Remove tftp Daemon

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Trivial File Transfer Protocol (TFTP) is a simple file transfer protocol, typically used to automatically transfer configuration or boot files between systems. TFTP does not support authentication and can be easily hacked. The package tftp is a client program that allows for connections to a tftp server.

Rationale

It is recommended that TFTP be removed, unless there is a specific need for TFTP (such as a boot server). In that case, use extreme caution when configuring the services.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# CAUTION: This remediation script will remove tftp
#	   from the system, and may remove any packages
#	   that depend on tftp. Execute this
#	   remediation AFTER testing on a non-production
#	   system!

if rpm -q --quiet "tftp" ; then

    yum remove -y "tftp"

fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Ensure tftp is removed
  package:
    name: tftp
    state: absent
  tags:
  - CCE-80443-5
  - PCI-DSSv4-2.2.4
  - disable_strategy
  - low_complexity
  - low_disruption
  - low_severity
  - no_reboot_needed
  - package_tftp_removed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers