Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Metadata

ID: csharp-best-practices/use-assembly-load

Language: C#

Severity: Notice

Category: Error Prone

Description

This rule is intended to catch when Assembly.LoadFromAssembly.LoadFile, or Assembly.LoadWithPartialName  are used. DataDog recommends using Assembly.Load which will include the full specification of the DLL that needs to be loaded. The other methods might end up with another one that could lead to unexpected behavior.

Non-Compliant Code Examples

static void Main(string[] args)
{
    Assembly.LoadFrom("");
    Assembly.LoadFile("");
    Assembly.LoadWithPartialName("");
}

Compliant Code Examples

static void Main(string[] args)
{
    Assembly.Load("");
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers