Stockage Blob Microsoft Azure

Section Overview

Stockage Blob Azure est une solution de stockage d’objets conçue par Microsoft pour le cloud. Le stockage de blobs est optimisé pour d’importants volumes de données non structurées. Recueillez des métriques de Stockage Blob Azure pour :

  • Visualiser les performances de Stockage Blob
  • Corréler les performances de Stockage Blob avec vos applications

Configuration

Installation

Si vous ne l’avez pas déjà fait, configurez d’abord l’intégration Microsoft Azure. Aucune autre procédure d’installation n’est requise.

Données collectées

Métriques

azure.storage_storageaccounts_blobservices.availability
(gauge)
The percentage of availability for the storage service or the specified API operation. Availability is calculated by taking the TotalBillableRequests value and dividing it by the number of applicable requests including those that produced unexpected errors. All unexpected errors result in reduced availability for the storage service or the specified API operation.
Shown as percent
azure.storage_storageaccounts_blobservices.blob_capacity
(gauge)
The amount of storage used by the storage account's Blob service in bytes.
Shown as byte
azure.storage_storageaccounts_blobservices.blob_count
(count)
The number of Blob in the storage account's Blob service.
azure.storage_storageaccounts_blobservices.container_count
(count)
The number of containers in the storage account's Blob service.
azure.storage_storageaccounts_blobservices.egress
(gauge)
The amount of egress data in bytes. This number includes egress from an external client into Azure Storage as well as egress within Azure. As a result this number does not reflect billable egress.
Shown as byte
azure.storage_storageaccounts_blobservices.ingress
(gauge)
The amount of ingress data in bytes. This number includes ingress from an external client into Azure Storage as well as ingress within Azure.
Shown as byte
azure.storage_storageaccounts_blobservices.success_e2_elatency
(gauge)
The average end-to-end latency of successful requests made to a storage service or the specified API operation in milliseconds. This value includes the required processing time within Azure Storage to read the request send the response and receive acknowledgment of the response.
Shown as millisecond
azure.storage_storageaccounts_blobservices.success_server_latency
(gauge)
The average latency used by Azure Storage to process a successful request in milliseconds. This value does not include the network latency specified in AverageE2ELatency.
Shown as millisecond
azure.storage_storageaccounts_blobservices.transactions
(count)
The number of requests made to a storage service or the specified API operation. This number includes successful and failed requests as well as requests which produced errors. Use ResponseType dimension for the number of different type of response.
azure.storage_storageaccounts_blobservices.blob_provisioned_size
(gauge)
The amount of storage provisioned in the storage account’s Blob service in bytes.
Shown as byte
azure.storage_storageaccounts_blobservices.index_capacity
(gauge)
The amount of storage used by Azure Data Lake Storage Gen2 hierarchical index.
Shown as byte

Événements

L’intégration Stockage Blob Azure n’inclut aucun événement.

Checks de service

L’intégration Stockage Blob Azure n’inclut aucun check de service.

Dépannage

Besoin d’aide ? Contactez l’assistance Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers