Timeouts for streaming connections in an EKS worker node should be enabled

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Timeouts on streaming connections should be enabled. Setting idle timeouts ensures that the node is protected against Denial-of-Service attacks, inactive connections, and running out of ephemeral ports.

Remediation

Choose a remediation method from below. For both steps, a restart of the Kubelet service is required.

Kubelet config file

  1. Add the json below to this file: /etc/kubernetes/kubelet/kubelet-config.json
"streamingConnectionIdleTimeout": "4h0m0s"

Executable arguments

  1. Edit the Kubelet service file on each worker node and ensure the below parameters are part of the KUBELET_ARGS variable string.
--streaming-connection-idle-timeout=4h0m0s
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers