This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Metadata

ID: javascript-best-practices/no-empty

Language: JavaScript

Severity: Error

Category: Best Practices

CWE: 670

Description

Empty or non-functional blocks in the code can be misleading and lead to maintenance difficulties. They can also lead to a false sense of security or functionality. While they may not directly introduce security issues, their presence can suggest that some logic or error handling is implemented when it is not.

Non-Compliant Code Examples

try {} catch (ex) {throw ex}
try { foo() } catch (ex) {}
try { foo() } catch (ex) {throw ex} finally {}
if (foo) {}
while (foo) {}
for (;foo;) {}
switch(foo) {}
switch (foo) { /* empty */ }
try {} catch (ex) {}
try { foo(); } catch (ex) {} finally {}
try {} catch (ex) {} finally {}
try { foo(); } catch (ex) {} finally {}
(function() { }())
var foo = () => {}
function foo() { }
function foo() { 
    
}

Compliant Code Examples

if (foo) { bar() }
while (foo) { bar() }
for (;foo;) { bar() }
try { foo() } catch (ex) { foo() }
switch(foo) {case 'foo': break;}
if (foo) {/* empty */}
while (foo) {/* empty */}
for (;foo;) {/* empty */}
try { foo() } catch (ex) {/* empty */}
try { foo() } catch (ex) {// empty
}
try { foo() } finally {// empty
}
try { foo() } finally {// test
}
try { foo() } finally {
    
    // hi i am off no use
}
try { foo() } catch (ex) {/* test111 */}
if (foo) { bar() } else { // nothing in me 
}
if (foo) { bar() } else { /**/
}
if (foo) { bar() } else { //
}
function foo() { 
  const test = {};  
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Integraciones sin problemas. Prueba Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers