1Password vault export attempt by user

Set up the 1password integration.

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Goal

Detect possible exfiltration attempts from 1Password through a vault export.

Strategy

This rule monitors 1Password audit logs to determine when the export item usage action occurs on a vault. This could indicate exfiltration attempts from 1Password by downloading or exporting items within a vault.

Triage & response

  1. Investigate the {{@usr.email}} attempting to download or export vault {{@vault_uuid}}.
  2. If this action was unintended by the user:
    • Rotate the user’s 1Password master password
    • Identify all the items within the vault that were exported and rotate the necessary authentication credentials
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers