The Azure PostgreSQL database server should use geo-redundant backups

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

PostgreSQL uses geo-redundant backups.

Rationale

Using geo-redundancy with PostgreSQL creates geographically distributed replicas by default. These replicas assist with achieving data durability, as they protect against data becoming unavailable because of a regional event, such as a natural disaster. You can select this option only at the time of database creation. To modify an existing database to use geo-redundancy, recreate the database.

Remediation

From the console

  1. Follow the instructions listed at Tutorial: Design an Azure Database for PostgreSQL - Single Server using the Azure portal to create a new PostgreSQL database. Ensure Geo-redundant is selected under Backup redundancy options.

From the command line

  1. Follow the steps listed at Tutorial: Design an Azure Database for PostgreSQL - Single Server using Azure CLI to create and deploy a PostgreSQL server.

  2. When configuring the az postgres server create Microsoft Azure Module ensure that geoRedundantBackup is set to Enabled, as shown in the example below.

     az postgres server create 
         -l northeurope 
         -g mygroup 
         -n mysvr 
         -u username 
         -p password 
         --sku-name my_sku
         --ssl-enforcement Enabled 
         --minimal-tls-version TLS1_0 
         --public-network-access Disabled 
         --backup-retention 10 
         --geo-redundant-backup Enabled 
         --storage-size 51200 
         --tags "key=value" 
         --version 11
    
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers