, or other concurrency primitives provided by the Go language. These constructs can offer more granular control over scheduling and coordination.

By following these good coding practices, you can ensure that the use of time.Sleep in Go is efficient and predictable, avoiding any unintended side effects caused by calling it with a small number as an argument.

Non-Compliant Code Examples

package main

import ("time")

func main(){
    time.Sleep(1)
    time.Sleep(9000)
    time.Sleep(100 * time.Millisecond)
    time.Sleep(5 * time.Nanosecond)

    fmt.Println("done sleeping")
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Integraciones sin problemas. Prueba Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers