API Management

Configure your API endpoints through the Datadog API.

Note: This endpoint is deprecated.

POST https://api.ap1.datadoghq.com/api/v2/apicatalog/openapihttps://api.datadoghq.eu/api/v2/apicatalog/openapihttps://api.ddog-gov.com/api/v2/apicatalog/openapihttps://api.datadoghq.com/api/v2/apicatalog/openapihttps://api.us3.datadoghq.com/api/v2/apicatalog/openapihttps://api.us5.datadoghq.com/api/v2/apicatalog/openapi

Présentation

Create a new API from the OpenAPI specification given. See the API Catalog documentation for additional information about the possible metadata. It returns the created API ID. This endpoint requires the apm_api_catalog_write permission.

OAuth apps require the apm_api_catalog_write authorization scope to access this endpoint.

Requête

Body Data (required)

Expand All

Champ

Type

Description

openapi_spec_file

binary

Binary OpenAPI spec file

{
  "openapi_spec_file": "string"
}

Réponse

API created successfully

Response for CreateOpenAPI operation.

Expand All

Champ

Type

Description

data

object

Data envelope for CreateOpenAPIResponse.

attributes

object

Attributes for CreateOpenAPI.

failed_endpoints

[object]

List of endpoints which couldn't be parsed.

method

string

The endpoint method.

path

string

The endpoint path.

id

uuid

API identifier.

{
  "data": {
    "attributes": {
      "failed_endpoints": [
        {
          "method": "string",
          "path": "string"
        }
      ]
    },
    "id": "90646597-5fdb-4a17-a240-647003f8c028"
  }
}

Bad request

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Forbidden

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Too many requests

API error response.

Expand All

Champ

Type

Description

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/apicatalog/openapi" \ -H "Accept: application/json" \ -H "Content-Type: multipart/form-data" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -F openapi_spec_file=@string
"""
Create a new API returns "API created successfully" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.api_management_api import APIManagementApi

configuration = Configuration()
configuration.unstable_operations["create_open_api"] = True
with ApiClient(configuration) as api_client:
    api_instance = APIManagementApi(api_client)
    response = api_instance.create_open_api(
        openapi_spec_file=open("openapi-spec.yaml", "rb"),
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Create a new API returns "API created successfully" response

require "datadog_api_client"
DatadogAPIClient.configure do |config|
  config.unstable_operations["v2.create_open_api".to_sym] = true
end
api_instance = DatadogAPIClient::V2::APIManagementAPI.new
opts = {
  openapi_spec_file: File.open("openapi-spec.yaml", "r"),
}
p api_instance.create_open_api(opts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Create a new API returns "API created successfully" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"io"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	configuration.SetUnstableOperationEnabled("v2.CreateOpenAPI", true)
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAPIManagementApi(apiClient)
	resp, r, err := api.CreateOpenAPI(ctx, *datadogV2.NewCreateOpenAPIOptionalParameters().WithOpenapiSpecFile(func() io.Reader { fp, _ := os.Open("openapi-spec.yaml"); return fp }()))

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `APIManagementApi.CreateOpenAPI`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `APIManagementApi.CreateOpenAPI`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Create a new API returns "API created successfully" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.ApiManagementApi;
import com.datadog.api.client.v2.api.ApiManagementApi.CreateOpenAPIOptionalParameters;
import com.datadog.api.client.v2.model.CreateOpenAPIResponse;
import java.io.File;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    defaultClient.setUnstableOperationEnabled("v2.createOpenAPI", true);
    ApiManagementApi apiInstance = new ApiManagementApi(defaultClient);

    try {
      CreateOpenAPIResponse result =
          apiInstance.createOpenAPI(
              new CreateOpenAPIOptionalParameters().openapiSpecFile(new File("openapi-spec.yaml")));
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ApiManagementApi#createOpenAPI");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Create a new API returns "API created successfully" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_api_management::APIManagementAPI;
use datadog_api_client::datadogV2::api_api_management::CreateOpenAPIOptionalParams;
use std::fs;

#[tokio::main]
async fn main() {
    let mut configuration = datadog::Configuration::new();
    configuration.set_unstable_operation_enabled("v2.CreateOpenAPI", true);
    let api = APIManagementAPI::with_config(configuration);
    let resp = api
        .create_open_api(
            CreateOpenAPIOptionalParams::default()
                .openapi_spec_file(fs::read("openapi-spec.yaml").unwrap()),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Create a new API returns "API created successfully" response
 */

import * as fs from "fs";
import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
configuration.unstableOperations["v2.createOpenAPI"] = true;
const apiInstance = new v2.APIManagementApi(configuration);

const params: v2.APIManagementApiCreateOpenAPIRequest = {
  openapiSpecFile: {
    data: Buffer.from(fs.readFileSync("openapi-spec.yaml", "utf8")),
    name: "openapi-spec.yaml",
  },
};

apiInstance
  .createOpenAPI(params)
  .then((data: v2.CreateOpenAPIResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

Note: This endpoint is deprecated.

PUT https://api.ap1.datadoghq.com/api/v2/apicatalog/api/{id}/openapihttps://api.datadoghq.eu/api/v2/apicatalog/api/{id}/openapihttps://api.ddog-gov.com/api/v2/apicatalog/api/{id}/openapihttps://api.datadoghq.com/api/v2/apicatalog/api/{id}/openapihttps://api.us3.datadoghq.com/api/v2/apicatalog/api/{id}/openapihttps://api.us5.datadoghq.com/api/v2/apicatalog/api/{id}/openapi

Présentation

Update information about a specific API. The given content will replace all API content of the given ID. The ID is returned by the create API, or can be found in the URL in the API catalog UI. This endpoint requires the apm_api_catalog_write permission.

OAuth apps require the apm_api_catalog_write authorization scope to access this endpoint.

Arguments

Paramètres du chemin

Nom

Type

Description

id [required]

string

ID of the API to modify

Requête

Body Data (required)

Expand All

Champ

Type

Description

openapi_spec_file

binary

Binary OpenAPI spec file

{
  "openapi_spec_file": "string"
}

Réponse

API updated successfully

Response for UpdateOpenAPI.

Expand All

Champ

Type

Description

data

object

Data envelope for UpdateOpenAPIResponse.

attributes

object

Attributes for UpdateOpenAPI.

failed_endpoints

[object]

List of endpoints which couldn't be parsed.

method

string

The endpoint method.

path

string

The endpoint path.

id

uuid

API identifier.

{
  "data": {
    "attributes": {
      "failed_endpoints": [
        {
          "method": "string",
          "path": "string"
        }
      ]
    },
    "id": "90646597-5fdb-4a17-a240-647003f8c028"
  }
}

Bad request

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Forbidden

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

API not found error

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Too many requests

API error response.

Expand All

Champ

Type

Description

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Path parameters
export id="90646597-5fdb-4a17-a240-647003f8c028"
# Curl command
curl -X PUT "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/apicatalog/api/${id}/openapi" \ -H "Accept: application/json" \ -H "Content-Type: multipart/form-data" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -F openapi_spec_file=@string
"""
Update an API returns "API updated successfully" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.api_management_api import APIManagementApi

# there is a valid "managed_api" in the system
MANAGED_API_DATA_ID = environ["MANAGED_API_DATA_ID"]

configuration = Configuration()
configuration.unstable_operations["update_open_api"] = True
with ApiClient(configuration) as api_client:
    api_instance = APIManagementApi(api_client)
    response = api_instance.update_open_api(
        id=MANAGED_API_DATA_ID,
        openapi_spec_file=open("openapi-spec.yaml", "rb"),
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Update an API returns "API updated successfully" response

require "datadog_api_client"
DatadogAPIClient.configure do |config|
  config.unstable_operations["v2.update_open_api".to_sym] = true
end
api_instance = DatadogAPIClient::V2::APIManagementAPI.new

# there is a valid "managed_api" in the system
MANAGED_API_DATA_ID = ENV["MANAGED_API_DATA_ID"]
opts = {
  openapi_spec_file: File.open("openapi-spec.yaml", "r"),
}
p api_instance.update_open_api(MANAGED_API_DATA_ID, opts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Update an API returns "API updated successfully" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"io"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
	"github.com/google/uuid"
)

func main() {
	// there is a valid "managed_api" in the system
	ManagedAPIDataID := uuid.MustParse(os.Getenv("MANAGED_API_DATA_ID"))

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	configuration.SetUnstableOperationEnabled("v2.UpdateOpenAPI", true)
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAPIManagementApi(apiClient)
	resp, r, err := api.UpdateOpenAPI(ctx, ManagedAPIDataID, *datadogV2.NewUpdateOpenAPIOptionalParameters().WithOpenapiSpecFile(func() io.Reader { fp, _ := os.Open("openapi-spec.yaml"); return fp }()))

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `APIManagementApi.UpdateOpenAPI`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `APIManagementApi.UpdateOpenAPI`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Update an API returns "API updated successfully" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.ApiManagementApi;
import com.datadog.api.client.v2.api.ApiManagementApi.UpdateOpenAPIOptionalParameters;
import com.datadog.api.client.v2.model.UpdateOpenAPIResponse;
import java.io.File;
import java.util.UUID;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    defaultClient.setUnstableOperationEnabled("v2.updateOpenAPI", true);
    ApiManagementApi apiInstance = new ApiManagementApi(defaultClient);

    // there is a valid "managed_api" in the system
    UUID MANAGED_API_DATA_ID = null;
    try {
      MANAGED_API_DATA_ID = UUID.fromString(System.getenv("MANAGED_API_DATA_ID"));
    } catch (IllegalArgumentException e) {
      System.err.println("Error parsing UUID: " + e.getMessage());
    }

    try {
      UpdateOpenAPIResponse result =
          apiInstance.updateOpenAPI(
              MANAGED_API_DATA_ID,
              new UpdateOpenAPIOptionalParameters().openapiSpecFile(new File("openapi-spec.yaml")));
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ApiManagementApi#updateOpenAPI");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Update an API returns "API updated successfully" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_api_management::APIManagementAPI;
use datadog_api_client::datadogV2::api_api_management::UpdateOpenAPIOptionalParams;
use std::fs;

#[tokio::main]
async fn main() {
    // there is a valid "managed_api" in the system
    let managed_api_data_id = uuid::Uuid::parse_str(&std::env::var("MANAGED_API_DATA_ID").unwrap())
        .expect("Invalid UUID");
    let mut configuration = datadog::Configuration::new();
    configuration.set_unstable_operation_enabled("v2.UpdateOpenAPI", true);
    let api = APIManagementAPI::with_config(configuration);
    let resp = api
        .update_open_api(
            managed_api_data_id.clone(),
            UpdateOpenAPIOptionalParams::default()
                .openapi_spec_file(fs::read("openapi-spec.yaml").unwrap()),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Update an API returns "API updated successfully" response
 */

import * as fs from "fs";
import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
configuration.unstableOperations["v2.updateOpenAPI"] = true;
const apiInstance = new v2.APIManagementApi(configuration);

// there is a valid "managed_api" in the system
const MANAGED_API_DATA_ID = process.env.MANAGED_API_DATA_ID as string;

const params: v2.APIManagementApiUpdateOpenAPIRequest = {
  id: MANAGED_API_DATA_ID,
  openapiSpecFile: {
    data: Buffer.from(fs.readFileSync("openapi-spec.yaml", "utf8")),
    name: "openapi-spec.yaml",
  },
};

apiInstance
  .updateOpenAPI(params)
  .then((data: v2.UpdateOpenAPIResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

Note: This endpoint is deprecated.

GET https://api.ap1.datadoghq.com/api/v2/apicatalog/api/{id}/openapihttps://api.datadoghq.eu/api/v2/apicatalog/api/{id}/openapihttps://api.ddog-gov.com/api/v2/apicatalog/api/{id}/openapihttps://api.datadoghq.com/api/v2/apicatalog/api/{id}/openapihttps://api.us3.datadoghq.com/api/v2/apicatalog/api/{id}/openapihttps://api.us5.datadoghq.com/api/v2/apicatalog/api/{id}/openapi

Présentation

Retrieve information about a specific API in OpenAPI format file. This endpoint requires the apm_api_catalog_read permission.

OAuth apps require the apm_api_catalog_read authorization scope to access this endpoint.

Arguments

Paramètres du chemin

Nom

Type

Description

id [required]

string

ID of the API to retrieve

Réponse

OK

Expand All

Champ

Type

Description

No response body

{}

Bad request

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Forbidden

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

API not found error

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Too many requests

API error response.

Expand All

Champ

Type

Description

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Path parameters
export id="90646597-5fdb-4a17-a240-647003f8c028"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/apicatalog/api/${id}/openapi" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get an API returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.api_management_api import APIManagementApi

# there is a valid "managed_api" in the system
MANAGED_API_DATA_ID = environ["MANAGED_API_DATA_ID"]

configuration = Configuration()
configuration.unstable_operations["get_open_api"] = True
with ApiClient(configuration) as api_client:
    api_instance = APIManagementApi(api_client)
    response = api_instance.get_open_api(
        id=MANAGED_API_DATA_ID,
    )

    print(response.read())

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Get an API returns "OK" response

require "datadog_api_client"
DatadogAPIClient.configure do |config|
  config.unstable_operations["v2.get_open_api".to_sym] = true
end
api_instance = DatadogAPIClient::V2::APIManagementAPI.new

# there is a valid "managed_api" in the system
MANAGED_API_DATA_ID = ENV["MANAGED_API_DATA_ID"]
p api_instance.get_open_api(MANAGED_API_DATA_ID)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Get an API returns "OK" response

package main

import (
	"context"
	"fmt"
	"io/ioutil"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
	"github.com/google/uuid"
)

func main() {
	// there is a valid "managed_api" in the system
	ManagedAPIDataID := uuid.MustParse(os.Getenv("MANAGED_API_DATA_ID"))

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	configuration.SetUnstableOperationEnabled("v2.GetOpenAPI", true)
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAPIManagementApi(apiClient)
	resp, r, err := api.GetOpenAPI(ctx, ManagedAPIDataID)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `APIManagementApi.GetOpenAPI`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := ioutil.ReadAll(resp)
	fmt.Fprintf(os.Stdout, "Response from `APIManagementApi.GetOpenAPI`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Get an API returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.ApiManagementApi;
import java.io.File;
import java.util.UUID;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    defaultClient.setUnstableOperationEnabled("v2.getOpenAPI", true);
    ApiManagementApi apiInstance = new ApiManagementApi(defaultClient);

    // there is a valid "managed_api" in the system
    UUID MANAGED_API_DATA_ID = null;
    try {
      MANAGED_API_DATA_ID = UUID.fromString(System.getenv("MANAGED_API_DATA_ID"));
    } catch (IllegalArgumentException e) {
      System.err.println("Error parsing UUID: " + e.getMessage());
    }

    try {
      File result = apiInstance.getOpenAPI(MANAGED_API_DATA_ID);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ApiManagementApi#getOpenAPI");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Get an API returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_api_management::APIManagementAPI;

#[tokio::main]
async fn main() {
    // there is a valid "managed_api" in the system
    let managed_api_data_id = uuid::Uuid::parse_str(&std::env::var("MANAGED_API_DATA_ID").unwrap())
        .expect("Invalid UUID");
    let mut configuration = datadog::Configuration::new();
    configuration.set_unstable_operation_enabled("v2.GetOpenAPI", true);
    let api = APIManagementAPI::with_config(configuration);
    let resp = api.get_open_api(managed_api_data_id.clone()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Get an API returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
configuration.unstableOperations["v2.getOpenAPI"] = true;
const apiInstance = new v2.APIManagementApi(configuration);

// there is a valid "managed_api" in the system
const MANAGED_API_DATA_ID = process.env.MANAGED_API_DATA_ID as string;

const params: v2.APIManagementApiGetOpenAPIRequest = {
  id: MANAGED_API_DATA_ID,
};

apiInstance
  .getOpenAPI(params)
  .then((data: client.HttpFile) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

Note: This endpoint is deprecated.

GET https://api.ap1.datadoghq.com/api/v2/apicatalog/apihttps://api.datadoghq.eu/api/v2/apicatalog/apihttps://api.ddog-gov.com/api/v2/apicatalog/apihttps://api.datadoghq.com/api/v2/apicatalog/apihttps://api.us3.datadoghq.com/api/v2/apicatalog/apihttps://api.us5.datadoghq.com/api/v2/apicatalog/api

Présentation

List APIs and their IDs. This endpoint requires the apm_api_catalog_read permission.

OAuth apps require the apm_api_catalog_read authorization scope to access this endpoint.

Arguments

Chaînes de requête

Nom

Type

Description

query

string

Filter APIs by name

page[limit]

integer

Number of items per page.

page[offset]

integer

Offset for pagination.

Réponse

OK

Response for ListAPIs.

Expand All

Champ

Type

Description

data

[object]

List of API items.

attributes

object

Attributes for ListAPIsResponseData.

name

string

API name.

id

uuid

API identifier.

meta

object

Metadata for ListAPIsResponse.

pagination

object

Pagination metadata information for ListAPIsResponse.

limit

int64

Number of items in the current page.

offset

int64

Offset for pagination.

total_count

int64

Total number of items.

{
  "data": [
    {
      "attributes": {
        "name": "Payments API"
      },
      "id": "90646597-5fdb-4a17-a240-647003f8c028"
    }
  ],
  "meta": {
    "pagination": {
      "limit": 20,
      "offset": 0,
      "total_count": 35
    }
  }
}

Bad request

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Forbidden

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Too many requests

API error response.

Expand All

Champ

Type

Description

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/apicatalog/api" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
List APIs returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.api_management_api import APIManagementApi

configuration = Configuration()
configuration.unstable_operations["list_apis"] = True
with ApiClient(configuration) as api_client:
    api_instance = APIManagementApi(api_client)
    response = api_instance.list_apis()

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# List APIs returns "OK" response

require "datadog_api_client"
DatadogAPIClient.configure do |config|
  config.unstable_operations["v2.list_apis".to_sym] = true
end
api_instance = DatadogAPIClient::V2::APIManagementAPI.new
p api_instance.list_apis()

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// List APIs returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	configuration.SetUnstableOperationEnabled("v2.ListAPIs", true)
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAPIManagementApi(apiClient)
	resp, r, err := api.ListAPIs(ctx, *datadogV2.NewListAPIsOptionalParameters())

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `APIManagementApi.ListAPIs`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `APIManagementApi.ListAPIs`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// List APIs returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.ApiManagementApi;
import com.datadog.api.client.v2.model.ListAPIsResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    defaultClient.setUnstableOperationEnabled("v2.listAPIs", true);
    ApiManagementApi apiInstance = new ApiManagementApi(defaultClient);

    try {
      ListAPIsResponse result = apiInstance.listAPIs();
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ApiManagementApi#listAPIs");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// List APIs returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_api_management::APIManagementAPI;
use datadog_api_client::datadogV2::api_api_management::ListAPIsOptionalParams;

#[tokio::main]
async fn main() {
    let mut configuration = datadog::Configuration::new();
    configuration.set_unstable_operation_enabled("v2.ListAPIs", true);
    let api = APIManagementAPI::with_config(configuration);
    let resp = api.list_apis(ListAPIsOptionalParams::default()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * List APIs returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
configuration.unstableOperations["v2.listAPIs"] = true;
const apiInstance = new v2.APIManagementApi(configuration);

apiInstance
  .listAPIs()
  .then((data: v2.ListAPIsResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

Note: This endpoint is deprecated.

DELETE https://api.ap1.datadoghq.com/api/v2/apicatalog/api/{id}https://api.datadoghq.eu/api/v2/apicatalog/api/{id}https://api.ddog-gov.com/api/v2/apicatalog/api/{id}https://api.datadoghq.com/api/v2/apicatalog/api/{id}https://api.us3.datadoghq.com/api/v2/apicatalog/api/{id}https://api.us5.datadoghq.com/api/v2/apicatalog/api/{id}

Présentation

Delete a specific API by ID. This endpoint requires the apm_api_catalog_write permission.

OAuth apps require the apm_api_catalog_write authorization scope to access this endpoint.

Arguments

Paramètres du chemin

Nom

Type

Description

id [required]

string

ID of the API to delete

Réponse

API deleted successfully

Bad request

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Forbidden

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

API not found error

API error response.

Expand All

Champ

Type

Description

errors [required]

[object]

A list of errors.

detail

string

A human-readable explanation specific to this occurrence of the error.

meta

object

Non-standard meta-information about the error

source

object

References to the source of the error.

header

string

A string indicating the name of a single request header which caused the error.

parameter

string

A string indicating which URI query parameter caused the error.

pointer

string

A JSON pointer to the value in the request document that caused the error.

status

string

Status code of the response.

title

string

Short human-readable summary of the error.

{
  "errors": [
    {
      "detail": "Missing required attribute in body",
      "meta": {},
      "source": {
        "header": "Authorization",
        "parameter": "limit",
        "pointer": "/data/attributes/title"
      },
      "status": "400",
      "title": "Bad Request"
    }
  ]
}

Too many requests

API error response.

Expand All

Champ

Type

Description

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Path parameters
export id="90646597-5fdb-4a17-a240-647003f8c028"
# Curl command
curl -X DELETE "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/apicatalog/api/${id}" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Delete an API returns "API deleted successfully" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.api_management_api import APIManagementApi

# there is a valid "managed_api" in the system
MANAGED_API_DATA_ID = environ["MANAGED_API_DATA_ID"]

configuration = Configuration()
configuration.unstable_operations["delete_open_api"] = True
with ApiClient(configuration) as api_client:
    api_instance = APIManagementApi(api_client)
    api_instance.delete_open_api(
        id=MANAGED_API_DATA_ID,
    )

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Delete an API returns "API deleted successfully" response

require "datadog_api_client"
DatadogAPIClient.configure do |config|
  config.unstable_operations["v2.delete_open_api".to_sym] = true
end
api_instance = DatadogAPIClient::V2::APIManagementAPI.new

# there is a valid "managed_api" in the system
MANAGED_API_DATA_ID = ENV["MANAGED_API_DATA_ID"]
api_instance.delete_open_api(MANAGED_API_DATA_ID)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Delete an API returns "API deleted successfully" response

package main

import (
	"context"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
	"github.com/google/uuid"
)

func main() {
	// there is a valid "managed_api" in the system
	ManagedAPIDataID := uuid.MustParse(os.Getenv("MANAGED_API_DATA_ID"))

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	configuration.SetUnstableOperationEnabled("v2.DeleteOpenAPI", true)
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAPIManagementApi(apiClient)
	r, err := api.DeleteOpenAPI(ctx, ManagedAPIDataID)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `APIManagementApi.DeleteOpenAPI`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Delete an API returns "API deleted successfully" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.ApiManagementApi;
import java.util.UUID;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    defaultClient.setUnstableOperationEnabled("v2.deleteOpenAPI", true);
    ApiManagementApi apiInstance = new ApiManagementApi(defaultClient);

    // there is a valid "managed_api" in the system
    UUID MANAGED_API_DATA_ID = null;
    try {
      MANAGED_API_DATA_ID = UUID.fromString(System.getenv("MANAGED_API_DATA_ID"));
    } catch (IllegalArgumentException e) {
      System.err.println("Error parsing UUID: " + e.getMessage());
    }

    try {
      apiInstance.deleteOpenAPI(MANAGED_API_DATA_ID);
    } catch (ApiException e) {
      System.err.println("Exception when calling ApiManagementApi#deleteOpenAPI");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Delete an API returns "API deleted successfully" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_api_management::APIManagementAPI;

#[tokio::main]
async fn main() {
    // there is a valid "managed_api" in the system
    let managed_api_data_id = uuid::Uuid::parse_str(&std::env::var("MANAGED_API_DATA_ID").unwrap())
        .expect("Invalid UUID");
    let mut configuration = datadog::Configuration::new();
    configuration.set_unstable_operation_enabled("v2.DeleteOpenAPI", true);
    let api = APIManagementAPI::with_config(configuration);
    let resp = api.delete_open_api(managed_api_data_id.clone()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Delete an API returns "API deleted successfully" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
configuration.unstableOperations["v2.deleteOpenAPI"] = true;
const apiInstance = new v2.APIManagementApi(configuration);

// there is a valid "managed_api" in the system
const MANAGED_API_DATA_ID = process.env.MANAGED_API_DATA_ID as string;

const params: v2.APIManagementApiDeleteOpenAPIRequest = {
  id: MANAGED_API_DATA_ID,
};

apiInstance
  .deleteOpenAPI(params)
  .then((data: any) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers