Ensure ufw Default Deny Firewall Policy

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

A default deny policy on connections ensures that any unconfigured network usage will be rejected. Note: Any port or protocol without a explicit allow before the default deny will be blocked.

Rationale

With a default accept policy the firewall will accept any packet that is not configured to be denied. It is easier to allow acceptable usage than to block unacceptable usage.

Warning

Changing firewall settings while connected over network can result in being locked out of the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers