Set up Ansible Using a Standalone Datadog Role

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

The Datadog Agent Ansible role installs and configures the Datadog Agent and integrations.

Ansible role versus Ansible collection

The Datadog Agent Ansible role is available through 2 different channels:

  • As part of the Datadog collection, accessible under the datadog.dd name on Ansible Galaxy (recommended).
  • As a standalone role, accessible under the datadog.datadog name on Ansible Galaxy (legacy).

Version 4 of the role and version 5 of the collection install the Datadog Agent v7 by default.

Version 5 of the role and version 6 of the collection no longer support Python 2 and Agent 5. It also no longer supports older versions of Amazon Linux 2 and CentOS.

Setup

Note that the install instructions in this document describe installation of the standalone Datadog role. For installation instructions of the Datadog collection, please refer to the collection README file. The configuration variables are the same for both the standalone role as well as the role accessed through the collection.

Requirements

  • Requires Ansible v2.6+.

  • Supports most Debian and RHEL-based Linux distributions, macOS, and Windows.

  • When using with Ansible 2.10+ to manage Windows hosts, requires the ansible.windows collection to be installed:

    ansible-galaxy collection install ansible.windows
    
  • When using with Ansible 2.10+ to manage openSUSE/SLES hosts, requires the community.general collection to be installed:

    ansible-galaxy collection install community.general
    

Installation

Install the Datadog role from Ansible Galaxy on your Ansible server:

ansible-galaxy install datadog.datadog

To deploy the Datadog Agent on hosts, add the Datadog role and your API key to your playbook:

- hosts: servers
  roles:
    - { role: datadog.datadog, become: yes }
  vars:
    datadog_api_key: "<YOUR_DD_API_KEY>"

The API key is required and its absence causes the role to fail. If you want to provide it through another way, outside of Ansible’s control, specify a placeholder key and substitute the key at a later point.

Air-gapped environments

To install Datadog in an air-gapped environment using a specific registry and images, use the Datadog Ansible collection along with the datadog_installer_registry, datadog_installer_auth, and agent_datadog_config variables.

Note: agent_datadog_config overrides the installer_registry_config setting.

For example:

name: Datadog Agent Install
  include_role:
    name: datadog.dd.agent
  vars:
    datadog_installer_registry: "my.local.registry"
    datadog_yum_repo: "my.local.repo"
    datadog_api_key: "MY_DATADOG_API_KEY"
    datadog_site: "MY_DATADOG_SITE"

Role variables

These variables provide additional configuration during the installation of the Datadog Agent. They should be specified in the vars section of your playbook.

VariableDescription
datadog_api_keyYour Datadog API key. This variable is mandatory starting from 4.21.
datadog_siteThe site of the Datadog intake to send Agent data to. Defaults to datadoghq.com, set to datadoghq.eu to send data to the EU site. This option is only available with Agent version >= 6.6.0.
datadog_agent_flavorOverride the default Debian / RedHat Package for IOT Installations on RPI. Defaults to “datadog-agent” - use “datadog-iot-agent” for RPI.
datadog_agent_versionThe pinned version of the Agent to install (optional, but recommended), for example: 7.16.0. Setting datadog_agent_major_version is not needed if datadog_agent_version is used.
datadog_agent_major_versionThe major version of the Agent to install. The possible values are 6 or 7 (default). If datadog_agent_version is set, it takes precedence otherwise the latest version of the specified major is installed. Setting datadog_agent_major_version is not needed if datadog_agent_version is used.
datadog_checksYAML configuration for Agent checks to drop into:
- /etc/datadog-agent/conf.d/<check_name>.d/conf.yaml for Agent v6 and v7.
datadog_disable_untracked_checksSet to true to remove all checks not present in datadog_checks and datadog_additional_checks.
datadog_additional_checksList of additional checks that are not removed if datadog_disable_untracked_checks is set to true.
datadog_disable_default_checksSet to true to remove all default checks.
datadog_configSet configuration for the Datadog Agent. The role writes the config to the correct location based on the operating system. For a full list of config options, see the datadog.yaml template file in the datadog-agent GitHub repository.
datadog_config_ex(Optional) Extra INI sections to go in /etc/dd-agent/datadog.conf (Agent v5 only).
datadog_apt_repoOverride the default Datadog apt repository. Make sure to use the signed-by option if repository metadata is signed using Datadog’s signing keys: deb [signed-by=/usr/share/keyrings/datadog-archive-keyring.gpg] https://yourrepo.
datadog_apt_cache_valid_timeOverride the default apt cache expiration time (defaults to 1 hour).
datadog_apt_key_url_newOverride the location from which to obtain Datadog apt key (the deprecated datadog_apt_key_url variable refers to an expired key that’s been removed from the role). The URL is expected to be a GPG keyring containing keys 382E94DE, F14F620E and C0962C7D.
datadog_yum_repo_config_enabledSet to false to prevent the configuration of a Datadog yum repository (defaults to true). WARNING: it deactivates the automatic update of GPG keys.
datadog_yum_repoOverride the default Datadog yum repository.
datadog_yum_repo_proxySet a proxy URL to use in the Datadog yum repo configuration.
datadog_yum_repo_proxy_usernameSet a proxy username to use in the Datadog yum repo configuration.
datadog_yum_repo_proxy_passwordSet a proxy password to use in the Datadog yum repo configuration.
datadog_yum_repo_gpgcheckOverride the default repo_gpgcheck value (empty). If empty, value is dynamically set to yes when custom datadog_yum_repo is not used and system is not RHEL/CentOS 8.1 (due to a bug in dnf), otherwise it’s set to no.
datadog_yum_gpgcheckOverride the default gpgcheck value (yes) - use no to turn off package GPG signature verification.
datadog_yum_gpgkeyRemoved in version 4.18.0 Override the default URL to the Datadog yum key used to verify Agent v6 (up to 6.13) packages (key ID 4172A230).
datadog_yum_gpgkey_e09422b3Override the default URL to the Datadog yum key used to verify Agent v6.14+ packages (key ID E09422B3).
datadog_yum_gpgkey_e09422b3_sha256sumOverride the default checksum of the datadog_yum_gpgkey_e09422b3 key.
datadog_zypper_repoOverride the default Datadog zypper repository.
datadog_zypper_repo_gpgcheckOverride the default repo_gpgcheck value (empty). If empty, value is dynamically set to yes when custom datadog_zypper_repo is not used, otherwise it’s set to no.
datadog_zypper_gpgcheckOverride the default gpgcheck value (yes) - use no to turn off package GPG signature verification.
datadog_zypper_gpgkeyRemoved in version 4.18.0 Override the default URL to the Datadog zypper key used to verify Agent v6 (up to 6.13) packages (key ID 4172A230).
datadog_zypper_gpgkey_sha256sumRemoved in version 4.18.0 Override the default checksum of the datadog_zypper_gpgkey key.
datadog_zypper_gpgkey_e09422b3Override the default URL to the Datadog zypper key used to verify Agent v6.14+ packages (key ID E09422B3).
datadog_zypper_gpgkey_e09422b3_sha256sumOverride the default checksum of the datadog_zypper_gpgkey_e09422b3 key.
datadog_agent_allow_downgradeSet to yes to allow Agent downgrade (use with caution, see defaults/main.yml for details). Note: Downgrades are not supported on Windows platforms.
datadog_enabledSet to false to prevent datadog-agent service from starting (defaults to true).
datadog_additional_groupsEither a list, or a string containing a comma-separated list of additional groups for the datadog_user (Linux only).
datadog_windows_ddagentuser_nameThe name of Windows user to create/use, in the format <domain>\<user> (Windows only).
datadog_windows_ddagentuser_passwordThe password used to create the user and/or register the service (Windows only).
datadog_apply_windows_614_fixWhether or not to download and apply file referenced by datadog_windows_614_fix_script_url (Windows only). See https://dtdg.co/win-614-fix for more details. You can set this to false assuming your hosts aren’t running Datadog Agent 6.14.*.
datadog_macos_userThe name of the user to run Agent under. The user has to exist, it won’t be created automatically. Defaults to ansible_user (macOS only).
datadog_macos_download_urlOverride the URL to download the DMG installer from (macOS only).
datadog_apm_instrumentation_enabledConfigure APM instrumentation. Possible values are:
- host: Both the Agent and your services are running on a host.
- docker: The Agent and your services are running in separate Docker containers on the same host.
- all: Supports all the previous scenarios for host and docker at the same time.
datadog_apm_instrumentation_librariesList of APM libraries to install if host or docker injection is enabled (defaults to ["java", "js", "dotnet", "python", "ruby"]). You can find the available values in Inject Libraries Locally.
datadog_remote_updatesEnable remote installation and updates through the datadog-installer.

Integrations

To configure a Datadog integration (check), add an entry to the datadog_checks section. The first level key is the name of the check, and the value is the YAML payload to write the configuration file. Examples are provided below.

To install or remove an integration, refer to the datadog_integration paragraph

Process check

To define two instances for the process check use the configuration below. This creates the corresponding configuration files:

  • Agent v6 & v7: /etc/datadog-agent/conf.d/process.d/conf.yaml
    datadog_checks:
      process:
        init_config:
        instances:
          - name: ssh
            search_string: ['ssh', 'sshd']
          - name: syslog
            search_string: ['rsyslog']
            cpu_check_interval: 0.2
            exact_match: true
            ignore_denied_access: true

Custom check

To configure a custom check use the configuration below. This creates the corresponding configuration files:

  • Agent v6 & v7: /etc/datadog-agent/conf.d/my_custom_check.d/conf.yaml
    datadog_checks:
      my_custom_check:
        init_config:
        instances:
          - some_data: true
Custom Python Checks

To pass a Python check to the playbook, use the configuration below.

This configuration requires the Datadog play and role to be a part of the larger playbook where the value passed in is the relative file path to the actual task for Linux or Windows.

The key should be the name of the file created in the checks directory checks.d/{{ item }}.py:

    datadog_checks:
      my_custom_check:
        init_config:
        instances:
          - some_data: true
    datadog_custom_checks:
      my_custom_check: '../../../custom_checks/my_custom_check.py'

Autodiscovery

When using Autodiscovery, there is no pre-processing nor post-processing on the YAML. This means every YAML section is added to the final configuration file, including autodiscovery identifiers.

The example below configures the PostgreSQL check through Autodiscovery:

    datadog_checks:
      postgres:
        ad_identifiers:
          - db-master
          - db-slave
        init_config:
        instances:
          - host: %%host%%
            port: %%port%%
            username: username
            password: password

Learn more about Autodiscovery in the Datadog documentation.

Tracing

To enable trace collection with Agent v6 or v7 use the following configuration:

datadog_config:
  apm_config:
    enabled: true

Live processes

To enable live process collection with Agent v6 or v7 use the following configuration:

datadog_config:
  process_config:
    enabled: "true" # type: string

The possible values for enabled are: "true", "false" (only container collection), or "disabled" (disable live processes entirely).

Variables

The following variables are available for live processes:

  • scrub_args: Enables the scrubbing of sensitive arguments from a process command line (defaults to true).
  • custom_sensitive_words: Expands the default list of sensitive words used by the command line scrubber.

System probe

The system probe is configured under the system_probe_config variable. Any variables nested underneath are written to the system-probe.yaml, in the system_probe_config section.

Network Performance Monitoring (NPM) is configured under the network_config variable. Any variables nested underneath are written to the system-probe.yaml, in the network_config section.

Cloud Workload Security is configured under the runtime_security_config variable. Any variables nested underneath are written to the system-probe.yaml and security-agent.yaml, in the runtime_security_config section.

Universal Service Monitoring (USM) is configured under the service_monitoring_config variable. Any variables nested underneath are written to the system-probe.yaml, in the service_monitoring_config section.

Compliance is configured under the compliance_config variable. Any variables nested underneath are written to the security-agent.yaml, in the compliance_config section.

All other configuration for the system probe that does not live under any of the above keys should be configured under the system_probe_other_config variable. Any variables nested underneath are written to the top level of system-probe.yaml.

Note for Windows users: NPM is supported on Windows with Agent v6.27+ and v7.27+. It ships as an optional component that is only installed if network_config.enabled is set to true when the Agent is installed or upgraded. Because of this, existing installations might need to do an uninstall and reinstall of the Agent once to install the NPM component, unless the Agent is upgraded at the same time.

Example configuration

datadog_config:
  process_config:
    enabled: "true" # type: string
    scrub_args: true
    custom_sensitive_words: ['consul_token','dd_api_key']
system_probe_config:
  sysprobe_socket: /opt/datadog-agent/run/sysprobe.sock
network_config:
  enabled: true
service_monitoring_config:
  enabled: true
runtime_security_config:
  enabled: true
system_probe_other_config:
  traceroute:
    enabled: true

Note: This configuration works with Agent 6.24.1+ and 7.24.1+. For older Agent versions, see the Network Performance Monitoring documentation on how to enable system-probe.

On Linux, once this modification is complete, follow the steps below if you installed an Agent version older than 6.18.0 or 7.18.0:

  1. Start the system-probe: sudo service datadog-agent-sysprobe start Note: If the service wrapper is not available on your system, run this command instead: sudo initctl start datadog-agent-sysprobe.
  2. Restart the Agent: sudo service datadog-agent restart.
  3. Enable the system-probe to start on boot: sudo service enable datadog-agent-sysprobe.

For manual setup, see the NPM documentation.

Versions

By default, the current major version of the Datadog Ansible role installs Agent v7. The variables datadog_agent_version and datadog_agent_major_version are available to control the Agent version installed.

For v4+ of this role, when datadog_agent_version is used to pin a specific Agent version, the role derives per-OS version names to comply with the version naming schemes of the supported operating systems, for example:

  • 1:7.16.0-1 for Debian and SUSE based
  • 7.16.0-1 for RedHat-based
  • 7.16.0-1 for macOS
  • 7.16.0 for Windows.

This makes it possible to target hosts running different operating systems in the same Ansible run, for example:

ProvidedInstallsSystem
datadog_agent_version: 7.16.01:7.16.0-1Debian and SUSE-based
datadog_agent_version: 7.16.07.16.0-1RedHat-based
datadog_agent_version: 7.16.07.16.0-1macOS
datadog_agent_version: 7.16.07.16.0Windows
datadog_agent_version: 1:7.16.0-11:7.16.0-1Debian and SUSE-based
datadog_agent_version: 1:7.16.0-17.16.0-1RedHat-based
datadog_agent_version: 1:7.16.0-17.16.0Windows

Note: If the version is not provided, the role uses 1 as the epoch and 1 as the release number.

Repositories

Linux

When the variables datadog_apt_repo, datadog_yum_repo, and datadog_zypper_repo are not set, the official Datadog repositories for the major version set in datadog_agent_major_version are used:

To override the default behavior, set these variables to something else than an empty string.

Since version 4.9.0, the use_apt_backup_keyserver variable has been removed, as APT keys are obtained from https://keys.datadoghq.com.

Windows

When the variable datadog_windows_download_url is not set, the official Windows MSI package corresponding to the datadog_agent_major_version is used:

To override the default behavior, set this variable to something other than an empty string.

macOS

When the variable datadog_macos_download_url is not set, the official macOS DMG package corresponding to the datadog_agent_major_version is used:

To override the default behavior, set this variable to something other than an empty string.

Upgrade

To upgrade from Agent v6 to v7, use datadog_agent_major_version: 7 to install the latest version or set datadog_agent_version to a specific version of Agent v7. Use similar logic to upgrade from Agent v5 to v6.

Integration installation

Available for Agent v6.8+

Use the datadog_integration resource to install a specific version of a Datadog integration. Keep in mind, the Agent comes with the core integrations already installed. This command is useful for upgrading a specific integration without upgrading the whole Agent. For more details, see integration management.

If you want to configure an integration, refer to the datadog_checks paragraph

Available actions:

  • install: Installs a specific version of the integration.
  • remove: Removes an integration.
Third party integrations

Datadog community and Datadog Marketplace integrations can be installed with the datadog_integration resource. Note: These integrations are considered to be “third party” and thus need third_party: true to be set—see the example below.

Syntax
  datadog_integration:
    <INTEGRATION_NAME>:
      action: <ACTION>
      version: <VERSION_TO_INSTALL>

To install third party integrations, set third_party to true:

  datadog_integration:
    <INTEGRATION_NAME>:
      action: <ACTION>
      version: <VERSION_TO_INSTALL>
      third_party: true
Example

This example installs version 1.11.0 of the ElasticSearch integration and removes the postgres integration.

 datadog_integration:
   datadog-elastic:
     action: install
     version: 1.11.0
   datadog-postgres:
     action: remove

To see the available versions of Datadog integrations, see their CHANGELOG.md file in the integrations-core repository.

Downgrade

To downgrade to a prior version of the Agent:

  1. Set datadog_agent_version to a specific version, for example: 5.32.5.
  2. Set datadog_agent_allow_downgrade to yes.

Notes:

  • Downgrades are not supported for Windows platforms.

Playbooks

Below are some sample playbooks to assist you with using the Datadog Ansible role.

The following example sends data to Datadog US (default), enables logs, NPM, and configures a few checks.

- hosts: servers
  roles:
    - { role: datadog.datadog, become: yes }
  vars:
    datadog_api_key: "<YOUR_DD_API_KEY>"
    datadog_agent_version: "7.16.0"
    datadog_config:
      tags:
        - "<KEY>:<VALUE>"
        - "<KEY>:<VALUE>"
      log_level: INFO
      apm_config:
        enabled: true
      logs_enabled: true  # available with Agent v6 and v7
    datadog_checks:
      process:
        init_config:
        instances:
          - name: ssh
            search_string: ['ssh', 'sshd' ]
          - name: syslog
            search_string: ['rsyslog' ]
            cpu_check_interval: 0.2
            exact_match: true
            ignore_denied_access: true
      ssh_check:
        init_config:
        instances:
          - host: localhost
            port: 22
            username: root
            password: <YOUR_PASSWORD>
            sftp_check: True
            private_key_file:
            add_missing_keys: True
      nginx:
        init_config:
        instances:
          - nginx_status_url: http://example.com/nginx_status/
            tags:
              - "source:nginx"
              - "instance:foo"
          - nginx_status_url: http://example2.com:1234/nginx_status/
            tags:
              - "source:nginx"
              - "<KEY>:<VALUE>"

        #Log collection is available on Agent 6 and 7
        logs:
          - type: file
            path: /var/log/access.log
            service: myapp
            source: nginx
            sourcecategory: http_web_access
          - type: file
            path: /var/log/error.log
            service: nginx
            source: nginx
            sourcecategory: http_web_access
    # datadog_integration is available on Agent 6.8+
    datadog_integration:
      datadog-elastic:
        action: install
        version: 1.11.0
      datadog-postgres:
        action: remove
    network_config:
      enabled: true

Agent v6

This example installs the latest Agent v6:

- hosts: servers
  roles:
    - { role: datadog.datadog, become: yes }
  vars:
    datadog_agent_major_version: 6
    datadog_api_key: "<YOUR_DD_API_KEY>"

Configuring the site

If using a site other than the default datadoghq.com, set the datadog_site var to the appropriate URL (eg: datadoghq.eu, us3.datadoghq.com).

This example sends data to the EU site:

- hosts: servers
  roles:
    - { role: datadog.datadog, become: yes }
  vars:
    datadog_site: "datadoghq.eu"
    datadog_api_key: "<YOUR_DD_API_KEY>"

Windows

On Windows, remove the become: yes option so the role does not fail. Below are two methods to make the example playbooks work with Windows hosts:

Inventory file

Using the inventory file is the recommended approach. Set the ansible_become option to no in the inventory file for each Windows host:

[servers]
linux1 ansible_host=127.0.0.1
linux2 ansible_host=127.0.0.2
windows1 ansible_host=127.0.0.3 ansible_become=no
windows2 ansible_host=127.0.0.4 ansible_become=no

To avoid repeating the same configuration for all Windows hosts, group them and set the variable at the group level:

[linux]
linux1 ansible_host=127.0.0.1
linux2 ansible_host=127.0.0.2

[windows]
windows1 ansible_host=127.0.0.3
windows2 ansible_host=127.0.0.4

[windows:vars]
ansible_become=no

Playbook file

Alternatively, if your playbook only runs on Windows hosts, use the following in the playbook file:

- hosts: servers
  roles:
    - { role: datadog.datadog }
  vars:
    ...

Note: This configuration fails on Linux hosts. Only use it if the playbook is specific to Windows hosts. Otherwise, use the inventory file method.

Uninstallation

On Windows it’s possible to uninstall the Agent by using the following code in your Ansible role:

- name: Check If Datadog Agent is installed
  win_shell: |
    (@(Get-ChildItem -Path "HKLM:SOFTWARE\Microsoft\Windows\CurrentVersion\Uninstall" -Recurse) | Where {$_.GetValue("DisplayName") -like "Datadog Agent" }).PSChildName    
  register: agent_installed_result
- name: Set Datadog Agent installed fact
  set_fact:
    agent_installed: "{{ agent_installed_result.stdout | trim }}"
- name: Uninstall the Datadog Agent
  win_package:
    product_id: "{{ agent_installed }}"
    state: absent
  when: agent_installed != ""

Troubleshooting

Debian stretch

Note: this information applies to versions of the role prior to 4.9.0. Since 4.9.0, the apt_key module is no longer used by the role.

On Debian Stretch, the apt_key module used by the role requires an additional system dependency to work correctly. The dependency (dirmngr) is not provided by the module. Add the following configuration to your playbooks to make use of the present role:

---
- hosts: all
  pre_tasks:
    - name: Debian Stretch requires the dirmngr package to use apt_key
      become: yes
      apt:
        name: dirmngr
        state: present
  roles:
    - { role: datadog.datadog, become: yes }
  vars:
    datadog_api_key: "<YOUR_DD_API_KEY>"

CentOS 6/7 with Python 3 interpreter and Ansible 2.10.x or below

The yum Python module, which is used in this role to install the Agent on CentOS-based hosts, is only available on Python 2 if Ansible 2.10.x or below is used. In such cases, the dnf package manager would have to be used instead.

However, dnf and the dnf Python module are not installed by default on CentOS-based hosts before CentOS 8. In this case, it is not possible to install the Agent when a Python 3 interpreter is used.

This role fails early when this situation is detected to indicate that Ansible 2.11+ or a Python 2 interpreter is needed when installing the Agent on CentOS / RHEL < 8.

To bypass this early failure detection (for instance, if dnf and the python3-dnf package are available on your host), set the datadog_ignore_old_centos_python3_error variable to true.

Windows

Due to a critical bug in Agent versions 6.14.0 and 6.14.1 on Windows, installation of these versions is blocked (starting with version 3.3.0 of this role).

NOTE: Ansible fails on Windows if datadog_agent_version is set to 6.14.0 or 6.14.1. Use 6.14.2 or above.

If you are updating from 6.14.0 or 6.14.1 on Windows, use the following steps:

  1. Upgrade the present datadog.datadog Ansible role to the latest version (>=3.3.0).
  2. Set the datadog_agent_version to 6.14.2 or above (defaults to latest).

For more details, see Critical Bug in Uninstaller for Datadog Agent 6.14.0 and 6.14.1 on Windows.

Ubuntu 20.04 broken by service_facts

Running the service_facts module on Ubuntu 20.04 causes the following error:

localhost | FAILED! => {
    "changed": false,
    "msg": "Malformed output discovered from systemd list-unit-files: accounts-daemon.service                    enabled         enabled      "
}

To fix this, update Ansible to v2.9.8 or above.

Missing API key

Starting from role 4.21 the API key is mandatory for the role to proceed.

If you need to install the agent through Ansible but don’t want to specify an API key (if you are baking it into a container/VM image for instance) you can:

  • Specify a dummy API key and replace it afterward
  • Disable managed_config (datadog_manage_config: false)
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers