Use Only FIPS 140-2 Validated MACs

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Limit the MACs to those hash algorithms which are FIPS-approved. The following line in /etc/ssh/sshd_config demonstrates use of FIPS-approved MACs:

MACs hmac-sha2-512,hmac-sha2-256,hmac-sha1

The man page sshd_config(5) contains a list of supported MACs. The rule is parametrized to use the following MACs: hmac-sha2-512,hmac-sha2-256,hmac-sha1,hmac-sha1-etm@openssh.com,hmac-sha2-256-etm@openssh.com,hmac-sha2-512-etm@openssh.com.

Rationale

DoD Information Systems are required to use FIPS-approved cryptographic hash functions. The only SSHv2 hash algorithms meeting this requirement is SHA2.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}
' 'kernel' 2>/dev/null | grep -q installed; then

sshd_approved_macs='hmac-sha2-512,hmac-sha2-256,hmac-sha1,hmac-sha1-etm@openssh.com,hmac-sha2-256-etm@openssh.com,hmac-sha2-512-etm@openssh.com'


# Strip any search characters in the key arg so that the key can be replaced without
# adding any search characters to the config file.
stripped_key=$(sed 's/[\^=\$,;+]*//g' <<< "^MACs")

# shellcheck disable=SC2059
printf -v formatted_output "%s %s" "$stripped_key" "$sshd_approved_macs"

# If the key exists, change it. Otherwise, add it to the config_file.
# We search for the key string followed by a word boundary (matched by \>),
# so if we search for 'setting', 'setting2' won't match.
if LC_ALL=C grep -q -m 1 -i -e "^MACs\\>" "/etc/ssh/sshd_config"; then
    escaped_formatted_output=$(sed -e 's|/|\\/|g' <<< "$formatted_output")
    LC_ALL=C sed -i --follow-symlinks "s/^MACs\\>.*/$escaped_formatted_output/gi" "/etc/ssh/sshd_config"
else
    if [[ -s "/etc/ssh/sshd_config" ]] && [[ -n "$(tail -c 1 -- "/etc/ssh/sshd_config" || true)" ]]; then
        LC_ALL=C sed -i --follow-symlinks '$a'\\ "/etc/ssh/sshd_config"
    fi
    printf '%s\n' "$formatted_output" >> "/etc/ssh/sshd_config"
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Warning

The system needs to be rebooted for these changes to take effect.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers