Agent Log Files

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

The Datadog Agent does a logs rollover every 10MB by default. When a rollover occurs, one backup (agent.log.1) is kept. If a previous backup exists, it is overwritten during the rollover. To set the maximum size of one log file and the maximum number of backup files to keep, use log_file_max_size(default: 10485760 bytes) and log_file_max_rolls(default: 1) in the Agent configuration file.

Agent log directory

PlatformCommand
Linux/var/log/datadog/
macOS, Agent v7.28+ and v6.28+/opt/datadog-agent/logs
macOS, Agent older than 6.28.0/7.28.0/var/log/datadog
WindowsC:\ProgramData\Datadog\logs

Agent log files

  • agent.log
  • process-agent.log
  • trace-agent.log
  • system-probe.log
  • jmxfetch.log for Agent >= 7.24.0/6.24.0
  • dogstatsd.log for Agent >= 7.46.0

Agent installation log files

PlatformLocation and filename
Linux$(pwd)/ddagent-install.log
macOS/tmp/dd_agent.log
Windows%TEMP%\MSI*.LOG

Further Reading

Documentation, liens et articles supplémentaires utiles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers