Uninstall nftables package

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

nftables is a subsystem of the Linux kernel providing filtering and classification of network packets/datagrams/frames and is the successor to iptables. The nftables package can be removed with the following command:


$ apt-get remove nftables

Rationale

Running both firewalld and nftables may lead to conflict.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# CAUTION: This remediation script will remove nftables
#	   from the system, and may remove any packages
#	   that depend on nftables. Execute this
#	   remediation AFTER testing on a non-production
#	   system!

DEBIAN_FRONTEND=noninteractive apt-get remove -y "nftables"

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Ensure nftables is removed
  package:
    name: nftables
    state: absent
  tags:
  - disable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_nftables_removed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers