Symantec Endpoint Protection

Supported OS Linux Windows Mac OS

Intégration1.0.0
Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Overview

Symantec Endpoint Protection is a client-server solution that protects laptops, desktops, and servers in your network against malware, risks, and vulnerabilities. Symantec Endpoint Protection combines virus protection with advanced threat protection to proactively secure your client computers against known and unknown threats, such as viruses, worms, Trojan horses, and adware. Symantec Endpoint Protection provides protection against even the most sophisticated attacks that evade traditional security measures, such as rootkits, zero-day attacks, and spyware that mutates.

This integration enriches and ingests the following logs from Symantec Endpoint Protection:

  • Audit logs: Record changes to policies such as policy updates, policy assignments, and more.
  • Risk logs: Track and record potential security risks detected on endpoints, including malware, vulnerabilities, and suspicious activities.
  • Scan logs: Record the results of antivirus scans, including detected malware, scan settings, and user information.
  • System logs: Record all administrative activities, client activities, server activities and client_server activities.
  • Security logs: Record security-related events, including attacks, compliance, and device control.
  • Application control logs: Record events related to application control, such as blocked or allowed applications.
  • Traffic logs: Record network traffic events, including incoming and outgoing connections, protocols, and ports.

You can also visualize detailed insights into the above-mentioned logs with the out-of-the-box dashboards. Once you’ve installed the integration, you can find the dashboards by searching for “symantec-endpoint-protection” in the dashboards list.

Setup

Installation

To install the Symantec Endpoint Protection integration, run the following Agent installation command and the steps below. For more information, see the Integration Management documentation.

Note: This step is not necessary for Agent version >= 7.52.0.

Linux command:

sudo -u dd-agent -- datadog-agent integration install datadog-symantec_endpoint_protection==1.0.0

Configuration

Log collection

  1. Collecting logs is disabled by default in the Datadog Agent. Enable it in datadog.yaml:

    logs_enabled: true
    
  2. Add this configuration block to your symantec_endpoint_protection.d/conf.yaml file to start collecting your Symantec Endpoint Protection logs.

    See the sample symantec_endpoint_protection.d/conf.yaml for available configuration options.

    logs:
     - type: udp
       port: <PORT>
       service: symantec-endpoint-protection
       source: symantec-endpoint-protection
    
  3. Restart the Agent.

  4. Configure Syslog Message Forwarding from Symantec Endpoint Protection Server:

    1. Log on to your Symantec Endpoint Protection Server.
    2. Click on Admin.
    3. Click on servers on the administrative panel.
    4. Select sites for which you want to forward logs.
    5. Click on Configure external logging.
    6. Enable Transmission of Logs to a Syslog Server.
    7. Provide your syslog server IP.
    8. Select network protocol as UDP.
    9. Provide the PORT where you want to forward logs.

Validation

Run the Agent’s status subcommand and look for symantec_endpoint_protection under the Checks section.

Data Collected

Logs

The Symantec Endpoint Protection integration collects audit, risk, scan, security, traffic, application control, and system logs.

Metrics

The Symantec Endpoint Protection integration does not include any metrics.

Events

The Symantec Endpoint Protection integration does not include any events.

Service Checks

The Symantec Endpoint Protection integration does not include any service checks.

Troubleshooting

Permission denied while port binding

If you see a Permission denied error while port binding in the Agent logs, see the following instructions:

  1. Binding to a port number under 1024 requires elevated permissions. Grant access to the port using the setcap command:

    • Grant access to the port using the setcap command:

      sudo setcap CAP_NET_BIND_SERVICE=+ep /opt/datadog-agent/bin/agent/agent
      
    • Verify the setup is correct by running the getcap command:

      sudo getcap /opt/datadog-agent/bin/agent/agent
      

      With the expected output:

      /opt/datadog-agent/bin/agent/agent = cap_net_bind_service+ep
      

      Note: Re-run this setcap command every time you upgrade the Agent.

  2. Restart the Agent.

Data is not being collected

Make sure that traffic is bypassed from the configured port if the firewall is enabled.

Port already in use

If you see the Port <PORT-NO> Already in Use error, see the following instructions. The example below is for PORT-NO = 514:

On systems using Syslog, if the Agent listens for Cisco Secure Firewall logs on port 514, the following error can appear in the Agent logs: Can't start UDP forwarder on port 514: listen udp :514: bind: address already in use.

This error occurs because by default, Syslog listens on port 514. To resolve this error, take one of the following steps:

  • Disable Syslog.
  • Configure the Agent to listen on a different, available port.

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers