Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Overview

The Text label component can be used to label components, icons, and areas in a diagram, increasing readability and visual appeal.

Screenshot of a 3D representation of the text label component in Cloudcraft

Toolbar

Use the toolbar to configure and customize the component. The following options are available:

  • Color: Select a predefined color or enter the hexadecimal value for the color. Accepts the same color for both 2D and 3D view, or different colors for each.
  • Toggle 3D/2D projection: Display the label in 3D or 2D view.
  • Toggle flat/standing projection: Display the label flat or standing. Not available when 2D projection is toggled.
  • Size: The size of the text label. Accepts a maximum value of 112.
  • Rotate item: Rotate a text label component and change its direction.
  • Outline: Add an outline to the text label for increased color contrast.

API

Use the Cloudcraft API to programmatically access and render your architecture diagrams as JSON objects. The following is an example JSON object of a Text label component:

{
  "type": "isotext",
  "id": "8f2a0f5f-c373-42dd-b4df-f06f455f5f94",
  "mapPos": [3.5, 9],
  "text": "Hello world!",
  "textSize": 56,
  "isometric": true,
  "standing": false,
  "direction": "down",
  "outline": true,
  "color": {
    "2d": "#000000",
    "isometric": "#000000"
  },
  "link": "https://blog.cloudcraft.co/welcome-to-cloudcraft/",
  "locked": true
}
  • type: isotext: The type of component.
  • id: string: A unique identifier for the component in the uuid format.
  • mapPos: [number, number]: The position of the component in the blueprint, expressed as a x,y coordinate pair.
  • text: string: The text used for the label.
  • textSize: number: The size of the text label. Defaults to 25.
  • isometric: boolean: If true, the label is displayed using a 3D projection, while false displays the label in a 2D projection. Defaults to true.
  • standing: boolean: If true, displays the label in a standing position instead of flat. Defaults to false.
  • direction: string: The rotation or direction of the label. Accepts down, up, right, left as value, with down as the default.
  • outline: boolean: If true, adds an outline to the text to increase color contrast. Defaults to false.
  • color: object: The fill color for the component.
    • isometric: string: Fill color for the component in 3D view. Must be an hexadecimal color.
    • 2d: string: Fill color for the component in 2D view. Must be an hexadecimal color.
  • link: uri: Link component to another diagram in the blueprint://ID format or to external website in the https://LINK format.
  • locked: boolean: If true, changes to the component through the application are disabled until unlocked.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers