Set Deny For Failed Password Attempts

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

The Ubuntu 20.04 operating system must lock an account after - at most - 5 consecutive invalid access attempts.

Rationale

By limiting the number of failed logon attempts, the risk of unauthorized system access via user password guessing, otherwise known as brute-force attacks, is reduced. Limits are imposed by locking the account. To configure the operating system to lock an account after three unsuccessful consecutive access attempts using pam_tally2.so, modify the content of both /etc/pam.d/common-auth and /etc/pam.d/common-account as follows:

  • add or modify the pam_tally2.so module line in /etc/pam.d/common-auth to ensure both onerr=fail and deny=5 are present. For example:
    auth required pam_tally2.so onerr=fail silent audit deny=5
    
  • add or modify the following line in /etc/pam.d/common-account:
    account required pam_tally2.so
    

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}\n' 'libpam-runtime' 2>/dev/null | grep -q installed; then

var_password_pam_tally2='5'

# Use a non-number regexp to force update of the value of the deny option




if ! grep -qP "^\s*auth\s+required\s+pam_tally2.so\s*.*" "/etc/pam.d/common-auth"; then
    # Line matching group + control + module was not found. Check group + module.
    if [ "$(grep -cP '^\s*auth\s+.*\s+pam_tally2.so\s*' "/etc/pam.d/common-auth")" -eq 1 ]; then
        # The control is updated only if one single line matches.
        sed -i -E --follow-symlinks "s/^(\s*auth\s+).*(\bpam_tally2.so.*)/\1required \2/" "/etc/pam.d/common-auth"
    else
        echo "auth    required    pam_tally2.so" >> "/etc/pam.d/common-auth"
    fi
fi
# Check the option
if ! grep -qP "^\s*auth\s+required\s+pam_tally2.so\s*.*\sdeny\b" "/etc/pam.d/common-auth"; then
    sed -i -E --follow-symlinks "/\s*auth\s+required\s+pam_tally2.so.*/ s/$/ deny=${var_password_pam_tally2}/" "/etc/pam.d/common-auth"
else
    sed -i -E --follow-symlinks "s/(\s*auth\s+required\s+pam_tally2.so\s+.*)(deny=)[[:alnum:]]+\s*(.*)/\1\2${var_password_pam_tally2} \3/" "/etc/pam.d/common-auth"
fi
if ! grep -qP "^\s*auth\s+required\s+pam_tally2.so\s*.*" "/etc/pam.d/common-auth"; then
    # Line matching group + control + module was not found. Check group + module.
    if [ "$(grep -cP '^\s*auth\s+.*\s+pam_tally2.so\s*' "/etc/pam.d/common-auth")" -eq 1 ]; then
        # The control is updated only if one single line matches.
        sed -i -E --follow-symlinks "s/^(\s*auth\s+).*(\bpam_tally2.so.*)/\1required \2/" "/etc/pam.d/common-auth"
    else
        LAST_MATCH_LINE=$(grep -nP "(fail)" "/etc/pam.d/common-auth" | tail -n 1 | cut -d: -f 1)
        if [ ! -z $LAST_MATCH_LINE ]; then
            sed -i --follow-symlinks $LAST_MATCH_LINE" a auth     required    pam_tally2.so" "/etc/pam.d/common-auth"
        else
            echo "auth    required    pam_tally2.so" >> "/etc/pam.d/common-auth"
        fi
    fi
fi
# Check the option
if ! grep -qP "^\s*auth\s+required\s+pam_tally2.so\s*.*\sonerr\b" "/etc/pam.d/common-auth"; then
    sed -i -E --follow-symlinks "/\s*auth\s+required\s+pam_tally2.so.*/ s/$/ onerr=fail/" "/etc/pam.d/common-auth"
else
    sed -i -E --follow-symlinks "s/(\s*auth\s+required\s+pam_tally2.so\s+.*)(onerr=)[[:alnum:]]+\s*(.*)/\1\2fail \3/" "/etc/pam.d/common-auth"
fi
if ! grep -qP "^\s*account\s+required\s+pam_tally2.so\s*.*" "/etc/pam.d/common-account"; then
    # Line matching group + control + module was not found. Check group + module.
    if [ "$(grep -cP '^\s*account\s+.*\s+pam_tally2.so\s*' "/etc/pam.d/common-account")" -eq 1 ]; then
        # The control is updated only if one single line matches.
        sed -i -E --follow-symlinks "s/^(\s*account\s+).*(\bpam_tally2.so.*)/\1required \2/" "/etc/pam.d/common-account"
    else
        echo "account    required    pam_tally2.so" >> "/etc/pam.d/common-account"
    fi
fi
# Check the option
if ! grep -qP "^\s*account\s+required\s+pam_tally2.so\s*.*\s\b" "/etc/pam.d/common-account"; then
    sed -i -E --follow-symlinks "/\s*account\s+required\s+pam_tally2.so.*/ s/$/ /" "/etc/pam.d/common-account"
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
- name: XCCDF Value var_password_pam_tally2 # promote to variable
  set_fact:
    var_password_pam_tally2: !!str 5
  tags:
    - always

- name: Set Deny For Failed Password Attempts - Define a fact for control already
    filtered in case filters are used
  ansible.builtin.set_fact:
    pam_module_control: required
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Check if expected PAM module line
    is present in /etc/pam.d/common-auth
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-auth
    regexp: ^\s*auth\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so\s*.*
    state: absent
  check_mode: true
  changed_when: false
  register: result_pam_line_present
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Include or update the PAM module line
    in /etc/pam.d/common-auth
  block:

  - name: Set Deny For Failed Password Attempts - Check if required PAM module line
      is present in /etc/pam.d/common-auth with different control
    ansible.builtin.lineinfile:
      path: /etc/pam.d/common-auth
      regexp: ^\s*auth\s+.*\s+pam_tally2.so\s*
      state: absent
    check_mode: true
    changed_when: false
    register: result_pam_line_other_control_present

  - name: Set Deny For Failed Password Attempts - Ensure the correct control for the
      required PAM module line in /etc/pam.d/common-auth
    ansible.builtin.replace:
      dest: /etc/pam.d/common-auth
      regexp: ^(\s*auth\s+).*(\bpam_tally2.so.*)
      replace: \1{{ pam_module_control }} \2
    register: result_pam_module_edit
    when:
    - result_pam_line_other_control_present.found == 1

  - name: Set Deny For Failed Password Attempts - Ensure the required PAM module line
      is included in /etc/pam.d/common-auth
    ansible.builtin.lineinfile:
      dest: /etc/pam.d/common-auth
      line: auth    {{ pam_module_control }}    pam_tally2.so
    register: result_pam_module_add
    when:
    - result_pam_line_other_control_present.found == 0 or result_pam_line_other_control_present.found
      > 1

  - name: Set Deny For Failed Password Attempts - Ensure authselect changes are applied
    ansible.builtin.command:
      cmd: authselect apply-changes -b
    when:
    - result_authselect_present is defined
    - result_authselect_present.stat.exists
    - |-
      (result_pam_module_add is defined and result_pam_module_add.changed)
       or (result_pam_module_edit is defined and result_pam_module_edit.changed)
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_pam_line_present.found is defined
  - result_pam_line_present.found == 0
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Define a fact for control already
    filtered in case filters are used
  ansible.builtin.set_fact:
    pam_module_control: required
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Check if the required PAM module option
    is present in /etc/pam.d/common-auth
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-auth
    regexp: ^\s*auth\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so\s*.*\sdeny\b
    state: absent
  check_mode: true
  changed_when: false
  register: result_pam_module_accounts_passwords_pam_tally2_option_present
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Ensure the "deny" PAM option for "pam_tally2.so"
    is included in /etc/pam.d/common-auth
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-auth
    backrefs: true
    regexp: ^(\s*auth\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so.*)
    line: \1 deny={{ var_password_pam_tally2 }}
    state: present
  register: result_pam_accounts_passwords_pam_tally2_add
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_pam_module_accounts_passwords_pam_tally2_option_present.found == 0
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Ensure the required value for "deny"
    PAM option from "pam_tally2.so" in /etc/pam.d/common-auth
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-auth
    backrefs: true
    regexp: ^(\s*auth\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so\s+.*)(deny)=[0-9a-zA-Z]+\s*(.*)
    line: \1\2={{ var_password_pam_tally2 }} \3
  register: result_pam_accounts_passwords_pam_tally2_edit
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_pam_module_accounts_passwords_pam_tally2_option_present.found > 0
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Define a fact for control already
    filtered in case filters are used
  ansible.builtin.set_fact:
    pam_module_control: required
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Check if expected PAM module line
    is present in /etc/pam.d/common-auth
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-auth
    regexp: ^\s*auth\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so\s*.*
    state: absent
  check_mode: true
  changed_when: false
  register: result_pam_line_present
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Include or update the PAM module line
    in /etc/pam.d/common-auth
  block:

  - name: Set Deny For Failed Password Attempts - Check if required PAM module line
      is present in /etc/pam.d/common-auth with different control
    ansible.builtin.lineinfile:
      path: /etc/pam.d/common-auth
      regexp: ^\s*auth\s+.*\s+pam_tally2.so\s*
      state: absent
    check_mode: true
    changed_when: false
    register: result_pam_line_other_control_present

  - name: Set Deny For Failed Password Attempts - Ensure the correct control for the
      required PAM module line in /etc/pam.d/common-auth
    ansible.builtin.replace:
      dest: /etc/pam.d/common-auth
      regexp: ^(\s*auth\s+).*(\bpam_tally2.so.*)
      replace: \1{{ pam_module_control }} \2
    register: result_pam_module_edit
    when:
    - result_pam_line_other_control_present.found == 1

  - name: Set Deny For Failed Password Attempts - Ensure the required PAM module line
      is included in /etc/pam.d/common-auth
    ansible.builtin.lineinfile:
      dest: /etc/pam.d/common-auth
      insertafter: (fail)
      line: auth    {{ pam_module_control }}    pam_tally2.so
    register: result_pam_module_add
    when:
    - result_pam_line_other_control_present.found == 0 or result_pam_line_other_control_present.found
      > 1

  - name: Set Deny For Failed Password Attempts - Ensure authselect changes are applied
    ansible.builtin.command:
      cmd: authselect apply-changes -b
    when:
    - result_authselect_present is defined
    - result_authselect_present.stat.exists
    - |-
      (result_pam_module_add is defined and result_pam_module_add.changed)
       or (result_pam_module_edit is defined and result_pam_module_edit.changed)
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_pam_line_present.found is defined
  - result_pam_line_present.found == 0
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Define a fact for control already
    filtered in case filters are used
  ansible.builtin.set_fact:
    pam_module_control: required
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Check if the required PAM module option
    is present in /etc/pam.d/common-auth
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-auth
    regexp: ^\s*auth\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so\s*.*\sonerr\b
    state: absent
  check_mode: true
  changed_when: false
  register: result_pam_module_accounts_passwords_pam_tally2_option_present
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Ensure the "onerr" PAM option for
    "pam_tally2.so" is included in /etc/pam.d/common-auth
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-auth
    backrefs: true
    regexp: ^(\s*auth\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so.*)
    line: \1 onerr=fail
    state: present
  register: result_pam_accounts_passwords_pam_tally2_add
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_pam_module_accounts_passwords_pam_tally2_option_present.found == 0
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Ensure the required value for "onerr"
    PAM option from "pam_tally2.so" in /etc/pam.d/common-auth
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-auth
    backrefs: true
    regexp: ^(\s*auth\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so\s+.*)(onerr)=[0-9a-zA-Z]+\s*(.*)
    line: \1\2=fail \3
  register: result_pam_accounts_passwords_pam_tally2_edit
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_pam_module_accounts_passwords_pam_tally2_option_present.found > 0
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Define a fact for control already
    filtered in case filters are used
  ansible.builtin.set_fact:
    pam_module_control: required
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Check if expected PAM module line
    is present in /etc/pam.d/common-account
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-account
    regexp: ^\s*account\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so\s*.*
    state: absent
  check_mode: true
  changed_when: false
  register: result_pam_line_present
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Include or update the PAM module line
    in /etc/pam.d/common-account
  block:

  - name: Set Deny For Failed Password Attempts - Check if required PAM module line
      is present in /etc/pam.d/common-account with different control
    ansible.builtin.lineinfile:
      path: /etc/pam.d/common-account
      regexp: ^\s*account\s+.*\s+pam_tally2.so\s*
      state: absent
    check_mode: true
    changed_when: false
    register: result_pam_line_other_control_present

  - name: Set Deny For Failed Password Attempts - Ensure the correct control for the
      required PAM module line in /etc/pam.d/common-account
    ansible.builtin.replace:
      dest: /etc/pam.d/common-account
      regexp: ^(\s*account\s+).*(\bpam_tally2.so.*)
      replace: \1{{ pam_module_control }} \2
    register: result_pam_module_edit
    when:
    - result_pam_line_other_control_present.found == 1

  - name: Set Deny For Failed Password Attempts - Ensure the required PAM module line
      is included in /etc/pam.d/common-account
    ansible.builtin.lineinfile:
      dest: /etc/pam.d/common-account
      line: account    {{ pam_module_control }}    pam_tally2.so
    register: result_pam_module_add
    when:
    - result_pam_line_other_control_present.found == 0 or result_pam_line_other_control_present.found
      > 1

  - name: Set Deny For Failed Password Attempts - Ensure authselect changes are applied
    ansible.builtin.command:
      cmd: authselect apply-changes -b
    when:
    - result_authselect_present is defined
    - result_authselect_present.stat.exists
    - |-
      (result_pam_module_add is defined and result_pam_module_add.changed)
       or (result_pam_module_edit is defined and result_pam_module_edit.changed)
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_pam_line_present.found is defined
  - result_pam_line_present.found == 0
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Define a fact for control already
    filtered in case filters are used
  ansible.builtin.set_fact:
    pam_module_control: required
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Check if the required PAM module option
    is present in /etc/pam.d/common-account
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-account
    regexp: ^\s*account\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so\s*.*\s\b
    state: absent
  check_mode: true
  changed_when: false
  register: result_pam_module_accounts_passwords_pam_tally2_option_present
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Set Deny For Failed Password Attempts - Ensure the "" PAM option for "pam_tally2.so"
    is included in /etc/pam.d/common-account
  ansible.builtin.lineinfile:
    path: /etc/pam.d/common-account
    backrefs: true
    regexp: ^(\s*account\s+{{ pam_module_control | regex_escape() }}\s+pam_tally2.so.*)
    line: \1
    state: present
  register: result_pam_accounts_passwords_pam_tally2_add
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_pam_module_accounts_passwords_pam_tally2_option_present.found == 0
  tags:
  - PCI-DSS-Req-8.1.6
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_tally2
  - configure_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers