This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Metadata

ID: javascript-code-style/no-lonely-if

Language: JavaScript

Severity: Notice

Category: Best Practices

Description

Prefers else if statement instead of an lonely if statement. Using else if statements` is a cleaner code practice.

Non-Compliant Code Examples

if (a) {;} else { if (b) {;} }

if (a) {
  foo();
} else {
  if (b) {
    bar();
  }
}

if (a) {
  foo();
} else /* comment */ {
  if (b) {
    bar();
  }
}


if (a) {
  foo();
} else {
  /* otherwise, do the other thing */ if (b) {
    bar();
  }
}

if (a) {
  foo();
} else {
  if /* this comment is ok */ (b) {
    bar();
  }
}

if (a) {
  foo();
} else {
  if (b) {
    bar();
  } /* this comment will prevent this test case from being autofixed. */
}
if (foo) {} else { if (bar) baz(); }

// Not fixed; removing the braces would cause a SyntaxError.
if (foo) {} else { if (bar) baz() } qux();

// This is fixed because there is a semicolon after baz().
if (foo) {} else { if (bar) baz(); } qux();

// Not fixed; removing the braces would change the semantics due to ASI.
if (foo) {
} else {
  if (bar) baz()
}
[1, 2, 3].forEach(foo);

// Not fixed; removing the braces would change the semantics due to ASI.
if (foo) {
} else {
    if (bar) baz++
}
foo;

// This is fixed because there is a semicolon after baz++
if (foo) {
} else {
  if (bar) baz++;
}
foo;

// Not fixed; bar() would be interpreted as a template literal tag
if (a) {
  foo();
} else {
  if (b) bar()
}
`template literal`;

if (a) {
  foo();
} else {
  if (b) {
    bar();
  } else if (c) {
    baz();
  } else {
    qux();
  }
}

Compliant Code Examples

if (a) {;} else if (b) {;}
if (a) {;} else { if (b) {;} ; }
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Integraciones sin problemas. Prueba Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers