Ensure All SUID Executables Are Authorized

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

The SUID (set user id) bit should be set only on files that were installed via authorized means. A straightforward means of identifying unauthorized SUID files is determine if any were not installed as part of an RPM package, which is cryptographically verified. Investigate the origin of any unpackaged SUID files. This configuration check considers authorized SUID files those which were installed via RPM. It is assumed that when an individual has sudo access to install an RPM and all packages are signed with an organizationally-recognized GPG key, the software should be considered an approved package on the system. Any SUID file not deployed through an RPM will be flagged for further review.

Rationale

Executable files with the SUID permission run with the privileges of the owner of the file. SUID files of uncertain provenance could allow for unprivileged users to elevate privileges. The presence of these files should be strictly controlled on the system.

Warning

This rule can take a long time to perform the check and might consume a considerable amount of resources depending on the number of files present on the system. It is not a problem in most cases, but especially systems with a large number of files can be affected. See https://access.redhat.com/articles/6999111.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers