Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

CD Visibility is not available in the selected site () at this time.

Join the Preview!

CD Visibility is in Preview. If you're interested in this feature, complete the form to request access.

Request Access

Overview

A query filter is composed of terms and operators.

There are two types of terms:

  • A single term is a single word such as test or hello.

  • A sequence is a group of words surrounded by double quotes, such as "hello dolly".

To combine multiple terms into a complex query, you can use any of the following case sensitive Boolean operators:

OperatorDescriptionExample
ANDIntersection: both terms are in the selected events (if nothing is added, AND is taken by default)authentication AND failure
ORUnion: either term is contained in the selected eventsauthentication OR password
-Exclusion: the following term is NOT in the event (apply to each individual raw text search)authentication AND -password

Further reading

Documentation, liens et articles supplémentaires utiles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers