Install libselinux Package

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

The libselinux package can be installed with the following command:


$ sudo yum install libselinux

Rationale

Security-enhanced Linux is a feature of the Linux kernel and a number of utilities with enhanced security functionality designed to add mandatory access controls to Linux. The libselinux package contains the core library of the Security-enhanced Linux system.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if [ ! -f /.dockerenv ] && [ ! -f /run/.containerenv ]; then

if ! rpm -q --quiet "libselinux" ; then
    yum install -y "libselinux"
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Ensure libselinux is installed
  package:
    name: libselinux
    state: present
  when: ansible_virtualization_type not in ["docker", "lxc", "openvz", "podman", "container"]
  tags:
  - CCE-82876-4
  - PCI-DSSv4-1.2.6
  - enable_strategy
  - high_severity
  - low_complexity
  - low_disruption
  - no_reboot_needed
  - package_libselinux_installed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers