This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Metadata

ID: python-best-practices/function-variable-argument-name

Language: Python

Severity: Warning

Category: Best Practices

Description

A function parameter should only be read and not be modified. If your intent is to modify the value of the parameter, return the value in the function and handle the new value in the caller of the function.

Non-Compliant Code Examples

def func(arg1, arg2):
    arg1 = foo  # assign to a variable that is an argument
def func(arg1, arg2):
    (arg1, arg3, arg2) = foo  # assign to a variable that is an argument

Compliant Code Examples

def func(arg1, arg2):
    arg3 = foo
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Integraciones sin problemas. Prueba Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers