The kubelet configuration file should be owned by root

Set up the kubernetes integration.

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Ensure that if the kubelet refers to a configuration file with the --config argument, that file is owned by root:root. The kubelet reads various parameters, including security settings, from a config file specified by the --config argument.

Remediation

  1. Run the following command based on the file located in the --config parameter:
chown root:root /etc/kubernetes/kubelet.conf
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers