Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Metadata

ID: kotlin-code-style/no-empty-lead-line-class

Language: Kotlin

Severity: Notice

Category: Code Style

Description

This rule is in place to ensure that Kotlin classes do not begin with unnecessary blank lines. The presence of blank lines at the start of a class can lead to confusion and can make the code harder to read. It breaks the flow of the code and can make it less intuitive to understand the structure of the class.

Non-Compliant Code Examples

class Foo {

    val foo = "foo"
}

Compliant Code Examples

class Foo {
    val bar = "bar"
    val foo = "foo"
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers