Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Use the following instructions to enable Misconfigurations, Threat Detection, and Vulnerability Management.

Collecting events using Cloud Security Management will affect your billing. For more information, see Datadog Pricing.

Prerequisites

Note: SBOM collection is not compatible with the image streaming feature in Google Kubernetes Engine (GKE). To disable it, see the Disable Image streaming section of the GKE docs.

Installation

  1. Add the following to the spec section of the datadog-agent.yaml file:

    # datadog-agent.yaml file
    apiVersion: datadoghq.com/v2alpha1
    kind: DatadogAgent
    metadata:
      name: datadog
    spec:
      features:
        remoteConfiguration:
          enabled: true
        # Enables Threat Detection
        cws:
          enabled: true
        # Enables Misconfigurations
        cspm:
          enabled: true
          hostBenchmarks:
            enabled: true
        # Enables the image metadata collection and Software Bill of Materials (SBOM) collection
        sbom:
          enabled: true
          # Enables Container Vulnerability Management
          # Image collection is enabled by default with Datadog Operator version `>= 1.3.0`
          containerImage:
            enabled: true
    
            # Uncomment the following line if you are using Google Kubernetes Engine (GKE) or Amazon Elastic Kubernetes (EKS)
            # uncompressedLayersSupport: true
    
          # Enables Host Vulnerability Management
          host:
            enabled: true
    
  2. Apply the changes and restart the Agent.

  1. Add the following to the datadog section of the datadog-values.yaml file:

    # datadog-values.yaml file
    datadog:
      remoteConfiguration:
        enabled: true
      securityAgent:
        # Enables Threat Detection
        runtime:
          enabled: true
        # Enables Misconfigurations
        compliance:
          enabled: true
          host_benchmarks:
            enabled: true
      sbom:
        containerImage:
          enabled: true
    
          # Uncomment the following line if you are using Google Kubernetes Engine (GKE) or Amazon Elastic Kubernetes (EKS)
          # uncompressedLayersSupport: true
    
        # Enables Host Vulnerability Management
        host:
          enabled: true
    
        # Enables Container Vulnerability Management
        # Image collection is enabled by default with Datadog Helm version `>= 3.46.0`
        # containerImageCollection:
        #   enabled: true
    
  2. Restart the Agent.

Add the following settings to the env section of security-agent and system-probe in the daemonset.yaml file:

  # Source: datadog/templates/daemonset.yaml
  apiVersion:app/1
  kind: DaemonSet
  [...]
  spec:
  [...]
  spec:
      [...]
        containers:
        [...]
          - name: agent
            [...]
            env:
              - name: DD_REMOTE_CONFIGURATION_ENABLED
                value: "true"
          - name: system-probe
            [...]
            env:
              - name: DD_RUNTIME_SECURITY_CONFIG_ENABLED
                value: "true"
              - name: DD_RUNTIME_SECURITY_CONFIG_REMOTE_CONFIGURATION_ENABLED
                value: "true"
              - name: DD_COMPLIANCE_CONFIG_ENABLED
                value: "true"
              - name: DD_COMPLIANCE_CONFIG_HOST_BENCHMARKS_ENABLED
                value: "true"
              - name: DD_SBOM_CONTAINER_IMAGE_USE_MOUNT
                value: "true"
          [...]
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers