Dynamic Instrumentation Expression Language

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Overview

The Dynamic Instrumentation Expression Language helps you formulate log probe message templates, metric probe expressions, span tag values, and probe conditions. It borrows syntax elements from common programming languages, but also has its own unique rules. The language lets you access local variables, method parameters, and nested fields within objects, and it supports the use of comparison and logical operators.

For example, you can create a histogram from the size of a collection using count(myCollection) as the metric expression. Metric expressions must evaluate to a number.

In log templates and tag values, expressions are delimited from the static parts of the template with brackets, for example: User name is {user.name}. Log template expressions can evaluate to any value. If evaluating the expression fails, it is replaced with UNDEFINED.

Probe conditions must evaluate to a Boolean, for example: startsWith(user.name, "abc"), len(str) > 20 or a == b.

Generally, the Expression Language supports:

  • Accessing local variables, method parameters, and deeply nested fields and attributes within objects.
  • Using comparison operators (<, >, >=, <=, ==, !=, instanceof) to compare variables, fields, and constants in your conditions, for example: localVar1.field1.field2 != 15.
  • Using logical operators (&&, ||, and not or !) to build complex Boolean conditions.
  • Using the null literal (equivalent to nil in Python).

It does not support:

  • Calling methods. Dynamic Instrumentation does not permit executing code that may have side effects. However, you can access private fields directly.
  • Other native programming language syntax beyond what is described on this page.

Try [autocomplete and search (in Preview)][6] for an improved user experience using the Expression Language.

The following sections summarize the variables and operations that the Dynamic Instrumentation Expression Language supports.

Contextual variables

The Expression Language provides contextual variables for different instrumentation scenarios: method instrumentation variables (@return, @duration, @exception) are available only when instrumenting entire methods, while collection and dictionary variables (@it, @key, @value) are only available within predicate expressions for filtering and transforming collections.

KeywordDescription
@returnProvides access to the method return value.
@durationProvides access to the method call execution duration.
@exceptionProvides access to the exception thrown within the method (only available if an uncaught exception exists).
@itProvides access to the current element during collection iteration. Used in predicates for list operations.
@keyProvides access to the current key during dictionary iteration. Used in predicates for dictionary operations.
@valueProvides access to the current value during dictionary iteration. Used in predicates for dictionary operations.

String operations

OperationDescriptionExample
isEmpty(value_src)Checks for presence of data. For strings, it is equivalent to len(str) == 0. For collections, it is equivalent to count(myCollection) == 0
→ isEmpty("Hello")
len(value_src)Gets the string length.
→ len("Hello")
substring(value_src, startIndex, endIndex)Gets a substring.
→ substring("Hello", 0, 2)
startsWith(value_src, string_literal)Checks whether a string starts with the given string literal.
→ startsWith("Hello", "He")
endsWith(value_src, string_literal)Checks whether the string ends with the given string literal.
→ endsWith("Hello", "lo")
contains(value_src, string_literal)Checks whether the string contains the string literal.
→ contains("Hello", "ll")
matches(value_src, string_literal)Checks whether the string matches the regular expression provided as a string literal.
→ matches("Hello", "^H.*o$")

Collection operations

When working with collections (lists, maps, and so on), you can use contextual variables in predicates to access elements during iteration. See the Contextual variables section for details.

The following examples use a variable named myCollection defined as [1,2,3]:

OperationDescriptionExample
any(value_src, {predicate})Checks if there is at least one element in the collection that satisfies the given predicate. The current element is accessed with the @it reference.
→ any(myCollection, {@it > 2})
all(value_src, {predicate})Checks whether every element in a collection satisfies the specified predicate. The current element is accessed with the @it reference.
→ all(myCollection, {@it < 4})
filter(value_src, {predicate})Filters the elements of the collection using the predicate. The current element is accessed with the @it reference.
→ filter(myCollection, {@it > 1})
len(value_src)Gets the collection size.
→ len(myCollection)
[ n ]For collections, returns the nth item in the collection. For maps and dictionaries, returns the value that corresponds to the key n. If the item does not exist, the expression yields an error.
→ myCollection[1]

Try It Out

This interactive simulator helps you experiment with the Expression Language syntax in a realistic environment. It shows how conditions affect whether a log line will be generated when instrumenting a method.

Enter an expression in the “when” field and click “SIMULATE” to see if the log would be generated based on your condition.

Available variables in this example:

  • loops: The route parameter hardcoded to 5
  • a: An array of integers [6, 7, 8, 9, 10]
  • b: A dictionary/object {"a": 1, "b": 2, "c": 3}
  • c: A string "hello world"
  • i: The current loop iteration index
Try these examples:
Note: Condition evaluations and variable access patterns may vary when using the product.
11
12
@app.route('/hello_world/<int:loops>')
13
def hello_world(loops):
14
a = [6, 7, 8, 9, 10]
15
b = {"a": 1, "b": 2, "c": 3}
16
c = "hello world"
17
for i in range(loops):
Emit
with template
Log on loop {i+1} generated
when
18
pass
19
return "OK", 200
20
curl http://example-app:80/hello_world/5
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers