Microsoft Azure Cosmos DB

Section Overview

Azure Cosmos DB est un service de base de données multi-modèle distribué dans le monde entier qui prend en charge les bases de données clé-valeur, de documents, en colonnes et graphiques.

Utilisez l’intégration Datadog/Azure pour recueillir des métriques de Cosmos DB.

Configuration

Installation

Si vous ne l’avez pas déjà fait, configurez d’abord l’intégration Microsoft Azure. Aucune autre procédure d’installation n’est requise.

Données collectées

Métriques

azure.cosmosdb.region_added
(count)
Region added.
azure.cosmosdb.autoscale_max_throughput
(gauge)
Autoscale max throughput.
azure.cosmosdb.autoscaled_ru
(gauge)
Autoscaled RU consumption with Per Region and Per Partition Autoscale.
azure.cosmosdb.backup_mode_update
(count)
Backup Mode Update.
azure.cosmosdb.backup_policy_interval_update
(count)
Periodic Backup Policy Interval Update. Valid range: 60 - 1440 minutes.
azure.cosmosdb.backup_policy_redundancy_update
(count)
Periodic Backup Policy Redundancy Update.
azure.cosmosdb.backup_policy_retention_update
(count)
Periodic Backup Policy Retention Update. Valid range: 8 - 720 hours.
azure.cosmosdb.backup_policy_update
(count)
Periodic Backup Policy Update.
azure.cosmosdb.deprecated_available_storage
(count)
"Available storage"will be removed from azure monitor at the end of September 2023.
Shown as byte
azure.cosmosdb.cassandra_connection_closures
(count)
Number of Cassandra connections that were closed, reported at a 1 minute granularity.
azure.cosmosdb.cassandra_connector_average_replication_latency
(gauge)
Cassandra connector average replicationlatency.
Shown as millisecond
azure.cosmosdb.cassandra_connector_replication_health_status
(count)
Cassandra connector replication health status.
azure.cosmosdb.cassandra_keyspace_created
(count)
Cassandra keyspace created.
azure.cosmosdb.cassandra_keyspace_deleted
(count)
Cassandra keyspace deleted.
azure.cosmosdb.cassandra_keyspace_throughput_updated
(count)
Cassandra keyspace throughput updated.
azure.cosmosdb.cassandra_keyspace_updated
(count)
Cassandra keyspace updated.
azure.cosmosdb.cassandra_request_charges
(count)
RUs consumed for Cassandra requests made.
azure.cosmosdb.cassandra_requests
(count)
Number of Cassandra requests made.
azure.cosmosdb.cassandra_table_created
(count)
Cassandra table created.
azure.cosmosdb.cassandra_table_deleted
(count)
Cassandra table deleted.
azure.cosmosdb.cassandra_table_throughput_updated
(count)
Cassandra table throughput updated.
azure.cosmosdb.cassandra_table_updated
(count)
Cassandra table updated.
azure.cosmosdb.continuous_tier_update
(count)
ContinuousBackupMode Tier Update.
azure.cosmosdb.account_created
(count)
Account created.
azure.cosmosdb.data_usage
(count)
Total data usage reported at 5 minutes granularity.
Shown as byte
azure.cosmosdb.dedicated_gateway_average_cpu_usage
(gauge)
Average CPU usage across dedicated gateway instances.
Shown as percent
azure.cosmosdb.dedicated_gateway_average_memory_usage
(gauge)
Average memory usage across dedicated gateway instances, which is used for both routing requests and caching data.
Shown as byte
azure.cosmosdb.dedicated_gateway_cpu_usage
(gauge)
CPU usage across dedicated gateway instances.
Shown as percent
azure.cosmosdb.dedicated_gateway_maximum_cpu_usage
(gauge)
Average maximum CPU usage across dedicated gateway instances.
Shown as percent
azure.cosmosdb.dedicated_gateway_memory_usage
(gauge)
Memory usage across dedicated gateway instances.
Shown as byte
azure.cosmosdb.dedicated_gateway_requests
(count)
Requests at the dedicated gateway.
azure.cosmosdb.account_deleted
(count)
Account deleted.
azure.cosmosdb.document_count
(count)
Total document count reported at 5 minutes, 1 hour and 1 day granularity.
azure.cosmosdb.document_quota
(count)
Total storage quota reported at 5 minutes granularity.
Shown as byte
azure.cosmosdb.gremlin_database_created
(count)
Gremlin database created.
azure.cosmosdb.gremlin_database_deleted
(count)
Gremlin database deleted.
azure.cosmosdb.gremlin_database_throughput_updated
(count)
Gremlin database throughput updated.
azure.cosmosdb.gremlin_database_updated
(count)
Gremlin database updated.
azure.cosmosdb.gremlin_graph_created
(count)
Gremlin graph created.
azure.cosmosdb.gremlin_graph_deleted
(count)
Gremlin graph deleted.
azure.cosmosdb.gremlin_graph_throughput_updated
(count)
Gremlin graph throughput updated.
azure.cosmosdb.gremlin_graph_updated
(count)
Gremlin graph updated.
azure.cosmosdb.gremlin_request_charges
(count)
Request units consumed for gremlin requests made.
azure.cosmosdb.gremlin_requests
(count)
Number of gremlin requests made.
azure.cosmosdb.index_usage
(count)
Total index usage reported at 5 minutes granularity.
Shown as byte
azure.cosmosdb.integrated_cache_evicted_entries_size
(gauge)
Size of the entries evicted from the integrated cache.
Shown as byte
azure.cosmosdb.integrated_cache_item_expiration_count
(gauge)
Number of items evicted from the integrated cache due to TTL expiration.
azure.cosmosdb.integrated_cache_item_hit_rate
(gauge)
Number of point reads that used the integrated cache divided by number of point reads routed through the dedicated gateway with eventual consistency.
Shown as percent
azure.cosmosdb.integrated_cache_query_expiration_count
(gauge)
Number of queries evicted from the integrated cache due to TTL expiration.
azure.cosmosdb.integrated_cache_query_hit_rate
(gauge)
Number of queries that used the integrated cache divided by number of queries routed through the dedicated gateway with eventual consistency.
Shown as percent
azure.cosmosdb.materialized_view_catchup_gap_in_minutes
(gauge)
Maximum time difference in minutes between data in source container and data propagated to materialized view.
azure.cosmosdb.materialized_views_builder_average_cpu_usage
(gauge)
Average CPU usage across materialized view builder instances, which are used for populating data in materialized views.
Shown as percent
azure.cosmosdb.materialized_views_builder_average_memory_usage
(gauge)
Average memory usage across materialized view builder instances, which are used for populating data in materialized views.
Shown as byte
azure.cosmosdb.materialized_views_builder_maximum_cpu_usage
(gauge)
Average maximum CPU usage across materialized view builder instances, which are used for populating data in materialized views.
Shown as percent
azure.cosmosdb.metadata_requests
(count)
Count of metadata requests. Cosmos DB maintains system metadata collection for each account, that allows you to enumerate collections, databases, etc, and their configurations, free of charge.
azure.cosmosdb.mongo_collection_created
(count)
Mongo collection created.
azure.cosmosdb.mongo_collection_deleted
(count)
Mongo collection deleted.
azure.cosmosdb.mongo_collection_throughput_updated
(count)
Mongo collection throughput updated.
azure.cosmosdb.mongo_collection_updated
(count)
Mongo collection updated.
azure.cosmosdb.mongo_database_deleted
(count)
Mongo database deleted.
azure.cosmosdb.mongo_database_throughput_updated
(count)
Mongo database throughput updated.
azure.cosmosdb.mongo_database_created
(count)
Mongo database created.
azure.cosmosdb.mongo_database_updated
(count)
Mongo database updated.
azure.cosmosdb.mongo_request_charge
(count)
Mongo request units consumed.
azure.cosmosdb.mongo_requests
(count)
Number of Mongo requests made.
azure.cosmosdb.normalized_ru_consumption
(gauge)
Max RU consumption percentage per minute.
Shown as percent
azure.cosmosdb.region_offlined
(count)
Region offlined.
azure.cosmosdb.region_onlined
(count)
Region onlined.
azure.cosmosdb.physical_partition_count
(gauge)
Physical Partition Count.
azure.cosmosdb.physical_partition_size
(gauge)
Physical partition size in bytes.
Shown as byte
azure.cosmosdb.physical_partition_throughput
(gauge)
Physical partition throughput.
azure.cosmosdb.provisioned_throughput
(gauge)
Provisioned throughput.
azure.cosmosdb.region_failed_over
(count)
Region failed over.
azure.cosmosdb.region_removed
(count)
Region removed.
azure.cosmosdb.p99_replication_latency
(gauge)
P99 replication latency across source and target regions for geo-enabled account.
Shown as millisecond
azure.cosmosdb.server_side_latency
(gauge)
Server side latency.
Shown as millisecond
azure.cosmosdb.server_side_latency_direct
(gauge)
Server side latency in direct connection mode.
Shown as millisecond
azure.cosmosdb.server_side_latency_gateway
(gauge)
Server side latency in gateway connection mode.
Shown as millisecond
azure.cosmosdb.service_availability
(gauge)
Account requests availability at one hour, day or month granularity.
Shown as percent
azure.cosmosdb.sql_container_created
(count)
SQL container created.
azure.cosmosdb.sql_container_deleted
(count)
SQL container deleted.
azure.cosmosdb.sql_container_throughput_updated
(count)
SQL container throughput updated.
azure.cosmosdb.sql_container_updated
(count)
SQL container updated.
azure.cosmosdb.sql_database_created
(count)
SQL database created.
azure.cosmosdb.sql_database_deleted
(count)
SQL database deleted.
azure.cosmosdb.sql_database_throughput_updated
(count)
SQL database throughput updated.
azure.cosmosdb.sql_database_updated
(count)
SQL database updated.
azure.cosmosdb.azure_table_table_created
(count)
AzureTable table created.
azure.cosmosdb.azure_table_table_deleted
(count)
AzureTable table deleted.
azure.cosmosdb.azure_table_table_throughput_updated
(count)
AzureTable table throughput updated.
azure.cosmosdb.azure_table_table_updated
(count)
AzureTable table updated.
azure.cosmosdb.total_requests
(count)
Number of requests made.
azure.cosmosdb.total_requests_preview
(count)
Number of SQL requests.
azure.cosmosdb.total_request_units
(count)
SQL request units consumed.
azure.cosmosdb.total_request_units_preview
(count)
Request units consumed with capacity type.
azure.cosmosdb.account_keys_updated
(count)
Account keys updated.
azure.cosmosdb.account_network_settings_updated
(count)
Account network settings updated.
azure.cosmosdb.account_replication_settings_updated
(count)
Account replication settings updated.
azure.cosmosdb.account_diagnostic_settings_updated
(count)
Account diagnostic settings updated.
azure.cosmosdb.count
(gauge)
Count of DocumentDB databaseAccounts.
azure.documentdb_cassandraclusters.cassandra_cache_capacity
(gauge)
Cache capacity in bytes.
Shown as byte
azure.documentdb_cassandraclusters.cassandra_cache_entries
(gauge)
Total number of cache entries.
azure.documentdb_cassandraclusters.cassandra_cache_hit_rate
(gauge)
All time cache hit rate.
Shown as percent
azure.documentdb_cassandraclusters.cassandra_cache_hits
(count)
Total number of cache hits.
azure.documentdb_cassandraclusters.cassandra_cache_miss_latency_histogram
(count)
Histogram of cache miss latency (in microseconds).
azure.documentdb_cassandraclusters.cassandra_cache_miss_latency_p99
(gauge)
p99 Latency of misses.
azure.documentdb_cassandraclusters.cassandra_cache_requests
(count)
Total number of cache requests.
azure.documentdb_cassandraclusters.cassandra_cache_size
(gauge)
Total size of occupied cache; in bytes.
Shown as byte
azure.documentdb_cassandraclusters.cassandra_client_auth_failure
(count)
Number of failed client authentication requests.
azure.documentdb_cassandraclusters.cassandra_client_auth_success
(count)
Number of successful client authentication requests.
azure.documentdb_cassandraclusters.cassandra_client_connected_native_clients
(gauge)
Number of connected native clients.
azure.documentdb_cassandraclusters.cassandra_client_request_condition_not_met
(count)
Number of transaction preconditions did not match current values.
azure.documentdb_cassandraclusters.cassandra_client_request_contention_histogram
(count)
How many contended reads/writes were encountered.
azure.documentdb_cassandraclusters.cassandra_client_request_contention_histogram_p99
(gauge)
p99 How many contended writes were encountered.
azure.documentdb_cassandraclusters.cassandra_client_request_failures
(count)
Number of transaction failures encountered.
azure.documentdb_cassandraclusters.cassandra_client_request_latency_histogram
(count)
Histogram of client request latency (in microseconds).
azure.documentdb_cassandraclusters.cassandra_client_request_latency_max
(count)
Maximum client request latency (microseconds).
azure.documentdb_cassandraclusters.cassandra_client_request_latency_p99
(gauge)
p99 Latency.
azure.documentdb_cassandraclusters.cassandra_client_request_timeouts
(count)
Number of timeouts encountered.
azure.documentdb_cassandraclusters.cassandra_client_request_unfinished_commit
(count)
Number of transactions that were committed on write.
azure.documentdb_cassandraclusters.cassandra_commit_log_waiting_on_commit_latency_histogram
(count)
Histogram of the time spent waiting on CL fsync (in microseconds); for Periodic this is only occurs when the sync is lagging its sync interval.
azure.documentdb_cassandraclusters.cassandra_cql_prepared_statements_executed
(count)
Number of prepared statements executed.
azure.documentdb_cassandraclusters.cassandra_cql_regular_statements_executed
(count)
Number of non prepared statements executed.
azure.documentdb_cassandraclusters.cassandra_dropped_messages_count
(count)
Total count of dropped messages.
azure.documentdb_cassandraclusters.cassandra_dropped_message_cross_node_latency
(gauge)
Average dropped latency across nodes.
Shown as millisecond
azure.documentdb_cassandraclusters.cassandra_dropped_message_cross_node_latency_p99
(gauge)
99th percentile of dropped latency across nodes.
Shown as millisecond
azure.documentdb_cassandraclusters.cassandra_dropped_message_internal_latency
(gauge)
Total count of dropped messages.
Shown as millisecond
azure.documentdb_cassandraclusters.cassandra_dropped_message_rate
(count)
Rate of dropped messages.
azure.documentdb_cassandraclusters.cassandra_hints_failed_rate
(count)
Rate of the hints that failed deliver.
azure.documentdb_cassandraclusters.cassandra_hints_succeeded_rate
(count)
Rate of the hints successfully delivered.
azure.documentdb_cassandraclusters.cassandra_hints_timed_out_rate
(count)
Rate of the hints that timed out.
azure.documentdb_cassandraclusters.cassandra_jvm_gc_count
(gauge)
Total number of collections that have occurred.
azure.documentdb_cassandraclusters.cassandra_jvm_gc_time
(gauge)
Approximate accumulated collection elapsed time.
Shown as millisecond
azure.documentdb_cassandraclusters.cassandra_storage_total_hints_counter_total
(count)
Cumulative number of total hints in storage.
azure.documentdb_cassandraclusters.cassandra_storage_total_hints_in_progress_counter_total
(count)
Number of total hints in progress.
azure.documentdb_cassandraclusters.cassandra_table_all_memtables_live_data_size
(gauge)
Total amount of live data stored in the memtables (2i and pending flush memtables included) that resides off-heap; excluding any data structure overhead.
azure.documentdb_cassandraclusters.cassandra_table_all_memtables_off_heap_size
(gauge)
Total amount of data stored in the memtables (2i and pending flush memtables included) that resides off-heap.
azure.documentdb_cassandraclusters.cassandra_table_bloom_filter_disk_space_used
(gauge)
Disk space used by bloom filter (in bytes).
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_bloom_filter_false_positives
(gauge)
Number of false positives on table's bloom filter.
azure.documentdb_cassandraclusters.cassandra_table_bloom_filter_false_ratio
(gauge)
False positive ratio of table's bloom filter.
Shown as percent
azure.documentdb_cassandraclusters.cassandra_table_bloom_filter_off_heap_memory_used
(gauge)
Off-heap memory used by bloom filter.
azure.documentdb_cassandraclusters.cassandra_table_bytes_flushed
(count)
Total number of bytes flushed since server [re]start.
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_cas_commit
(count)
Latency of paxos commit round.
azure.documentdb_cassandraclusters.cassandra_table_cas_commit_p99
(gauge)
p99 Latency of paxos commit round.
azure.documentdb_cassandraclusters.cassandra_table_cas_prepare
(count)
Latency of paxos prepare round.
azure.documentdb_cassandraclusters.cassandra_table_cas_prepare_p99
(gauge)
p99 Latency of paxos prepare round.
azure.documentdb_cassandraclusters.cassandra_table_cas_propose
(count)
Latency of paxos propose round.
azure.documentdb_cassandraclusters.cassandra_table_cas_propose_p99
(gauge)
p99 Latency of paxos propose round.
azure.documentdb_cassandraclusters.cassandra_table_col_update_time_delta_histogram
(count)
Column update time delta on this table.
azure.documentdb_cassandraclusters.cassandra_table_col_update_time_delta_histogram_p99
(gauge)
p99 Column update time delta on this table.
azure.documentdb_cassandraclusters.cassandra_table_compaction_bytes_written
(count)
Total number of bytes written by compaction since server [re]start.
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_compression_metadata_off_heap_memory_used
(gauge)
Off-heap memory used by compression meta data.
azure.documentdb_cassandraclusters.cassandra_table_compression_ratio
(gauge)
Current compression ratio for all SSTables.
Shown as percent
azure.documentdb_cassandraclusters.cassandra_table_coordinator_read_latency
(count)
Coordinator read latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_coordinator_read_latency_p99
(gauge)
p99 Coordinator read latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_coordinator_scan_latency
(count)
Coordinator range scan latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_coordinator_scan_latency_p99
(gauge)
p99 Coordinator range scan latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_dropped_mutations
(count)
Number of dropped mutations on this table.
azure.documentdb_cassandraclusters.cassandra_table_estimated_column_count_histogram
(count)
Estimated number of columns.
azure.documentdb_cassandraclusters.cassandra_table_estimated_column_count_histogram_p99
(gauge)
p99 Estimated number of columns.
azure.documentdb_cassandraclusters.cassandra_table_estimated_partition_count
(gauge)
Approximate number of keys in table.
azure.documentdb_cassandraclusters.cassandra_table_estimated_partition_size_histogram
(count)
Histogram of estimated partition size.
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_estimated_partition_size_histogram_p99
(gauge)
p99 Estimated partition size (in bytes).
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_index_summary_off_heap_memory_used
(gauge)
Off-heap memory used by index summary.
azure.documentdb_cassandraclusters.cassandra_table_key_cache_hit_rate
(gauge)
Key cache hit rate for this table.
Shown as percent
azure.documentdb_cassandraclusters.cassandra_table_live_disk_space_used
(count)
Disk space used by SSTables belonging to this table (in bytes).
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_live_scanned_histogram
(count)
Live cells scanned in queries on this table.
azure.documentdb_cassandraclusters.cassandra_table_live_scanned_histogram_p99
(gauge)
p99 Live cells scanned in queries on this table.
azure.documentdb_cassandraclusters.cassandra_table_live_sstable_count
(gauge)
Number of SSTables on disk for this table.
azure.documentdb_cassandraclusters.cassandra_table_max_partition_size
(gauge)
Size of the largest compacted partition (in bytes).
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_mean_partition_size
(gauge)
Size of the average compacted partition (in bytes).
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_memtable_columns_count
(gauge)
Total number of columns present in the memtable.
azure.documentdb_cassandraclusters.cassandra_table_memtable_off_heap_size
(gauge)
Total amount of data stored in the memtable that resides off-heap; including column related overhead and partitions overwritten.
azure.documentdb_cassandraclusters.cassandra_table_memtable_on_heap_size
(gauge)
Total amount of data stored in the memtable that resides on-heap; including column related overhead and partitions overwritten.
azure.documentdb_cassandraclusters.cassandra_table_memtable_switch_count
(count)
Number of times flush has resulted in the memtable being switched out.
azure.documentdb_cassandraclusters.cassandra_table_min_partition_size
(gauge)
Size of the smallest compacted partition (in bytes).
Shown as byte
azure.documentdb_cassandraclusters.cassandra_table_pending_compactions
(gauge)
Estimate of number of pending compactions for this table.
azure.documentdb_cassandraclusters.cassandra_table_pending_flushes
(count)
Estimated number of flush tasks pending for this table.
azure.documentdb_cassandraclusters.cassandra_table_percent_repaired
(gauge)
Percent of table data that is repaired on disk.
Shown as percent
azure.documentdb_cassandraclusters.cassandra_table_range_latency
(count)
Local range scan latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_range_latency_p99
(gauge)
p99 Local range scan latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_read_latency
(count)
Local read latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_read_latency_p99
(gauge)
p99 Local read latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_row_cache_hit
(count)
Number of table row cache hits.
azure.documentdb_cassandraclusters.cassandra_table_row_cache_hit_out_of_range
(count)
Number of table row cache hits that do not satisfy the query filter; thus went to disk.
azure.documentdb_cassandraclusters.cassandra_table_row_cache_miss
(count)
Number of table row cache misses.
azure.documentdb_cassandraclusters.cassandra_table_speculative_retries
(count)
Number of times speculative retries were sent for this table.
azure.documentdb_cassandraclusters.cassandra_table_sstables_per_read_histogram
(count)
Number of sstable data files accessed per single partition read. SSTables skipped due to Bloom Filters; min-max key or partition index lookup are not taken into account.
azure.documentdb_cassandraclusters.cassandra_table_sstables_per_read_histogram_p99
(gauge)
p99 Number of sstable data files accessed per single partition read. SSTables skipped due to Bloom Filters; min-max key or partition index lookup are not taken into account.
azure.documentdb_cassandraclusters.cassandra_table_tombstone_scanned_histogram
(count)
Tombstones scanned in queries on this table.
azure.documentdb_cassandraclusters.cassandra_table_tombstone_scanned_histogram_p99
(gauge)
p99 Tombstones scanned in queries on this table.
azure.documentdb_cassandraclusters.cassandra_table_total_disk_space_used
(count)
Total disk space used by SSTables belonging to this table; including obsolete ones waiting to be GC'd.
azure.documentdb_cassandraclusters.cassandra_table_view_lock_acquire_time
(count)
Time taken acquiring a partition lock for materialized view updates on this table.
azure.documentdb_cassandraclusters.cassandra_table_view_lock_acquire_time_p99
(gauge)
p99 Time taken acquiring a partition lock for materialized view updates on this table.
azure.documentdb_cassandraclusters.cassandra_table_view_read_time
(count)
Time taken during the local read of a materialized view update.
azure.documentdb_cassandraclusters.cassandra_table_view_read_time_p99
(gauge)
p99 Time taken during the local read of a materialized view update.
azure.documentdb_cassandraclusters.cassandra_table_waiting_on_free_memtable_space
(count)
Time spent waiting for free memtable space; either on- or off-heap.
azure.documentdb_cassandraclusters.cassandra_table_waiting_on_free_memtable_space_p99
(gauge)
p99 Time spent waiting for free memtable space; either on- or off-heap.
azure.documentdb_cassandraclusters.cassandra_table_write_latency
(count)
Local write latency for this table.
azure.documentdb_cassandraclusters.cassandra_table_write_latency_p99
(gauge)
p99 Local write latency for this table.
azure.documentdb_cassandraclusters.cassandra_thread_pools_active_tasks
(gauge)
Number of tasks being actively worked on by this pool.
azure.documentdb_cassandraclusters.cassandra_thread_pools_currently_blocked_tasks
(count)
Number of tasks that are currently blocked due to queue saturation but on retry will become unblocked.
azure.documentdb_cassandraclusters.cassandra_thread_pools_max_pool_size
(gauge)
The maximum number of threads in this pool.
azure.documentdb_cassandraclusters.cassandra_thread_pools_pending_tasks
(gauge)
Number of queued tasks queued up on this pool.
azure.documentdb_cassandraclusters.cassandra_thread_pools_total_blocked_tasks
(count)
Number of tasks that were blocked due to queue saturation.
azure.documentdb_cassandraclusters.count
(gauge)
Count of Cassandra clusters
azure.documentdb_cassandraclusters.cpu
(gauge)
CPU usage (active).
Shown as percent
azure.documentdb_cassandraclusters.disk_utilization
(gauge)
Disk utilization rate.
Shown as percent
azure.documentdb_cassandraclusters.diskio_merged_reads
(gauge)
Cumulative disk I/O merged reads.
Shown as operation
azure.documentdb_cassandraclusters.diskio_merged_writes
(gauge)
Cumulative disk I/O merged writes.
Shown as operation
azure.documentdb_cassandraclusters.diskio_read_bytes
(gauge)
Cumulative disk I/O read bytes.
Shown as byte
azure.documentdb_cassandraclusters.diskio_read_time
(gauge)
Cumulative disk I/O read time.
Shown as millisecond
azure.documentdb_cassandraclusters.diskio_reads
(gauge)
Cumulative disk I/O read counts.
Shown as operation
azure.documentdb_cassandraclusters.diskio_write_bytes
(gauge)
Cumulative disk I/O write bytes.
Shown as byte
azure.documentdb_cassandraclusters.diskio_write_time
(gauge)
Cumulative disk I/O write time.
Shown as millisecond
azure.documentdb_cassandraclusters.diskio_writes
(gauge)
Cumulative disk I/O write counts.
Shown as operation
azure.documentdb_cassandraclusters.ethtool_rx_bytes
(gauge)
Cumulative network received bytes.
Shown as byte
azure.documentdb_cassandraclusters.ethtool_rx_packets
(gauge)
Cumulative network received packets.
azure.documentdb_cassandraclusters.ethtool_tx_bytes
(gauge)
Cumulative network transmitted bytes.
Shown as byte
azure.documentdb_cassandraclusters.ethtool_tx_packets
(gauge)
network transmitted packets.
azure.documentdb_cassandraclusters.iops
(gauge)
I/O operations and bytes per second.
Shown as operation
azure.documentdb_cassandraclusters.percent_mem
(gauge)
Memory utilization rate.
Shown as percent
azure.documentdb_cassandraclusters.raid_array_degraded
(gauge)
Whether RAID array is degraded 1 means degraded and 0 means not degraded.
azure.documentdb_cassandraclusters.raid_array_rebuild
(gauge)
Percentage of RAID array rebuild.
Shown as percent
azure.documentdb_cassandraclusters.total_cpu
(gauge)
Average CPU usage (active) across all the CPUs.
Shown as percent

Événements

L’intégration Azure Cosmos DB n’inclut aucun événement.

Checks de service

L’intégration Azure Cosmos DB n’inclut aucun check de service.

Dépannage

Besoin d’aide ? Contactez l’assistance Datadog.

Pour aller plus loin

Documentation, liens et articles supplémentaires utiles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers