Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

gcp_file_instance

ancestors

Type: UNORDERED_LIST_STRING

create_time

Type: TIMESTAMP
Provider name: createTime
Description: Output only. The time when the instance was created.

custom_performance_supported

Type: BOOLEAN
Provider name: customPerformanceSupported
Description: Output only. Indicates whether this instance supports configuring its performance. If true, the user can configure the instance’s performance by using the ‘performance_config’ field.

deletion_protection_enabled

Type: BOOLEAN
Provider name: deletionProtectionEnabled
Description: Optional. Indicates whether the instance is protected against deletion.

deletion_protection_reason

Type: STRING
Provider name: deletionProtectionReason
Description: Optional. The reason for enabling deletion protection.

description

Type: STRING
Provider name: description
Description: The description of the instance (2048 characters or less).

etag

Type: STRING
Provider name: etag
Description: Server-specified ETag for the instance resource to prevent simultaneous updates from overwriting each other.

file_shares

Type: UNORDERED_LIST_STRUCT
Provider name: fileShares
Description: File system shares on the instance. For this version, only a single file share is supported.

  • capacity_gb
    Type: INT64
    Provider name: capacityGb
    Description: File share capacity in gigabytes (GB). Filestore defines 1 GB as 1024^3 bytes.
  • name
    Type: STRING
    Provider name: name
    Description: Required. The name of the file share. Must use 1-16 characters for the basic service tier and 1-63 characters for all other service tiers. Must use lowercase letters, numbers, or underscores [a-z0-9_]. Must start with a letter. Immutable.
  • nfs_export_options
    Type: UNORDERED_LIST_STRUCT
    Provider name: nfsExportOptions
    Description: Nfs Export Options. There is a limit of 10 export options per file share.
    • access_mode
      Type: STRING
      Provider name: accessMode
      Description: Either READ_ONLY, for allowing only read requests on the exported directory, or READ_WRITE, for allowing both read and write requests. The default is READ_WRITE.
      Possible values:
      • ACCESS_MODE_UNSPECIFIED - AccessMode not set.
      • READ_ONLY - The client can only read the file share.
      • READ_WRITE - The client can read and write the file share (default).
    • anon_gid
      Type: INT64
      Provider name: anonGid
      Description: An integer representing the anonymous group id with a default value of 65534. Anon_gid may only be set with squash_mode of ROOT_SQUASH. An error will be returned if this field is specified for other squash_mode settings.
    • anon_uid
      Type: INT64
      Provider name: anonUid
      Description: An integer representing the anonymous user id with a default value of 65534. Anon_uid may only be set with squash_mode of ROOT_SQUASH. An error will be returned if this field is specified for other squash_mode settings.
    • ip_ranges
      Type: UNORDERED_LIST_STRING
      Provider name: ipRanges
      Description: List of either an IPv4 addresses in the format {octet1}.{octet2}.{octet3}.{octet4} or CIDR ranges in the format {octet1}.{octet2}.{octet3}.{octet4}/{mask size} which may mount the file share. Overlapping IP ranges are not allowed, both within and across NfsExportOptions. An error will be returned. The limit is 64 IP ranges/addresses for each FileShareConfig among all NfsExportOptions.
    • squash_mode
      Type: STRING
      Provider name: squashMode
      Description: Either NO_ROOT_SQUASH, for allowing root access on the exported directory, or ROOT_SQUASH, for not allowing root access. The default is NO_ROOT_SQUASH.
      Possible values:
      • SQUASH_MODE_UNSPECIFIED - SquashMode not set.
      • NO_ROOT_SQUASH - The Root user has root access to the file share (default).
      • ROOT_SQUASH - The Root user has squashed access to the anonymous uid/gid.
  • source_backup
    Type: STRING
    Provider name: sourceBackup
    Description: The resource name of the backup, in the format projects/{project_number}/locations/{location_id}/backups/{backup_id}, that this file share has been restored from.

kms_key_name

Type: STRING
Provider name: kmsKeyName
Description: KMS key name used for data encryption.

labels

Type: UNORDERED_LIST_STRING

name

Type: STRING
Provider name: name
Description: Output only. The resource name of the instance, in the format projects/{project}/locations/{location}/instances/{instance}.

networks

Type: UNORDERED_LIST_STRUCT
Provider name: networks
Description: VPC networks to which the instance is connected. For this version, only a single network is supported.

  • connect_mode
    Type: STRING
    Provider name: connectMode
    Description: The network connect mode of the Filestore instance. If not provided, the connect mode defaults to DIRECT_PEERING.
    Possible values:
    • CONNECT_MODE_UNSPECIFIED - Not set.
    • DIRECT_PEERING - Connect via direct peering to the Filestore service.
    • PRIVATE_SERVICE_ACCESS - Connect to your Filestore instance using Private Service Access. Private services access provides an IP address range for multiple Google Cloud services, including Filestore.
  • ip_addresses
    Type: UNORDERED_LIST_STRING
    Provider name: ipAddresses
    Description: Output only. IPv4 addresses in the format {octet1}.{octet2}.{octet3}.{octet4} or IPv6 addresses in the format {block1}:{block2}:{block3}:{block4}:{block5}:{block6}:{block7}:{block8}.
  • modes
    Type: UNORDERED_LIST_STRING
    Provider name: modes
    Description: Internet protocol versions for which the instance has IP addresses assigned. For this version, only MODE_IPV4 is supported.
  • network
    Type: STRING
    Provider name: network
    Description: The name of the Google Compute Engine VPC network to which the instance is connected.
  • reserved_ip_range
    Type: STRING
    Provider name: reservedIpRange
    Description: Optional, reserved_ip_range can have one of the following two types of values. * CIDR range value when using DIRECT_PEERING connect mode. * Allocated IP address range when using PRIVATE_SERVICE_ACCESS connect mode. When the name of an allocated IP address range is specified, it must be one of the ranges associated with the private service access connection. When specified as a direct CIDR value, it must be a /29 CIDR block for Basic tier, a /24 CIDR block for High Scale tier, or a /26 CIDR block for Enterprise tier in one of the internal IP address ranges that identifies the range of IP addresses reserved for this instance. For example, 10.0.0.0/29, 192.168.0.0/24 or 192.168.0.0/26, respectively. The range you specify can’t overlap with either existing subnets or assigned IP address ranges for other Filestore instances in the selected VPC network.

organization_id

Type: STRING

parent

Type: STRING

performance_config

Type: STRUCT
Provider name: performanceConfig
Description: Optional. Used to configure performance.

  • fixed_iops
    Type: STRUCT
    Provider name: fixedIops
    Description: Choose a fixed provisioned IOPS value for the instance, which will remain constant regardless of instance capacity. Value must be a multiple of 1000. If the chosen value is outside the supported range for the instance’s capacity during instance creation, instance creation will fail with an InvalidArgument error. Similarly, if an instance capacity update would result in a value outside the supported range, the update will fail with an InvalidArgument error.
    • max_iops
      Type: INT64
      Provider name: maxIops
      Description: Required. Maximum IOPS.
  • iops_per_tb
    Type: STRUCT
    Provider name: iopsPerTb
    Description: Provision IOPS dynamically based on the capacity of the instance. Provisioned IOPS will be calculated by multiplying the capacity of the instance in TiB by the iops_per_tb value. For example, for a 2 TiB instance with an iops_per_tb value of 17000 the provisioned IOPS will be 34000. If the calculated value is outside the supported range for the instance’s capacity during instance creation, instance creation will fail with an InvalidArgument error. Similarly, if an instance capacity update would result in a value outside the supported range, the update will fail with an InvalidArgument error.
    • max_iops_per_tb
      Type: INT64
      Provider name: maxIopsPerTb
      Description: Required. Maximum IOPS per TiB.

performance_limits

Type: STRUCT
Provider name: performanceLimits
Description: Output only. Used for getting performance limits.

  • max_iops
    Type: INT64
    Provider name: maxIops
    Description: Output only. The max IOPS.
  • max_read_iops
    Type: INT64
    Provider name: maxReadIops
    Description: Output only. The max read IOPS.
  • max_read_throughput_bps
    Type: INT64
    Provider name: maxReadThroughputBps
    Description: Output only. The max read throughput in bytes per second.
  • max_write_iops
    Type: INT64
    Provider name: maxWriteIops
    Description: Output only. The max write IOPS.
  • max_write_throughput_bps
    Type: INT64
    Provider name: maxWriteThroughputBps
    Description: Output only. The max write throughput in bytes per second.

project_id

Type: STRING

project_number

Type: STRING

protocol

Type: STRING
Provider name: protocol
Description: Immutable. The protocol indicates the access protocol for all shares in the instance. This field is immutable and it cannot be changed after the instance has been created. Default value: NFS_V3.
Possible values:

  • FILE_PROTOCOL_UNSPECIFIED - FILE_PROTOCOL_UNSPECIFIED serves a ’not set’ default value when a FileProtocol is a separate field in a message.
  • NFS_V3 - NFS 3.0.
  • NFS_V4_1 - NFS 4.1.

replication

Type: STRUCT
Provider name: replication
Description: Optional. Replication configuration.

  • replicas
    Type: UNORDERED_LIST_STRUCT
    Provider name: replicas
    Description: Optional. Replication configuration for the replica instance associated with this instance. Only a single replica is supported.
    • last_active_sync_time
      Type: TIMESTAMP
      Provider name: lastActiveSyncTime
      Description: Output only. The timestamp of the latest replication snapshot taken on the active instance and is already replicated safely.
    • peer_instance
      Type: STRING
      Provider name: peerInstance
      Description: Optional. The peer instance.
    • state
      Type: STRING
      Provider name: state
      Description: Output only. The replica state.
      Possible values:
      • STATE_UNSPECIFIED - State not set.
      • CREATING - The replica is being created.
      • READY - The replica is ready.
      • REMOVING - The replica is being removed.
      • FAILED - The replica is experiencing an issue and might be unusable. You can get further details from the stateReasons field of the ReplicaConfig object.
    • state_reasons
      Type: UNORDERED_LIST_STRING
      Provider name: stateReasons
      Description: Output only. Additional information about the replication state, if available.
  • role
    Type: STRING
    Provider name: role
    Description: Optional. The replication role.
    Possible values:
    • ROLE_UNSPECIFIED - Role not set.
    • ACTIVE - The instance is the ACTIVE replication member, functions as the replication source instance.
    • STANDBY - The instance is the STANDBY replication member, functions as the replication destination instance.

resource_name

Type: STRING

satisfies_pzi

Type: BOOLEAN
Provider name: satisfiesPzi
Description: Output only. Reserved for future use.

satisfies_pzs

Type: BOOLEAN
Provider name: satisfiesPzs
Description: Output only. Reserved for future use.

state

Type: STRING
Provider name: state
Description: Output only. The instance state.
Possible values:

  • STATE_UNSPECIFIED - State not set.
  • CREATING - The instance is being created.
  • READY - The instance is available for use.
  • REPAIRING - Work is being done on the instance. You can get further details from the statusMessage field of the Instance resource.
  • DELETING - The instance is shutting down.
  • ERROR - The instance is experiencing an issue and might be unusable. You can get further details from the statusMessage field of the Instance resource.
  • RESTORING - The instance is restoring a backup to an existing file share and may be unusable during this time.
  • SUSPENDED - The instance is suspended. You can get further details from the suspension_reasons field of the Instance resource.
  • SUSPENDING - The instance is in the process of becoming suspended.
  • RESUMING - The instance is in the process of becoming active.
  • REVERTING - The instance is reverting to a snapshot.
  • PROMOTING - The replica instance is being promoted.

status_message

Type: STRING
Provider name: statusMessage
Description: Output only. Additional information about the instance state, if available.

suspension_reasons

Type: UNORDERED_LIST_STRING
Provider name: suspensionReasons
Description: Output only. Field indicates all the reasons the instance is in “SUSPENDED” state.

tags

Type: UNORDERED_LIST_STRING

tier

Type: STRING
Provider name: tier
Description: The service tier of the instance.
Possible values:

  • TIER_UNSPECIFIED - Not set.
  • STANDARD - STANDARD tier. BASIC_HDD is the preferred term for this tier.
  • PREMIUM - PREMIUM tier. BASIC_SSD is the preferred term for this tier.
  • BASIC_HDD - BASIC instances offer a maximum capacity of 63.9 TB. BASIC_HDD is an alias for STANDARD Tier, offering economical performance backed by HDD.
  • BASIC_SSD - BASIC instances offer a maximum capacity of 63.9 TB. BASIC_SSD is an alias for PREMIUM Tier, and offers improved performance backed by SSD.
  • HIGH_SCALE_SSD - HIGH_SCALE instances offer expanded capacity and performance scaling capabilities.
  • ENTERPRISE - ENTERPRISE instances offer the features and availability needed for mission-critical workloads.
  • ZONAL - ZONAL instances offer expanded capacity and performance scaling capabilities.
  • REGIONAL - REGIONAL instances offer the features and availability needed for mission-critical workloads.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers