OCI Block Storage

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Overview

Oracle Cloud Infrastructure (OCI) Block Volumes provide reliable, high performance, low-cost block storage that persists beyond the lifespan of a virtual machine, with built-in redundancy and scalability.

This integration allows to you monitor and alert on the performance and replication status your Block Volume resources by using collecting metrics and tags from the [oci_blockstore][1] namespace.

Setup

Installation

Once you set up the [Oracle Cloud Infrastructure][2] integration, ensure that any namespaces mentioned above are included in your [Connector Hub][3].

Data Collected

Metrics

oci.blockstore.volume_guaranteed_iops
(gauge)
Rate of change for guaranteed IOPS per SLA. Expressed as the average of guaranteed IOPS during a given time interval.
Shown as operation
oci.blockstore.volume_guaranteed_throughput
(gauge)
Rate of change for guaranteed throughput per SLA. Expressed as megabytes per interval.
Shown as megabyte
oci.blockstore.volume_guaranteed_vpus_per_gb
(gauge)
Rate of change for currently active VPUs/GB. Expressed as the average of active VPUs/GB during a given time interval.
Shown as operation
oci.blockstore.volume_read_ops
(count)
Activity level from I/O reads. Expressed as reads per interval.
Shown as operation
oci.blockstore.volume_read_throughput
(gauge)
Read throughput. Expressed as bytes read per interval.
Shown as byte
oci.blockstore.volume_replication_seconds_since_last_sync
(gauge)
Time elapsed since the last synced cross region replica. Expressed in seconds.
Shown as second
oci.blockstore.volume_replication_seconds_since_last_upload
(gauge)
Time elapsed since the last cross region replica was uploaded. Expressed in seconds.
Shown as second
oci.blockstore.volume_throttled_ios
(count)
Total sum of all the I/O operations that were throttled during a given time interval.
Shown as operation
oci.blockstore.volume_write_ops
(count)
Activity level from I/O writes. Expressed as writes per interval.
Shown as operation
oci.blockstore.volume_write_throughput
(gauge)
Write throughput. Expressed as bytes written per interval.
Shown as byte

Service Checks

OCI Block Storage does not include any service checks.

Events

OCI Block Storage does not include any events.

Troubleshooting

Need help? Contact [Datadog support][5]. [1]: https://docs.oracle.com/en-us/iaas/Content/Block/References/volumemetrics.htm [2]: https://docs.datadoghq.com/integrations/oracle_cloud_infrastructure/ [3]: https://cloud.oracle.com/connector-hub/service-connectors [4]: https://github.com/DataDog/integrations-internal-core/blob/main/oci_block_storage/metadata.csv [5]: https://docs.datadoghq.com/help/

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers