This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Metadata

ID: python-code-style/function-naming

Language: Python

Severity: Notice

Category: Code Style

Description

Ensure that function use snake_case.

This rule is not valid for tests files (prefixed by test_ or suffixed by _test.py) because testing requires some camel case methods, such as, tearDown, setUp, and more.

Learn More

Non-Compliant Code Examples

def _plop_plip(G, most_valuable_edge):
    pass

class MyClass:
    def visit_Call_Call(something):
        pass
def my_function(myParameter, otherParameter):
  pass
def myFunction(arg1, arg2):
  pass

def myOtherFunction():
  pass
  

Compliant Code Examples

def test_get_major_OS_device(self, *mocks):
    pass
# name used in many testing frameworks. Do not warn on it
def tearDown(self):
    """After each test case, reset and remove the dummy tracer"""
    super(TracerTestCase, self).tearDown()
class TestModel(unittest.TestCase):
    def setUp(self):  # used in a file model_test.py, skip the rule for setUp and tearDown
        pass

    def tearDown(self):  # used in a file model_test.py, skip the rule for setUp and tearDown
        pass

    def test_violation_category(self):
        self.assertEqual(ViolationCategory.BEST_PRACTICE.value, 1)
        self.assertEqual(ViolationCategory.DESIGN.value, 2)
        v1 = Violation("bla", 1, "description", 2, ViolationCategory.BEST_PRACTICE, 10, "notool")
        self.assertEqual(v1.get_category_string(), "Best Practices")
        v1 = Violation("bla", 1, "description", 2, 1, 10, "notool")
        self.assertEqual(v1.get_category_string(), "Unknown")
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Integraciones sin problemas. Prueba Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers