VMware VeloCloud SD-WAN

Supported OS Linux Windows Mac OS

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Overview

Network Device Monitoring for VMware VeloCloud SD-WAN is currently in Preview.

This integration offers visibility into your VMware VeloCloud SD-WAN environment by collecting metrics for edge health monitoring, link performance, and flow analysis, for Network Device Monitoring.

Edge Health Monitoring

Edge Health Monitoring provides insights into the overall health and connectivity of edge devices within the VeloCloud network, allowing for proactive management and quick identification of issues impacting edge performance.

With automatic discovery of edge devices, this integration pulls in metadata to enable detailed analysis by location, edge type, and other dimensions.

Network Link Performance

Network Link Performance monitors network connections to ensure optimal link quality and connectivity between locations, allowing administrators to quickly identify and troubleshoot network issues.

Application Flow Analysis

Application Flow Analysis provides detailed visibility into application-specific traffic patterns, helping to optimize bandwidth usage and ensure critical applications maintain high performance.

Logs

In addition to metrics, alert logs can be collected. Search your Datadog logs with source:velocloud-sd-wan. If you installed the integration correctly, you should be able to see VeloCloud events.

Setup

Installation

  1. In the app, open the VeloCloud integration tile.
  2. Click Add Account.
  3. Choose a name for your VeloCloud account.
  4. Follow the instructions on the tile to install the integration.

Data Collected

Metrics

velocloud.edge.state
(gauge)
Edge specific state.
Shown as unit
velocloud.link.state
(gauge)
Link state.
Shown as unit
velocloud.tunnel_count
(count)
Total number of active tunnels.
Shown as connection
velocloud.memory_pct
(gauge)
Percentage of memory usage.
Shown as percent
velocloud.flow_count
(count)
Count of flows.
Shown as connection
velocloud.cpu_pct
(gauge)
CPU usage as a percentage.
Shown as percent
velocloud.cpu_core_temp
(gauge)
Temperature of the CPU core.
Shown as degree celsius
velocloud.handoff_queue_drops
(count)
Packets dropped from the handoff queue.
Shown as packet
velocloud.tunnel_count_v6
(count)
Total number of IPv6 tunnels.
Shown as connection
velocloud.flow.bytes_sent
(gauge)
Bytes sent in flow.
Shown as byte
velocloud.flow.bytes_received
(gauge)
Bytes received in flow.
Shown as byte
velocloud.flow.packets_sent
(count)
Packets sent in flow.
Shown as packet
velocloud.flow.packets_received
(count)
Packets received in flow.
Shown as packet
velocloud.flow.total_bytes
(count)
Total bytes in flow.
Shown as byte
velocloud.flow.total_packets
(count)
Total packets in flow.
Shown as packet
velocloud.flow.flow_count
(count)
Count of active flows.
Shown as connection
velocloud.link.p1_bytes_received
(count)
Priority 1 bytes received over link.
Shown as byte
velocloud.link.p1_bytes_sent
(count)
Priority 1 bytes transmitted over link.
Shown as byte
velocloud.link.p1_packets_received
(count)
Priority 1 packets received over link.
Shown as packet
velocloud.link.p1_packets_sent
(count)
Priority 1 packets transmitted over link.
Shown as packet
velocloud.link.p2_bytes_received
(count)
Priority 2 bytes received over link.
Shown as byte
velocloud.link.p2_bytes_sent
(count)
Priority 2 bytes transmitted over link.
Shown as byte
velocloud.link.p2_packets_received
(count)
Priority 2 packets received over link.
Shown as packet
velocloud.link.p2_packets_sent
(count)
Priority 2 packets transmitted over link.
Shown as packet
velocloud.link.p3_bytes_received
(count)
Priority 3 bytes received over link.
Shown as byte
velocloud.link.p3_bytes_sent
(count)
Priority 3 bytes transmitted over link.
Shown as byte
velocloud.link.p3_packets_received
(count)
Priority 3 packets received over link.
Shown as packet
velocloud.link.p3_packets_sent
(count)
Priority 3 packets transmitted over link.
Shown as packet
velocloud.link.control_bytes_received
(count)
Control bytes received over link.
Shown as byte
velocloud.link.control_bytes_sent
(count)
Control bytes transmitted over link.
Shown as byte
velocloud.link.control_packets_received
(count)
Control packets received over link.
Shown as packet
velocloud.link.control_packets_sent
(count)
Control packets transmitted over link.
Shown as packet
velocloud.link.bps_of_best_path_received
(gauge)
Bytes per second of the best path received.
Shown as bit
velocloud.link.bps_of_best_path_sent
(gauge)
Bytes per second of the best path sent.
Shown as bit
velocloud.link.best_jitter_ms_received
(gauge)
Best jitter in milliseconds received.
Shown as millisecond
velocloud.link.best_jitter_ms_sent
(gauge)
Best jitter in milliseconds sent.
Shown as millisecond
velocloud.link.best_latency_ms_received
(gauge)
Best latency in milliseconds received.
Shown as millisecond
velocloud.link.best_latency_ms_sent
(gauge)
Best latency in milliseconds sent.
Shown as millisecond
velocloud.link.best_loss_pct_received
(gauge)
Best packet loss percentage received.
Shown as percent
velocloud.link.best_loss_pct_sent
(gauge)
Best packet loss percentage sent.
Shown as percent
velocloud.link.score_sent
(gauge)
Link quality score sent.
velocloud.link.score_received
(gauge)
Link quality score received.
velocloud.link.signal_strength
(gauge)
Signal strength.
velocloud.link.auto_dual_mode
(gauge)
Auto dual mode status.
Shown as unit
velocloud.flow.packets_received
(count)
Total packets received in flow.
Shown as packet
velocloud.flow.packets_sent
(count)
Total packets sent in flow.
Shown as packet
velocloud.edge.tunnel_count
(count)
Edge specific total number of active tunnels.
Shown as connection
velocloud.edge.memory_pct
(gauge)
Edge specific percentage of memory usage.
Shown as percent
velocloud.edge.flow.flow_count
(count)
Edge specific count of flows.
Shown as connection
velocloud.edge.cpu_pct
(gauge)
Edge specific CPU usage as a percentage.
Shown as percent
velocloud.edge.cpu_core_temp
(gauge)
Edge specific temperature of the CPU core.
Shown as degree celsius
velocloud.edge.handoff_queue_drops
(count)
Edge specific packets dropped from the handoff queue.
Shown as packet
velocloud.edge.tunnel_count_v6
(count)
Edge specific total number of IPv6 tunnels.
Shown as connection
velocloud.edge.flow.bytes_sent
(gauge)
Edge specific bytes sent in flow.
Shown as byte
velocloud.edge.flow.bytes_received
(gauge)
Edge specific bytes received in flow.
Shown as byte
velocloud.edge.flow.packets_sent
(count)
Edge specific packets sent in flow.
Shown as packet
velocloud.edge.flow.packets_received
(count)
Edge specific packets received in flow.
Shown as packet
velocloud.edge.flow.total_bytes
(count)
Edge specific total bytes in flow.
Shown as byte
velocloud.edge.flow.total_packets
(count)
Edge specific total packets in flow.
Shown as packet
velocloud.edge.link.p1_bytes_received
(count)
Edge specific priority 1 bytes received over link.
Shown as byte
velocloud.edge.link.p1_bytes_sent
(count)
Edge specific priority 1 bytes transmitted over link.
Shown as byte
velocloud.edge.link.p1_packets_received
(count)
Edge specific priority 1 packets received over link.
Shown as packet
velocloud.edge.link.p1_packets_sent
(count)
Edge specific priority 1 packets transmitted over link.
Shown as packet
velocloud.edge.link.p2_bytes_received
(count)
Edge specific priority 2 bytes received over link.
Shown as byte
velocloud.edge.link.p2_bytes_sent
(count)
Edge specific priority 2 bytes transmitted over link.
Shown as byte
velocloud.edge.link.p2_packets_received
(count)
Edge specific priority 2 packets received over link.
Shown as packet
velocloud.edge.link.p2_packets_sent
(count)
Edge specific priority 2 packets transmitted over link.
Shown as packet
velocloud.edge.link.p3_bytes_received
(count)
Edge specific priority 3 bytes received over link.
Shown as byte
velocloud.edge.link.p3_bytes_sent
(count)
Edge specific priority 3 bytes transmitted over link.
Shown as byte
velocloud.edge.link.p3_packets_received
(count)
Edge specific priority 3 packets received over link.
Shown as packet
velocloud.edge.link.p3_packets_sent
(count)
Edge specific priority 3 packets transmitted over link.
Shown as packet
velocloud.edge.link.control_bytes_received
(count)
Edge specific control bytes received over link.
Shown as byte
velocloud.edge.link.control_bytes_sent
(count)
Edge specific control bytes transmitted over link.
Shown as byte
velocloud.edge.link.control_packets_received
(count)
Edge specific control packets received over link.
Shown as packet
velocloud.edge.link.control_packets_sent
(count)
Edge specific control packets transmitted over link.
Shown as packet
velocloud.edge.link.bps_of_best_path_received
(gauge)
Edge specific bytes per second of the best path received.
Shown as bit
velocloud.edge.link.bps_of_best_path_sent
(gauge)
Edge specific bytes per second of the best path sent.
Shown as bit
velocloud.edge.link.best_jitter_ms_received
(gauge)
Edge specific best jitter in milliseconds received.
Shown as millisecond
velocloud.edge.link.best_jitter_ms_sent
(gauge)
Edge specific best jitter in milliseconds sent.
Shown as millisecond
velocloud.edge.link.best_latency_ms_received
(gauge)
Edge specific best latency in milliseconds received.
Shown as millisecond
velocloud.edge.link.best_latency_ms_sent
(gauge)
Edge specific best latency in milliseconds sent.
Shown as millisecond
velocloud.edge.link.best_loss_pct_received
(gauge)
Edge specific best packet loss percentage received.
Shown as percent
velocloud.edge.link.best_loss_pct_sent
(gauge)
Edge specific best packet loss percentage sent.
Shown as percent
velocloud.edge.link.score_sent
(gauge)
Edge specific link quality score sent.
velocloud.edge.link.score_received
(gauge)
Edge specific link quality score received.
velocloud.edge.link.signal_strength
(gauge)
Edge specific signal strength.
velocloud.edge.link.auto_dual_mode
(gauge)
Edge specific auto dual mode status.
Shown as unit
velocloud.edge.flow.bytes_received
(gauge)
Edge specific bytes received in flow.
Shown as byte
velocloud.edge.flow.bytes_sent
(gauge)
Edge specific bytes sent in flow.
Shown as byte
velocloud.edge.flow.flow_count
(count)
Edge specific count of flows.
Shown as connection
velocloud.edge.flow.packets_received
(count)
Edge specific packets received in flow.
Shown as packet
velocloud.edge.flow.packets_sent
(count)
Edge specific packets sent in flow.
Shown as packet
velocloud.edge.flow.total_bytes
(count)
Edge specific total bytes in flow.
Shown as byte
velocloud.edge.flow.total_packets
(count)
Edge specific total packets in flow.
Shown as packet
velocloud.edge.flow_count
(count)
Edge specific count of active flows.
Shown as connection
velocloud.edge.link_quality.distribution.transactional.green
(gauge)
Edge specific transactional quality distribution (Green).
Shown as percent
velocloud.edge.link_quality.distribution.transactional.offline
(gauge)
Edge specific transactional quality distribution (Offline).
Shown as percent
velocloud.edge.link_quality.distribution.transactional.red
(gauge)
Edge specific transactional quality distribution (Red).
Shown as percent
velocloud.edge.link_quality.distribution.transactional.unknown
(gauge)
Edge specific transactional quality distribution (Unknown).
Shown as percent
velocloud.edge.link_quality.distribution.transactional.yellow
(gauge)
Edge specific transactional quality distribution (Yellow).
Shown as percent
velocloud.edge.link_quality.distribution.video.green
(gauge)
Edge specific video quality distribution (Green).
Shown as percent
velocloud.edge.link_quality.distribution.video.offline
(gauge)
Edge specific video quality distribution (Offline).
Shown as percent
velocloud.edge.link_quality.distribution.video.red
(gauge)
Edge specific video quality distribution (Red).
Shown as percent
velocloud.edge.link_quality.distribution.video.unknown
(gauge)
Edge specific video quality distribution (Unknown).
Shown as percent
velocloud.edge.link_quality.distribution.video.yellow
(gauge)
Edge specific video quality distribution (Yellow).
Shown as percent
velocloud.edge.link_quality.distribution.voice.green
(gauge)
Edge specific voice quality distribution (Green).
Shown as percent
velocloud.edge.link_quality.distribution.voice.offline
(gauge)
Edge specific voice quality distribution (Offline).
Shown as percent
velocloud.edge.link_quality.distribution.voice.red
(gauge)
Edge specific voice quality distribution (Red).
Shown as percent
velocloud.edge.link_quality.distribution.voice.unknown
(gauge)
Edge specific voice quality distribution (Unknown).
Shown as percent
velocloud.edge.link_quality.distribution.voice.yellow
(gauge)
Edge specific voice quality distribution (Yellow).
Shown as percent
velocloud.edge.link_quality.sample_count
(count)
Edge specific count of link quality samples.
Shown as connection
velocloud.edge.link_quality.sample_length
(gauge)
Edge specific length of link quality sample.
Shown as millisecond
velocloud.edge.link_quality.score.overall
(gauge)
Edge specific overall link quality score.
velocloud.edge.link_quality.score.transactional
(gauge)
Edge specific transactional quality score.
velocloud.edge.link_quality.score.video
(gauge)
Edge specific video quality score.
velocloud.edge.link_quality.score.voice
(gauge)
Edge specific voice quality score.
collects, see the VeloCloud documentation

Service Checks

VeloCloud SD-WAN does not include any service checks.

Events

VeloCloud SD-WAN does not include any events.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers